[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-820-1":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":618},{"id":5,"name":6,"category":7,"favorite":8},820,"通用基础","建筑工程",0,1,50,554,[13,33,45,57,69,81,93,105,117,129,141,153,165,177,189,201,213,225,237,249,261,273,285,297,309,321,333,345,357,369,381,393,405,417,429,441,453,465,477,486,498,510,522,534,546,558,570,582,594,606],{"id":14,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":17,"answer":26,"analysis":32},1159301,"单选题","下列措施中,不属于施工准备阶段的安全技术措施的是( )。",[18,22,25,29],{"key":19,"text":20,"correct":21},"A","技术准备",false,{"key":23,"text":24,"correct":21},"B","物资准备",{"key":26,"text":27,"correct":28},"C","资金准备",true,{"key":30,"text":31,"correct":21},"D","施工队伍准备","",{"id":34,"libraryId":5,"type":9,"typeLabel":15,"stem":35,"options":36,"answer":19,"analysis":32},1159302,"施工项目过程控制中,加强专项检查,包括自检、( )、互检。",[37,39,41,43],{"key":19,"text":38,"correct":28},"专检",{"key":23,"text":40,"correct":21},"全检",{"key":26,"text":42,"correct":21},"交接检",{"key":30,"text":44,"correct":21},"质检",{"id":46,"libraryId":5,"type":9,"typeLabel":15,"stem":47,"options":48,"answer":26,"analysis":32},1159303,"下列各项措施中,不属于施工项目质量控制的措施的是( )。",[49,51,53,55],{"key":19,"text":50,"correct":21},"提高管理、施工及操作人员自身素质",{"key":23,"text":52,"correct":21},"提高施工的质量管理水平",{"key":26,"text":54,"correct":28},"尽可能采用先进的施工技术、方法和新材料、新工艺、新技术,保证进度目标实现",{"key":30,"text":56,"correct":21},"加强施工项目的过程控制",{"id":58,"libraryId":5,"type":9,"typeLabel":15,"stem":59,"options":60,"answer":30,"analysis":32},1159304,"为了取得施工成本管理的理想效果,必须从多方面采取有效措施实施管理,这些措施不包括( )。",[61,63,65,67],{"key":19,"text":62,"correct":21},"组织措施",{"key":23,"text":64,"correct":21},"技术措施",{"key":26,"text":66,"correct":21},"经济措施",{"key":30,"text":68,"correct":28},"管理措施",{"id":70,"libraryId":5,"type":9,"typeLabel":15,"stem":71,"options":72,"answer":23,"analysis":32},1159305,"施工项目目标控制包括:施工项目进度控制、施工项目质量控制、( )、施工项目安全控制四个方面。",[73,75,77,79],{"key":19,"text":74,"correct":21},"施工项目管理控制",{"key":23,"text":76,"correct":28},"施工项目成本控制",{"key":26,"text":78,"correct":21},"施工项目人力控制",{"key":30,"text":80,"correct":21},"施工项目物资控制",{"id":82,"libraryId":5,"type":9,"typeLabel":15,"stem":83,"options":84,"answer":30,"analysis":32},1159306,"施工项目的劳动组织不包括下列的( )。",[85,87,89,91],{"key":19,"text":86,"correct":21},"劳务输入",{"key":23,"text":88,"correct":21},"劳动力组织",{"key":26,"text":90,"correct":21},"项目经理部对劳务队伍的管理",{"key":30,"text":92,"correct":28},"劳务输出",{"id":94,"libraryId":5,"type":9,"typeLabel":15,"stem":95,"options":96,"answer":19,"analysis":32},1159307,"下列施工项目管理程序的排序正确的是( )。",[97,99,101,103],{"key":19,"text":98,"correct":28},"投标、签订合同→施工准备→施工→验收交工与结算→用后服务",{"key":23,"text":100,"correct":21},"施工准备→投标、签订合同→施工→验收交工与结算→用后服务",{"key":26,"text":102,"correct":21},"投标、签订合同→施工→施工准备→验收交工与结算→用后服务",{"key":30,"text":104,"correct":21},"投标、签订合同→施工准备→施工→验收交工→用后服务与结算",{"id":106,"libraryId":5,"type":9,"typeLabel":15,"stem":107,"options":108,"answer":19,"analysis":32},1159308,"涂料防水施工中,下列保护层不适于在立面使用的是( )。",[109,111,113,115],{"key":19,"text":110,"correct":28},"细石混凝土保护层",{"key":23,"text":112,"correct":21},"水泥砂浆保护层",{"key":26,"text":114,"correct":21},"泡沫塑料保护层",{"key":30,"text":116,"correct":21},"砖墙保护层",{"id":118,"libraryId":5,"type":9,"typeLabel":15,"stem":119,"options":120,"answer":26,"analysis":32},1159309,"下列关于涂料防水施工工艺的说法中,错误的是( )。",[121,123,125,127],{"key":19,"text":122,"correct":21},"防水涂料防水层属于柔性防水层",{"key":23,"text":124,"correct":21},"一般采用外防外涂和外防内涂施工方法",{"key":26,"text":126,"correct":28},"其施工工艺流程为:找平层施工→保护层施工→防水层施工→质量检查",{"key":30,"text":128,"correct":21},"找平层有水泥砂浆找平层、沥青砂浆找平层、细石混凝土找平层三种",{"id":130,"libraryId":5,"type":9,"typeLabel":15,"stem":131,"options":132,"answer":23,"analysis":32},1159310,"下列关于掺防水剂水泥砂浆防水施工的说法中,错误的是( )。",[133,135,137,139],{"key":19,"text":134,"correct":21},"施工工艺流程为:找平层施工→防水层施工→质量检查",{"key":23,"text":136,"correct":28},"当施工采用抹压法时,先在基层涂刷一层1:0.4的水泥浆,随后分层铺抹防水砂浆,每层厚度为10～15mm,总厚度不小于30mm",{"key":26,"text":138,"correct":21},"氯化铁防水砂浆施工时,底层防水砂浆抹完12h后,抹压面层防水砂浆,其厚13mm分两遍抹压",{"key":30,"text":140,"correct":21},"防水层施工时的环境温度为5～35℃",{"id":142,"libraryId":5,"type":9,"typeLabel":15,"stem":143,"options":144,"answer":19,"analysis":32},1159311,"下列关于防水砂浆防水层施工的说法中,正确的是( )。",[145,147,149,151],{"key":19,"text":146,"correct":28},"砂浆防水工程是利用一定配合比的水泥浆和水泥砂浆（称防水砂浆）分层分次施工,相互交替抹压密实的封闭防水整体",{"key":23,"text":148,"correct":21},"防水砂浆防水层的背水面基层的防水层采用五层做法,迎水面基层的防水层采用四层做法",{"key":26,"text":150,"correct":21},"防水层每层应连续施工,素灰层与砂浆层可不在同一天施工完毕",{"key":30,"text":152,"correct":21},"揉浆是使水泥砂浆素灰相互渗透结合牢固,既保护素灰层又起到防水作用,当揉浆难时,允许加水稀释",{"id":154,"libraryId":5,"type":9,"typeLabel":15,"stem":155,"options":156,"answer":23,"analysis":32},1159312,"下列焊接方法中,不属于钢结构工程常用的是( )。",[157,159,161,163],{"key":19,"text":158,"correct":21},"自动（半自动）埋弧焊",{"key":23,"text":160,"correct":28},"闪光对焊",{"key":26,"text":162,"correct":21},"药皮焊条手工电弧焊",{"key":30,"text":164,"correct":21},"气体保护焊",{"id":166,"libraryId":5,"type":9,"typeLabel":15,"stem":167,"options":168,"answer":26,"analysis":32},1159313,"高强度螺栓的拧紧问题说法错误的是( )。",[169,171,173,175],{"key":19,"text":170,"correct":21