[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-818-4":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":590},{"id":5,"name":6,"category":7,"favorite":8},818,"(标准员)专业管理实务 岗位知识","建筑工程",0,4,50,1147,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,273,281,292,301,313,325,336,348,359,371,381,393,405,416,428,440,448,460,472,484,496,508,516,528,540,548,557,567,579],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1157901,1,"单选题","根据《施工现场临时用电安全技术规范》JGJ46-2005，每台开关箱直接控制（ ）用电设备（含插座）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","1台",true,{"key":24,"text":25,"correct":26},"B","2台",false,{"key":28,"text":29,"correct":26},"C","3台",{"key":31,"text":32,"correct":26},"D","4台","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1157902,"根据《建筑节能工程施工质量验收规范》GB50411-2007，建筑节能性能现场检验应由（ ）委托具有相应资质的检测机构对围护结构节能性能和系统功能进行检验。",[38,40,42,44],{"key":20,"text":39,"correct":26},"质量监督站",{"key":24,"text":41,"correct":22},"建设单位",{"key":28,"text":43,"correct":26},"设计单位",{"key":31,"text":45,"correct":26},"监理单位",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1157903,"根据《建筑施工塔式起重机安装、使用、拆卸安全技术规程》JGJ196-2010，当多台塔式起重机在同一施工现场交叉作业时，应编制专项方案，并应采取（ ）的安全措施。",[50,52,54,56],{"key":20,"text":51,"correct":26},"防倒塌",{"key":24,"text":53,"correct":22},"防碰撞",{"key":28,"text":55,"correct":26},"交叉施工",{"key":31,"text":57,"correct":26},"人员互用",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1157904,"根据《混凝土结构工程施工规范》GB50666-2011，混凝土中细骨料宜选用级配良好、质地坚硬、颗粒洁净的天然砂或机制砂，混凝土细骨料中氯离子含量对预应力钢筋混凝土，按干砂的质量百分率计算不得大于（ ）%。",[62,64,66,68],{"key":20,"text":63,"correct":26},"002",{"key":24,"text":65,"correct":22},"0.02",{"key":28,"text":67,"correct":26},"0.2",{"key":31,"text":69,"correct":26},"2",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1157905,"根据《建筑施工工具式脚手架安全技术规范》JGJ202-2010，附着式升降脚手架的附着支承结构的每个竖向主框架所覆盖的（ ）设置一道附墙支座。",[74,76,78,80],{"key":20,"text":75,"correct":26},"根据经验确定",{"key":24,"text":77,"correct":26},"根据计算确定",{"key":28,"text":79,"correct":26},"每隔一个楼层处",{"key":31,"text":81,"correct":22},"每一楼层处",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1157906,"根据《城镇道路工程施工与质量验收规范》CJJ1-2008，沥青混合料面层不得在雨、雪天气及环境最高温度低于（ ）时施工。",[86,88,90,92],{"key":20,"text":87,"correct":22},"5℃",{"key":24,"text":89,"correct":26},"0℃",{"key":28,"text":91,"correct":26},"-5℃",{"key":31,"text":93,"correct":26},"-3℃",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1157907,"根据《通风与空调工程施工质量验收规范》GB50243-2002，输送空气温度（ ）80℃的风管，应按设计规定采取防护措施。",[98,100,102,104],{"key":20,"text":99,"correct":26},"等于",{"key":24,"text":101,"correct":26},"可能低于",{"key":28,"text":103,"correct":26},"低于",{"key":31,"text":105,"correct":22},"高于",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":28,"analysis":33},1157908,"根据《电梯工程施工质量验收规范》GB50310-2002，电梯的所有电气设备及导、线槽的外露可导电部分均必须（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":26},"设漏电保护装置",{"key":24,"text":113,"correct":26},"可靠接零",{"key":28,"text":115,"correct":22},"可靠接地",{"key":31,"text":117,"correct":26},"设其他安全设施",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},1157909,"标准编号为GB50327-2001是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":26},"组合钢模板技术规范",{"key":24,"text":125,"correct":26},"土工合成材料应用技术规范",{"key":28,"text":127,"correct":26},"管井技术规范",{"key":31,"text":129,"correct":22},"住宅装饰装修施工规范",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},1157910,"根据《施工现场临时用电安全技术规范》JGJ46-2005，五芯电缆必须包含淡蓝、绿\u002F黄二种颜色绝缘芯线。淡蓝色芯线必须用作（ ）线；绿\u002F黄双色芯线必须用作PE线，严禁混用。",[134,136,138,140],{"key":20,"text":135,"correct":22},"N",{"key":24,"text":137,"correct":26},"相",{"key":28,"text":139,"correct":26},"P",{"key":31,"text":141,"correct":26},"任意",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1157911,"根据《施工现场临时用电安全技术规范》JGJ46-2005，施工临时用电的架空线必须采用（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":26},"裸线",{"key":24,"text":149,"correct":22},"绝缘导线",{"key":28,"text":151,"correct":26},"加强线",{"key":31,"text":153,"correct":26},"任意一种线",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},1157912,"根据《建筑施工扣件式钢管脚手架安全技术规范》JGJ130-2011，扣件式钢管脚手架安装与拆除人员必须是经考核合格的专业架子工，（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":26},"架子工领班应持证上岗，其他人员考核合格即可",{"key":24,"text":161,"correct":22},"所有架子工应持证上岗",{"key":28,"text":163,"correct":26},"所有架子工包括分管经理应持证上岗",{"key":31,"text":165,"correct":26},"一半架子工持证上岗",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},1157913,"根据《屋面工程质量验收规范》GB50207-2012，保温材料的导热系数、表观密度或干密度、抗压强度或压缩强度、（ ），必须符合设计要求。",[170,172,174,176],{"key":20,"text":171,"correct":22},"燃烧性能",{"key":24,"text":173,"correct":26},"厚度",{"key":28,"text":175,"correct":26},"尺寸",{"key":31,"text":177,"correct":26},"化学成分",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":28,"analysis":33},1157914,"标准编号为GB50203-2011是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":26},"给水排水构筑物工程施工及验收规范",{"key":24,"text":185,"correct":26},"建筑地基基础工程施工质量验收规范",{"key":28,"text":187,"correct":22},"砌体结构工程施工质量验收规范",{"key":31,"text":189,"correct":26},"混凝土结构工程施工质量验收规范（2011年版）",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},1157915,"《建筑施工扣件式钢管脚手架安全技术规范》全面、系统地提出了扣件式满堂脚手架、满堂支撑架的（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"安全度",{"key":24,"text":197,"correct":26},"系统",{"key":28,"text":199,"correct":26},"施工方法",{"key":31,"text":201,"correct":26},"施工技巧",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":28,"analysis":33},1157916,"根据《地下防水工程质量验收规范》GB50208-2011，中埋式止水带埋设位置应准确，其中间空心圆环与（ ）的中心线应重合。",[206,208,210,212],{"key":20,"text":207,"correct":26},"施工缝",{"key":24,"text":209,"correct":26},"沉降缝",{"key":28,"text":211,"correct":22},"变形缝",{"key":31,"text":213,"correct":26},"伸缩缝",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},1157917,"根据《砌体结构工程施工质量验收规范》GB50203-2011，砖砌体施工时，砌筑（ ）、混凝土多孔砖不需浇水湿润。",[218,220,222,224],{"key":20,"text":219,"correct":22},"混凝土实心砖",{"key":24,"text":221,"correct":26},"烧结多孔砖",{"key":28,"text":223,"correct":26},"蒸压粉煤灰砖",{"key":31,"text":225,"correct":26},"蒸压灰砂砖",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":24,"analysis":33},1157918,"根据《屋面工程质量验收规范》GB50207-2012，屋面防水工程完工后，应进行观感质量检查和雨后观察或淋水、（ ），不得有渗漏和积水现象。",[230,232,234,236],{"key":20,"text":231,"correct":26},"放水试验",{"key":24,"text":233,"correct":22},"蓄水试验",{"key":28,"text":235,"correct":26},"浇水试验",{"key":31,"text":237,"correct":26},"肉眼观察",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":20,"analysis":33},1157919,"根据《城镇道路工程施工与质量验收规范》CJJ1-2008，道路机械开挖作业时，必须避开构筑物、管线，在距管道边（ ）范围内应采用人工开挖；",[242,244,246,248],{"key":20,"text":243,"correct":22},"1m",{"key":24,"text":245,"correct":26},"1.5m",{"key":28,"text":247,"correct":26},"2m",{"key":31,"text":249,"correct":26},"0.5m",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":31,"analysis":33},1157920,"根据《建筑施工组织设计规范》GB\u002FT50502-2009，针对分部工程编制的施工方案应由（ ）审批。",[254,256,258,260],{"key":20,"text":255,"correct":26},"技术员",{"key":24,"text":257,"correct":26},"业主单位技术负责人",{"key":28,"text":259,"correct":26},"施工单位技术负责人",{"key":31,"text":261,"correct":22},"项目技术负责人",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":28,"analysis":33},1157921,"根据《建筑物防雷工程施工与质量验收规范》GB50601-2010，建筑物外的引下线敷设在人员可停留或经过的区域时，应设立阻止人员进人的护栏或警示牌。护栏与引下线水平距离不应小于（ ）。",[266,267,269,271],{"key":20,"text":245,"correct":26},{"key":24,"text":268,"correct":26},"2.7m",{"key":28,"text":270,"correct":22},"3.0m",{"key":31,"text":272,"correct":26},"4.5m",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":24,"analysis":33},1157922,"标准编号为GB50202-2002是（ ）。",[277,278,279,280],{"key":20,"text":183,"correct":26},{"key":24,"text":185,"correct":22},{"key":28,"text":187,"correct":26},{"key":31,"text":189,"correct":26},{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":24,"analysis":33},1157923,"根据《混凝土结构工程施工质量验收规范》GB50204-2015，对后张法预应力结构构件，钢绞线出现断裂或滑脱的数量不应（ ）同一截面钢绞线总根数的3％，且每根断裂的钢绞线断丝不得超过一丝。",[285,287,289,290],{"key":20,"text":286,"correct":26},"不应少于",{"key":24,"text":288,"correct":22},"不应超过",{"key":28,"text":99,"correct":26},{"key":31,"text":291,"correct":26},"可以等于",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":28,"analysis":33},1157924,"根据《建筑施工组织设计规范》GB\u002FT50502-2009，单位工程施工组织设计应由项目经理支持编制，（ ）审批。",[296,298,299,300],{"key":20,"text":297,"correct":26},"施工单位负责人",{"key":24,"text":257,"correct":26},{"key":28,"text":259,"correct":22},{"key":31,"text":261,"correct":26},{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":31,"analysis":33},1157925,"标准编号为GB50194-2014是（ ）。",[305,307,309,311],{"key":20,"text":306,"correct":26},"粉煤灰混凝土应用技术规范",{"key":24,"text":308,"correct":26},"汽车加油加气站设计与施工规范",{"key":28,"text":310,"correct":26},"蓄滞洪区建筑工程技术规范",{"key":31,"text":312,"correct":22},"建设工程施工现场供电安全规范",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":31,"analysis":33},1157926,"根据《城镇道路工程施工与质量验收规范》CJJ1-2008，土方路基施工，配合人员在机械走行范围内作业时，机械（ ）。",[317,319,321,323],{"key":20,"text":318,"correct":26},"应离开",{"key":24,"text":320,"correct":26},"与配合人员可以同时作业",{"key":28,"text":322,"correct":26},"必须停机",{"key":31,"text":324,"correct":22},"必须停止作业",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":31,"analysis":33},1157927,"根据《混凝土质量控制标准》GB50164-2011，当冬期施工时，混凝土拌合物人莫温度不应低于（ ）并应有保温措施。",[329,331,333,335],{"key":20,"text":330,"correct":26},"4℃",{"key":24,"text":332,"correct":26},"6℃",{"key":28,"text":334,"correct":26},"10℃",{"key":31,"text":87,"correct":22},{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":31,"analysis":33},1157928,"根据《建筑施工组织设计规范》GB\u002FT50502-2009，施工组织设计按编制对可分为施工组织总设计、单位工程施工组织设计和（ ）。",[340,342,344,346],{"key":20,"text":341,"correct":26},"特殊程施工组织设计",{"key":24,"text":343,"correct":26},"子单位工程施工组织设计",{"key":28,"text":345,"correct":26},"专项方案",{"key":31,"text":347,"correct":22},"施工方案",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":24,"analysis":33},1157929,"根据《混凝土质量控制标准》GB50164-2011，当混凝土自由倾落高度大于（ ）时，宜采用串筒、溜管或振动溜管等辅助设备。",[352,354,355,357],{"key":20,"text":353,"correct":26},"2.0m",{"key":24,"text":270,"correct":22},{"key":28,"text":356,"correct":26},"4.0m",{"key":31,"text":358,"correct":26},"6.0m",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":31,"analysis":33},1157930,"根据《混凝土强度检验评定标准》GB\u002FT50107-2010，混凝土试件的立方体抗压强度试验应根据现行国家标准规定执行。每组混凝土试件强度代表值的确定，当一组试件中强度的最大值或最小值与中间值之差超过中间值的15％时，取（ ）作为该组试件的强度代表值。",[363,365,367,369],{"key":20,"text":364,"correct":26},"最大值",{"key":24,"text":366,"correct":26},"最小值",{"key":28,"text":368,"correct":26},"算术平均值",{"key":31,"text":370,"correct":22},"中间值",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":28,"analysis":33},1157931,"根据《施工现场临时用电安全技术规范》JGJ46-2005，配电柜或配电线路停电维修时，应挂（ ），并应悬挂“禁止合闸、有人工作\\\"停电标志牌。停送电必须由专人负责。",[375,376,377,379],{"key":20,"text":147,"correct":26},{"key":24,"text":149,"correct":26},{"key":28,"text":378,"correct":22},"接地线",{"key":31,"text":380,"correct":26},"接零线",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":20,"analysis":33},1157932,"根据《建筑施工扣件式钢管脚手架安全技术规范》JGJ130-2011，扣件进人施工现场应检查产品合格证，并应进行抽样复试，技术性能应符合现行国家标准《钢管脚手架扣件》GB15831的规定。扣件在使用前应（ ），有裂缝、变形、螺栓出现滑丝的严禁使用。",[385,387,389,391],{"key":20,"text":386,"correct":22},"逐个挑选",{"key":24,"text":388,"correct":26},"进行抽检",{"key":28,"text":390,"correct":26},"50％抽检",{"key":31,"text":392,"correct":26},"30％抽检",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":28,"analysis":33},1157933,"根据《建筑工程施工质量验收统一标准》GB50300-2013，建筑工程检验批的质量应按（ ）和一般项目验收。",[397,399,401,403],{"key":20,"text":398,"correct":26},"保证项目",{"key":24,"text":400,"correct":26},"规定项目",{"key":28,"text":402,"correct":22},"主控项目",{"key":31,"text":404,"correct":26},"设计项目",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":24,"analysis":33},1157934,"根据《混凝土质量控制标准》GB50164-2011，水泥应按不同厂家、不同品种和虽度等级分批存储，并应采取防潮措施；出现结块的水泥不得用于混凝土工程；水泥出厂超过（ ）个月，应进行复检。",[409,410,412,414],{"key":20,"text":69,"correct":26},{"key":24,"text":411,"correct":22},"3",{"key":28,"text":413,"correct":26},"4",{"key":31,"text":415,"correct":26},"5",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":20,"analysis":33},1157935,"根据《城镇道路工程施工与质量验收规范》CJJ1-2008，施工中，后一分项工程施工（ ）。",[420,422,424,426],{"key":20,"text":421,"correct":22},"必须在前一分项工程验收合格后进行",{"key":24,"text":423,"correct":26},"与前一分项工程可以同时施工",{"key":28,"text":425,"correct":26},"可以与前一分项工程同时验收",{"key":31,"text":427,"correct":26},"可以与前一分项工程同时施工同时验收",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":31,"analysis":33},1157936,"根据《建筑基桩检测技术规范》JGJ106-2014，施工完成后的工程桩应进行单桩承载力和（ ）检测。",[432,434,436,438],{"key":20,"text":433,"correct":26},"桩身抗拔力",{"key":24,"text":435,"correct":26},"桩身标高",{"key":28,"text":437,"correct":26},"桩贯人度",{"key":31,"text":439,"correct":22},"桩身完整性",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":28,"analysis":33},1157937,"标准编号为GB50296-2014是（ ）。",[444,445,446,447],{"key":20,"text":123,"correct":26},{"key":24,"text":125,"correct":26},{"key":28,"text":127,"correct":22},{"key":31,"text":129,"correct":26},{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":31,"analysis":33},1157938,"根据《建筑施工塔式起重机安装、使用、拆卸安全技术规程》JGJ196-2010，塔式起重机安装、拆卸作业应配备下列人员：持有安全生产考核合格证书的项目负责人和安全负责人、机械管理人员、安装拆卸工、（ ）、起重信号工、司索工等特种作业操作",[452,454,456,458],{"key":20,"text":453,"correct":26},"混凝土工",{"key":24,"text":455,"correct":26},"瓦工",{"key":28,"text":457,"correct":26},"模板工",{"key":31,"text":459,"correct":22},"起重司机",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":28,"analysis":33},1157939,"根据《建筑机械使用安全技术规程》JGJ33-2012，混凝土搅拌机料斗提升时，严禁作业人员在料斗下停留或通过；当需要在料斗下方进行清理或检修时，应将料斗（ ）并用保险销锁牢。",[464,466,468,470],{"key":20,"text":465,"correct":26},"固定",{"key":24,"text":467,"correct":26},"拆下",{"key":28,"text":469,"correct":22},"提升至上止点",{"key":31,"text":471,"correct":26},"提升至下止点",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":31,"analysis":33},1157940,"根据《建筑施工塔式起重机安装、使用、拆卸安全技术规程》JGJ196-2010，国家明令淘汰、不符合国家现行相关标准、超过规定使用年限经评估不合格、（ ）塔式起重机严禁使用。",[476,478,480,482],{"key":20,"text":477,"correct":26},"已经服务5年以上",{"key":24,"text":479,"correct":26},"已经服务10年以上",{"key":28,"text":481,"correct":26},"已经服务15年以上",{"key":31,"text":483,"correct":22},"没有完整安全技术档案",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":31,"analysis":33},1157941,"根据《城镇道路工程施工与质量验收规范》CJJ1-2008，土方路基，当人机配合土方作业时，（ ）指挥。",[488,490,492,494],{"key":20,"text":489,"correct":26},"可以不设专人",{"key":24,"text":491,"correct":26},"可以让司机",{"key":28,"text":493,"correct":26},"可以让配合人员",{"key":31,"text":495,"correct":22},"必须设专人",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":31,"analysis":33},1157942,"根据《混凝土结构工程施工质量验收规范》GB50204-2015，预应力钢筋进场时，应按国家现行标准抽取试件作抗拉强度、（ ）检验。",[500,502,504,506],{"key":20,"text":501,"correct":26},"直径偏差",{"key":24,"text":503,"correct":26},"弯曲性能",{"key":28,"text":505,"correct":26},"重量偏差",{"key":31,"text":507,"correct":22},"伸长率",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":31,"analysis":33},1157944,"标准编号为GB50204-2002是（ ）。",[512,513,514,515],{"key":20,"text":183,"correct":26},{"key":24,"text":185,"correct":26},{"key":28,"text":187,"correct":26},{"key":31,"text":189,"correct":22},{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":24,"analysis":33},1157945,"根据《建筑施工工具式脚手架安全技术规范》JGJ202-2010，附着式升降脚手架的5.