[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1159048":3},{"question":4,"library":29},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":27,"analysis":28},1159048,819,2,"多选题","企业标准体系序列结构中将工程项目分为( )模块。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","操作规程",true,{"key":16,"text":17,"correct":14},"B","质量验收",{"key":19,"text":20,"correct":14},"C","安全防护",{"key":22,"text":23,"correct":14},"D","材料",{"key":25,"text":26,"correct":14},"E","试验检验","ABCDE","",{"id":6,"name":30,"category":31,"favorite":32},"岗位技能","建筑工程",0]