},"高强度螺栓连接的拧紧应分为初拧、终拧",{"key":23,"text":172,"correct":21},"对于大型节点应分为初拧、复拧、终拧",{"key":26,"text":174,"correct":28},"复拧扭矩应当大于初拧扭矩",{"key":30,"text":176,"correct":21},"扭剪型高强度螺栓拧紧时对螺母施加逆时针力矩",{"id":178,"libraryId":5,"type":9,"typeLabel":15,"stem":179,"options":180,"answer":19,"analysis":32},1159314,"钢结构的连接方法不包括( )。",[181,183,185,187],{"key":19,"text":182,"correct":28},"绑扎连接",{"key":23,"text":184,"correct":21},"焊接",{"key":26,"text":186,"correct":21},"螺栓连接",{"key":30,"text":188,"correct":21},"铆钉连接",{"id":190,"libraryId":5,"type":9,"typeLabel":15,"stem":191,"options":192,"answer":19,"analysis":32},1159315,"混凝土浇水养护的时间:对采用硅酸盐水泥、普通硅酸盐水泥或矿渣硅酸盐水泥拌制的混凝土,不得少于( )。",[193,195,197,199],{"key":19,"text":194,"correct":28},"7d",{"key":23,"text":196,"correct":21},"10d",{"key":26,"text":198,"correct":21},"5d",{"key":30,"text":200,"correct":21},"14d",{"id":202,"libraryId":5,"type":9,"typeLabel":15,"stem":203,"options":204,"answer":23,"analysis":32},1159316,"施工缝一般应留在构件( )部位。",[205,207,209,211],{"key":19,"text":206,"correct":21},"受压最小",{"key":23,"text":208,"correct":28},"受剪最小",{"key":26,"text":210,"correct":21},"受弯最小",{"key":30,"text":212,"correct":21},"受扭最小",{"id":214,"libraryId":5,"type":9,"typeLabel":15,"stem":215,"options":216,"answer":30,"analysis":32},1159317,"浇筑竖向结构混凝土前,应先在底部浇筑一层水泥砂浆,对砂浆的要求是( )。",[217,219,221,223],{"key":19,"text":218,"correct":21},"与混凝土内砂浆成分相同且强度高一级",{"key":23,"text":220,"correct":21},"与混凝土内砂浆成分不同且强度高一级",{"key":26,"text":222,"correct":21},"与混凝土内砂浆成分不同",{"key":30,"text":224,"correct":28},"与混凝土内砂浆成分相同",{"id":226,"libraryId":5,"type":9,"typeLabel":15,"stem":227,"options":228,"answer":26,"analysis":32},1159318,"下列各项中,不属于混凝土工程施工内容的是( )。",[229,231,233,235],{"key":19,"text":230,"correct":21},"混凝土拌合料的制备",{"key":23,"text":232,"correct":21},"混凝土拌合料的养护",{"key":26,"text":234,"correct":28},"混凝土拌合料的强度测定",{"key":30,"text":236,"correct":21},"混凝土拌合料的振捣",{"id":238,"libraryId":5,"type":9,"typeLabel":15,"stem":239,"options":240,"answer":30,"analysis":32},1159319,"下列各项中,关于钢筋安装的基本规定正确的说法是( )。",[241,243,245,247],{"key":19,"text":242,"correct":21},"钢筋绑扎用的22号钢丝只用于绑扎直径14mm以下的钢筋",{"key":23,"text":244,"correct":21},"基础底板采用双层钢筋网时,在上层钢筋网下面每隔1.5m放置一个钢筋撑脚",{"key":26,"text":246,"correct":21},"基础钢筋绑扎的施工工艺流程为:清理垫层、画线→摆放下层钢筋,并固定绑扎→摆放钢筋撑脚（双层钢筋时）→绑扎柱墙预留钢筋→绑扎上层钢筋",{"key":30,"text":248,"correct":28},"控制混凝土保护层用的水泥砂浆垫块或塑料卡的厚度,应等于保护层厚度",{"id":250,"libraryId":5,"type":9,"typeLabel":15,"stem":251,"options":252,"answer":23,"analysis":32},1159320,"砖砌体的施工工艺过程正确的是( )。",[253,255,257,259],{"key":19,"text":254