附墙支座支承在建筑物上连接处混凝土的强度应按设计要求确定，但不得小于（ ）。",[520,522,524,526],{"key":20,"text":521,"correct":26},"C15",{"key":24,"text":523,"correct":22},"C10",{"key":28,"text":525,"correct":26},"C20",{"key":31,"text":527,"correct":26},"C25",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":24,"analysis":33},1157946,"标准编号为GB50086-2001是（ ）。",[532,534,536,538],{"key":20,"text":533,"correct":26},"冷弯薄壁型钢结构技术规范",{"key":24,"text":535,"correct":22},"锚杆喷射混凝土支护技术规范",{"key":28,"text":537,"correct":26},"地下工程防水技术规范",{"key":31,"text":539,"correct":26},"膨胀土地区建筑技术规范",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":28,"analysis":33},1157947,"标准编号为GB50181-93是（ ）。",[544,545,546,547],{"key":20,"text":306,"correct":26},{"key":24,"text":308,"correct":26},{"key":28,"text":310,"correct":22},{"key":31,"text":312,"correct":26},{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":20,"analysis":33},1157948,"根据《建筑基桩检测技术规范》JGJ106-2014，采用高应变法进行承载力检测时，锤的重量与单桩竖向抗压承载力特征值的不得小于（ ）。",[552,553,554,556],{"key":20,"text":65,"correct":22},{"key":24,"text":67,"correct":26},{"key":28,"text":555,"correct":26},"1.2",{"key":31,"text":69,"correct":26},{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":28,"analysis":33},1157949,"根据《混凝土强度检验评定标准》GB\u002FT50107-2010，混凝土试件的立方体抗压强度试验应根据现行国家标准规定执行。每组混凝土试件强度代表值的确定，一般情况下取3个试件强度的（ ）作为每组试件的强度代表值。",[561,563,565,566],{"key":20,"text":562,"correct":26},"几何平均值",{"key":24,"text":564,"correct":26},"加权平均值",{"key":28,"text":368,"correct":22},{"key":31,"text":370,"correct":26},{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":28,"analysis":33},1157950,"根据《建筑基桩检测技术规范》JGJ106-2014，为设计提供依据的单桩竖向抗压铮载试验应采用（ ）维持荷载法。",[571,573,575,577],{"key":20,"text":572,"correct":26},"间断",{"key":24,"text":574,"correct":26},"连续",{"key":28,"text":576,"correct":22},"慢速",{"key":31,"text":578,"correct":26},"快速",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":24,"analysis":33},1157951,"根据《建筑工程施工质量验收统一标准》GB50300-2013，分部工程应由（ ）组织施工单位项目负责人和项目技术负责人等进行验收。",[583,585,587,589],{"key":20,"text":584,"correct":26},"项目经理",{"key":24,"text":586,"correct":22},"总监理工程师",{"key":28,"text":588,"correct":26},"专业监理工程师",{"key":31,"text":261,"correct":26},[591,594,597,600,603,606],{"id":15,"name":592,"category":7,"favorite":593},"领导干部任职前廉政法规知识测试题",92,{"id":595,"name":596,"category":7,"favorite":15},595,"建筑结构与设备",{"id":598,"name":599,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":601,"name":602,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":604,"name":605,"category":7,"favorite":8},534,"BIM工程师",{"id":607,"name":605,"category":7,"favorite":8},535]