[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1159445":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1159445,820,1,"单选题","下列不属于工程项目质量协调性的内容是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","造型与美感",false,{"key":16,"text":17,"correct":18},"B","空间布置合理性",true,{"key":20,"text":21,"correct":14},"C","与生态环境的协调",{"key":23,"text":24,"correct":14},"D","与社区环境的协调","",{"id":6,"name":27,"category":28,"favorite":29},"通用基础","建筑工程",0]