,"correct":21},"找平、放线、摆砖样、盘角、立皮数杆、砌筑、勾缝、清理、楼层标高控制、楼层轴线标引等",{"key":23,"text":256,"correct":28},"找平、放线、摆砖样、立皮数杆、盘角、砌筑、清理、勾缝、楼层轴线标引、楼层标高控制等",{"key":26,"text":258,"correct":21},"找平、放线、摆砖样、立皮数杆、盘角、砌筑、勾缝、清理,楼层轴线标引、楼层标高控制等",{"key":30,"text":260,"correct":21},"找平、放线、立皮数杆、摆砖样、盘角、挂线、砌筑、勾缝、清理、楼层标高控制、楼层轴线标引等",{"id":262,"libraryId":5,"type":9,"typeLabel":15,"stem":263,"options":264,"answer":23,"analysis":32},1159321,"下列关于基坑（槽）开挖施工工艺的说法中,正确的是( )。",[265,267,269,271],{"key":19,"text":266,"correct":21},"采用机械开挖基坑时,为避免破坏基底土,应在标高以上预留15～50cm的土层由人工挖掘修整",{"key":23,"text":268,"correct":28},"在基坑（槽）四侧或两侧挖好临时排水沟和集水井,或采用井点降水,将水位降低至坑、槽底以下500mm,以利于土方开挖",{"key":26,"text":270,"correct":21},"雨期施工时,基坑（槽）需全段开挖,尽快完成",{"key":30,"text":272,"correct":21},"当基坑挖好后不能立即进行下道工序时,应预留30cm的土不挖,待下道工序开始再挖至设计标高",{"id":274,"libraryId":5,"type":9,"typeLabel":15,"stem":275,"options":276,"answer":23,"analysis":32},1159322,"下列关于建筑剖面图和建筑详图基本规定的说法中,错误的是( )。",[277,279,281,283],{"key":19,"text":278,"correct":21},"剖面图一般表示房屋在高度方向的结构形式",{"key":23,"text":280,"correct":28},"建筑剖面图中高度方向的尺寸包括总尺寸、内部尺寸和细部尺寸",{"key":26,"text":282,"correct":21},"建筑剖面图中不能详细表示清楚的部位应引出索引符号,另用详图表示",{"key":30,"text":284,"correct":21},"需要绘制详图或局部平面放大的位置一般包括内外墙节点、楼梯、电梯、厨房、卫生间、门窗、室内外装饰等",{"id":286,"libraryId":5,"type":9,"typeLabel":15,"stem":287,"options":288,"answer":19,"analysis":32},1159323,"下列关于建筑总平面图图示内容的说法中,正确的是( )。",[289,291,293,295],{"key":19,"text":290,"correct":28},"新建建筑物的定位一般采用两种方法,一是按原有建筑物或原有道路定位;二是按坐标定位",{"key":23,"text":292,"correct":21},"在总平面图中,标高以米为单位,并保留至小数点后三位",{"key":26,"text":294,"correct":21},"新建房屋所在地区风向情况的示意图即为风玫瑰图,风玫瑰图不可用于表明房屋和地物的朝向情况",{"key":30,"text":296,"correct":21},"临时建筑物在设计和施工中可以超过建筑红线",{"id":298,"libraryId":5,"type":9,"typeLabel":15,"stem":299,"options":300,"answer":26,"analysis":32},1159324,"下列各项中,不属于设备施工图的是( )。",[301,303,305,307],{"key":19,"text":302,"correct":21},"给水排水施工图",{"key":23,"text":304,"correct":21},"采暖通风与空调施工图",{"key":26,"text":306,"correct":28},"设备详图",{"key":30,"text":308,"correct":21},"电气设备施工图",{"id":310,"libraryId":5,"type":9,"typeLabel":15,"stem":311,"options":312,"answer":30,"analysis":32},1159325,"按照内容和作用不同,下列不属于房屋建筑施工图的是( )。",[313,315,317,319],{"key":19,"text":314,"correct":21},"建筑施工图",{"key":23,"text":316,"correct":21},"结构施工图",{"key":26,"text":318,"correct":21},"设备施工图",{"key":30,"text":320,"correct":28},"系统施工图",{"id":322,"libraryId":5,"type":9,"typeLabel":15,"stem":323,"options":324,"answer":19,"analysis":32},1159326,"下列关于烧结砖的分类、主要技术要求及应用的相关说法中,正确的是( )。",[325,327,329,331],{"key":19,"text":326,"correct":28},"强度、抗风化性能和放射性物质合格的烧结普通砖,根据尺寸偏差、外观质量、泛霜和石灰爆裂等指标,分为优等品、一等品、合格品三个等级",{"key":23,"text":328,"correct":21},"强度和抗风化性能合格的烧结空心砖,根据尺寸偏差、外观质量、孔型及孔洞排列、泛霜、石灰爆裂分为优等品、一等品、合格品三个等级",{"key":26,"text":330,"correct":21},"烧结多孔砖主要用作非承重墙,如多层建筑内隔墙或框架结构的填充墙",{"key":30,"text":332,"correct":21},"烧结空心砖在对安全性要求低的建筑中,可以用于承重墙体",{"id":334,"libraryId":5,"type":9,"typeLabel":15,"stem":335,"options":336,"answer":23,"analysis":32},1159327,"下列对于砂浆与水泥的说法中错误的是( )。",[337,339,341,343],{"key":19,"text":338,"correct":21},"根据胶凝材料的不同,建筑砂浆可分为石灰砂浆、水泥砂浆和混合砂浆",{"key":23,"text":340,"correct":28},"水泥属于水硬性胶凝材料,因而只能在潮湿环境与水中凝结、硬化、保持和发展强度",{"key":26,"text":342,"correct":21},"水泥砂浆强度高、耐久性和耐火性好,常用于地下结构或经常受水侵蚀的砌体部位",{"key":30,"text":344,"correct":21},"水泥按其用途和性能可分为通用水泥、专用水泥以及特性水泥",{"id":346,"libraryId":5,"type":9,"typeLabel":15,"stem":347,"options":348,"answer":23,"analysis":32},1159328,"下列各项,不属于常用早强剂的是( )。",[349,351,353,355],{"key":19,"text":350,"correct":21},"氯盐类早强剂",{"key":23,"text":352,"correct":28},"硝酸盐类早强剂",{"key":26,"text":354,"correct":21},"硫酸盐类早强剂",{"key":30,"text":356,"correct":21},"有机胺类早强剂",{"id":358,"libraryId":5,"type":9,"typeLabel":15,"stem":359,"options":360,"answer":19,"analysis":32},1159329,"气硬性胶凝材料一般只适用于( )环境中。",[361,363,365,367],{"key":19,"text":362,"correct":28},"干燥",{"key":23,"text":364,"correct":21},"干湿交替",{"key":26,"text":366,"correct":21},"潮湿",{"key":30,"text":368,"correct":21},"水中",{"id":370,"libraryId":5,"type":9,"typeLabel":15,"stem":371,"options":372,"answer":26,"analysis":32},1159330,"属于水硬性胶凝材料的是( )。",[373,375,377,379],{"key":19,"text":374,"correct":21},"石灰",{"key":23,"text":376,"correct":21},"石膏",{"key":26,"text":378,"correct":28},"水泥",{"key":30,"text":380,"correct":21},"水玻璃",{"id":382,"libraryId":5,"type":9,"typeLabel":15,"stem":383,"options":384,"answer":23,"analysis":32},1159331,"《劳动法》中关于劳动安全卫生的有关规定未对用人单位提出严格要求的是( )。",[385,387,389,391],{"key":19,"text":386,"correct":21},"执行国家劳动卫生安全规程和标准",{"key":23,"text":388,"correct":28},"为劳动者办理意外伤害保险",{"key":26,"text":390,"correct":21},"对劳动者进行劳动安全卫生教育",{"key":30,"text":392,"correct":21},"对从事有职业危害作业的劳动者应当定期进行健康检查",{"id":394,"libraryId":5,"type":9,"typeLabel":15,"stem":395,"options":396,"answer":30,"analysis":32},1159332,"2013年1月,甲建筑材料公司聘请王某担任推销员,但2013年3月,由于王某怀孕,身体健康状况欠佳,未能完成任务,为此,公司按合同的约定扣减工资,只发生活费,其后,又有两个月均未能完成承包任务,因此,甲公司作出解除与王某的劳动合同。