[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1159003":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1159003,819,1,"单选题","全面收集所承担工程项目施工过程中应执行的标准,并做好落实标准的相关措施与制度是标准员在( )中的职责。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","标准实施计划",true,{"key":16,"text":17,"correct":18},"B","施工前期标准实施",false,{"key":20,"text":21,"correct":18},"C","施工过程标准实施",{"key":23,"text":24,"correct":18},"D","标准信息管理","",{"id":6,"name":27,"category":28,"favorite":29},"岗位技能","建筑工程",0]