[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1159865":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1159865,821,1,"单选题","现场拌制的砂浆应随拌随用，当时期间最高气温超过30℃时，应在（ ）内使用",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","1h",false,{"key":16,"text":17,"correct":18},"B","2h",true,{"key":20,"text":21,"correct":14},"C","3h",{"key":23,"text":24,"correct":14},"D","4h","现场拌制的砂浆应随拌随用，当时期间最高气温超过30℃时，应在2h内使用。",{"id":6,"name":27,"category":28,"favorite":29},"(材料员)基础知识","建筑工程",0]