下列选项中表述正确的是( )。",[397,399,401,403],{"key":19,"text":398,"correct":21},"由于在试用期内,甲公司可以随时解除劳动合同",{"key":23,"text":400,"correct":21},"由于王某不能胜任工作,甲公司应提前30日通知王某,解除劳动合同",{"key":26,"text":402,"correct":21},"甲公司可以支付王某一个月工资后解除劳动合同",{"key":30,"text":404,"correct":28},"由于王某在怀孕期间,所以甲公司不能解除劳动合同",{"id":406,"libraryId":5,"type":9,"typeLabel":15,"stem":407,"options":408,"answer":26,"analysis":32},1159333,"王某应聘到某施工单位,双方于4月15日签订为期3年的劳动合同,其中约定试用期3个月,次日合同开始履行。7月18日,王某拟解除劳动合同,则( )。",[409,411,413,415],{"key":19,"text":410,"correct":21},"必须取得用人单位同意",{"key":23,"text":412,"correct":21},"口头通知用人单位即可",{"key":26,"text":414,"correct":28},"应提前30日以书面形式通知用人单位",{"key":30,"text":416,"correct":21},"应报请劳动行政主管部门同意后以书面形式通知用人单位",{"id":418,"libraryId":5,"type":9,"typeLabel":15,"stem":419,"options":420,"answer":30,"analysis":32},1159334,"不属于随时解除劳动合同的情形的是( )。",[421,423,425,427],{"key":19,"text":422,"correct":21},"某单位司机李某因交通肇事罪被判处有期徒刑3年",{"key":23,"text":424,"correct":21},"某单位发现王某在试用期间不符合录用条件",{"key":26,"text":426,"correct":21},"石某在工作期间严重失职,给单位造成重大损失",{"key":30,"text":428,"correct":28},"职工姚某无法胜任本岗位工作,经过培训仍然无法胜任工作的",{"id":430,"libraryId":5,"type":9,"typeLabel":15,"stem":431,"options":432,"answer":30,"analysis":32},1159335,"在下列情形中,用人单位可以解除劳动合同,但应当提前30天以书面形式通知劳动者本人的是( )。",[433,435,437,439],{"key":19,"text":434,"correct":21},"小王在试用期内迟到早退,不符合录用条件",{"key":23,"text":436,"correct":21},"小李因盗窃被判刑",{"key":26,"text":438,"correct":21},"小张在外出执行任务时负伤,失去左腿",{"key":30,"text":440,"correct":28},"小吴下班时间酗酒摔伤住院,出院后不能从事原工作也拒不从事单位另行安排的工作",{"id":442,"libraryId":5,"type":9,"typeLabel":15,"stem":443,"options":444,"answer":26,"analysis":32},1159336,"工人小韩与施工企业订立了1年期的劳动合同,在合同履行过程中小韩不能胜任本职工作,企业给其调整工作岗位后,仍不能胜任工作,其所在企业决定解除劳动合同,需提前( )日以书面形式通知小韩本人。",[445,447,449,451],{"key":19,"text":446,"correct":21},"10",{"key":23,"text":448,"correct":21},"15",{"key":26,"text":450,"correct":28},"30",{"key":30,"text":452,"correct":21},"60",{"id":454,"libraryId":5,"type":9,"typeLabel":15,"stem":455,"options":456,"answer":19,"analysis":32},1159337,"在试用期内被证明不符合录用条件的,用人单位( )。",[457,459,461,463],{"key":19,"text":458,"correct":28},"可以随时解除劳动合同",{"key":23,"text":460,"correct":21},"必须解除劳动合同",{"key":26,"text":462,"correct":21},"可以解除合同,但应当提前30日通知劳动者",{"key":30,"text":464,"correct":21},"不得解除劳动合同",{"id":466,"libraryId":5,"type":9,"typeLabel":15,"stem":467,"options":468,"answer":23,"analysis":32},1159338,"根据《劳动合同法》，下列选项中，用人单位可以解除劳动合同的情形是( )。",[469,471,473,475],{"key":19,"text":470,"correct":21},"职工患病,在规定的医疗期内",{"key":23,"text":472,"correct":28},"职工非因工负伤,伤愈出院不能从事原工作",{"key":26,"text":474,"correct":21},"女职工在孕期间",{"key":30,"text":476,"correct":21},"女职工在哺乳期内",{"id":478,"libraryId":5,"type":9,"typeLabel":15,"stem":479,"options":480,"answer":30,"analysis":32},1159339,"贾某与乙建筑公司签订了一份劳动合同,在合同尚未期满时,贾某拟解除劳动合同。根据规定,贾某应当提前( )日以书面形式通知用人单位。",[481,483,484,485],{"key":19,"text":482,"correct":21},"3",{"key":23,"text":448,"correct":21},{"key":26,"text":448,"correct":21},{"key":30,"text":450,"correct":28},{"id":487,"libraryId":5,"type":9,"typeLabel":15,"stem":488,"options":489,"answer":26,"analysis":32},1159340,"甲建筑材料公司聘请王某担任推销员,双方签订劳动合同,合同中约定如果王某完成承包标准,每月基本工资1000元,超额部分按40%提成,若不完成任务,可由公司扣减工资。下列选项中表述正确的是( )。",[490,492,494,496],{"key":19,"text":491,"correct":21},"甲建筑材料公司不得扣减王某工资",{"key":23,"text":493,"correct":21},"由于在试用期内,所以甲建筑材料公司的做法是符合《劳动合同法》的",{"key":26,"text":495,"correct":28},"甲公司可以扣发王某的工资,但是不得低于用人单位所在地的最低工资标准",{"key":30,"text":497,"correct":21},"试用期内的工资不得低于本单位相同岗位的最低档工资",{"id":499,"libraryId":5,"type":9,"typeLabel":15,"stem":500,"options":501,"answer":26,"analysis":32},1159341,"2005年2月1日小李经过面试合格后并与某建筑公司签订了为期5年的用工合同,并约定了试用期,则试用期最迟至( )。",[502,504,506,508],{"key":19,"text":503,"correct":21},"2005年2月28日",{"key":23,"text":505,"correct":21},"2005年5月31日",{"key":26,"text":507,"correct":28},"2005年8月1日",{"key":30,"text":509,"correct":21},"2006年2月1日",{"id":511,"libraryId":5,"type":9,"typeLabel":15,"stem":512,"options":513,"answer":23,"analysis":32},1159342,"采用欺诈、威胁等手段订立的劳动合同为( )劳动合同。",[514,516,518,520],{"key":19,"text":515,"correct":21},"有效",{"key":23,"text":517,"correct":28},"无效",{"key":26,"text":519,"correct":21},"可变更",{"key":30,"text":521,"correct":21},"可撤销",{"id":523,"libraryId":5,"type":9,"typeLabel":15,"stem":524,"options":525,"answer":23,"analysis":32},1159343,"根据有关法律法规有关工程返修的规定,下列说法正确的是( )。",[526,528,530,532],{"key":19,"text":527,"correct":21},"对施工过程中出现质量问题的建设工程,若非施工单位原因造成的,施工单位不负责返修",{"key":23,"text":529,"correct":28},"对施工过程中出现质量问题的建设工程,无论是否施工单位原因造成的,施工单位都应负责返修",{"key":26,"text":531,"correct":21},"对竣工验收不合格的建设工程,若非施工单位原因造成的,施工单位不负责返修",{"key":30,"text":533,"correct":21},"对竣工验收不合格的建设工程,若是施工单位原因造成的,施工单位负责有偿返修",{"id":535,"libraryId":5,"type":9,"typeLabel":15,"stem":536,"options":537,"answer":19,"analysis":32},1159344,"质量检测试样的取样应当严格执行有关工程建设标准和国家有关规定,在( )监督下现场取样。提供质量检测试样的单位和个人,应当对试样的真实性负责。",[538,540,542,544],{"key":19,"text":539,"correct":28},"建设单位或工程监理单位",{"key":23,"text":541,"correct":21},"建设单位或质量监督机构",{"key":26,"text":543,"correct":21},"施工单位或工程监理单位",{"key":30,"text":545,"correct":21},"质量监督机构或工程监理单位",{"id":547,"libraryId":5,"type":9,"typeLabel":15,"stem":548,"options":549,"answer":26,"analysis":32},1159345,"施工单位为施工现场从事危险作业的人员办理的意外伤害保险期限自建设工程开工之日起至( )为止。",[550,552,554,556],{"key":19,"text":551,"correct":21},"工程完工",{"key":23,"text":553,"correct":21},"交付使用",{"key":26,"text":555,"correct":28},"竣工验收合格",{"key":30,"text":557,"correct":21},"该人员工作完成",{"id":559,"libraryId":5,"type":9,"typeLabel":15,"stem":560,"options":561,"answer":23,"analysis":32},1159346,"( )负责现场警示标牌的保护工作。",[562,564,566,568],{"key":19,"text":563,"correct":21},"建设单位",{"key":23,"text":565,"correct":28},"施工单位",{"key":26,"text":567,"correct":21},"监理单位",{"key":30,"text":569,"correct":21},"项目经理",{"id":571,"libraryId":5,"type":9,"typeLabel":15,"stem":572,"options":573,"answer":19,"analysis":32},1159347,"对达到一定规模的危险性较大的分部分项工程编制专项施工方案,并附具安全验算结果,经( )签字后实施,由专职安全生产管理人员进行现场监督。",[574,576,578,580],{"key":19,"text":575,"correct":28},"施工单位技术负责人、总监理工程师",{"key":23,"text":577,"correct":21},"建设单位负责人、总监理工程师",{"key":26,"text":579,"correct":21},"施工单位技术负责人、监理工程师",{"key":30,"text":581,"correct":21},"建设单位负责人、监理工程师",{"id":583,"libraryId":5,"type":9,"typeLabel":15,"stem":584,"options":585,"answer":26,"analysis":32},1159348,"以下说法中,不属于施工单位主要负责人的安全生产方面的主要职责的是( )。",[586,588,590,592],{"key":19,"text":587,"correct":21},"对所承建的建设工程进行定期和专项安全检查,并做好安全检查记录",{"key":23,"text":589,"correct":21},"制定安全生产规章制度和操作规程",{"key":26,"text":591,"correct":28},"落实安全生产责任制度和操作规程",{"key":30,"text":593,"correct":21},"建立健全安全生产责任制度和安全生产教育培训制度",{"id":595,"libraryId":5,"type":9,"typeLabel":15,"stem":596,"options":597,"answer":23,"analysis":32},1159349,"以下关于安全事故调查的说法中,错误的是( )。",[598,600,602,604],{"key":19,"text":599,"correct":21},"重大事故由事故发生地省级人民政府负责调查",{"key":23,"text":601,"correct":28},"较大事故的事故发生地与事故发生单位不在同一个县级以上行政区域的,由事故发生单位所在地的人民政府负责调查,事故发生地人民政府应当派人参加",{"key":26,"text":603,"correct":21},"一般事故以下等级事故,可由县级人民政府直接组织事故调查,也可由上级人民政府组织事故调查",{"key":30,"text":605,"correct":21},"特别重大事故由国务院或者国务院授权有关部门组织事故调查组进行调查",{"id":607,"libraryId":5,"type":9,"typeLabel":15,"stem":608,"options":609,"answer":19,"analysis":32},1159350,"下列各项中,不属于安全生产监督检查人员义务的是( )。",[610,612,614,616],{"key":19,"text":611,"correct":28},"对检查中发现的安全生产违法行为,当场予以纠正或者要求限期改正",{"key":23,"text":613,"correct":21},"执行监督检查任务时,必须出示有效的监督执法证件",{"key":26,"text":615,"correct":21},"对涉及被检查单位的技术秘密和业务秘密,应当为其保密",{"key":30,"text":617,"correct":21},"应当忠于职守,坚持原则,秉公执法",[619,622,625,628,631,634],{"id":9,"name":620,"category":7,"favorite":621},"领导干部任职前廉政法规知识测试题",92,{"id":623,"name":624,"category":7,"favorite":9},595,"建筑结构与设备",{"id":626,"name":627,"category":7,"favorite":9},715,"招标采购专业知识与法律法规",{"id":629,"name":630,"category":7,"favorite":9},848,"市政方向-通用基础",{"id":632,"name":633,"category":7,"favorite":8},534,"BIM工程师",{"id":635,"name":633,"category":7,"favorite":8},535]