[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-818-18":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":322},{"id":5,"name":6,"category":7,"favorite":8},818,"(标准员)专业管理实务 岗位知识","建筑工程",0,18,50,1147,[13,28,34,40,46,52,58,64,70,76,82,88,94,100,106,112,118,124,130,136,142,148,154,160,166,172,178,184,190,196,202,208,214,220,226,232,238,244,250,256,262,268,274,280,286,292,298,304,310,316],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":25,"analysis":27},1158606,3,"判断题","根据《混凝土质量控制标准》GB50164-2011，对于竖向混凝土结构养护时间，与水平结构混凝土养护时间应相同。",[19,23],{"key":20,"text":21,"correct":22},"A","正确",false,{"key":24,"text":25,"correct":26},"B","错误",true,"",{"id":29,"libraryId":5,"type":15,"typeLabel":16,"stem":30,"options":31,"answer":25,"analysis":27},1158607,"根据《砌体结构工程施工质量验收规范》，毛石砌筑时，对石块间存在较大的缝隙，应先填小石块后填灌砂浆。",[32,33],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":25,"analysis":27},1158608,"施工工艺规范是对建筑工程和市政工程的施工条件、程序、方法、工艺、质量、机械操作等的技术指标，以图表形式作出规定的工程建设标准。",[38,39],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":41,"libraryId":5,"type":15,"typeLabel":16,"stem":42,"options":43,"answer":25,"analysis":27},1158609,"根据《建筑装饰装修工程质量验收规范》GB50210-2001，隐框幕墙、半隐框幕墙所采用的结构粘结材料必须是酸性硅酮结构密封胶，硅酮结构密封胶必须在有效期内使用。",[44,45],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":21,"analysis":27},1158610,"根据《建筑施工安全检查标准》JGJ59-2011，施工负责人在分派生产任务时，应对参加施工人员进行书面安全技术交底。",[50,51],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":21,"analysis":27},1158611,"建筑施工安全，既包括建筑物本身的性能安全，又包括建造构成中施工作业人员的安全。",[56,57],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":21,"analysis":27},1158612,"根据《大体积混凝土施工规范》GB50496-2009，后浇带或跳仓方留置的竖向施工缝，宜用钢板网、铁丝网或小木板拼接支模，也可用快易收口网进行支挡；后浇带的垂直支架系统宜与其他部位分开倍。",[62,63],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":21,"analysis":27},1158613,"根据《混凝土结构工程施工规范》GB50666-2011，混凝土结构工程施工时，对模板及支架，应进行设计。模板及支架应具有足够的承载力、刚度、稳定性，应能可靠地承受施工过程中所产生的各类荷载。",[68,69],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":25,"analysis":27},1158614,"根据《施工现场临时用电安全技术规范》JGJ46-2005规定，临时用电组织设计及变更时，必须履行“编制、审核\\\"程序，由电气工程技术人员组织编制。变更用电组织设计时应补充有关图纸资料。",[74,75],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":25,"analysis":27},1158615,"《混凝土强度检验评定标准》主要内容包括C80及以上高强混凝土非标准尺寸试件确定折算系数的方法。",[80,81],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":25,"analysis":27},1158616,"根据《混凝土质量控制标准》GB50164-2011，混凝土拌合物的稠度可采用含水軹坍落度、维勃稠度或扩展度表示。",[86,87],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":25,"analysis":27},1158617,"根据《建筑节能工程施工质量验收规范》GB50411-2007，建筑节能分部工程的专项验收应该作为单位工程竣工验收的补充条件。",[92,93],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":21,"analysis":27},1158618,"砌体结构工程施工质量验收规范》GB50203-2011，假缝是指为掩盖砌体灰缝内在质量缺陷，砌筑砌体时仅在靠近砌体表面处抹有砂浆，而内部无砂浆的竖向灰缝。",[98,99],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":21,"analysis":27},1158619,"根据《混凝土质量控制标准》GB50164-2011，混凝土拌合物在浇筑成型过程中，严禁加水。",[104,105],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":25,"analysis":27},1158620,"根据《建筑施工安全检查标准》JGJ59-2011，施工现场外电线路与在建工程的安全距离不符合规范要求时，必须采取搭设钢管脚手架进行防护隔离。",[110,111],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":25,"analysis":27},1158621,"建筑施工安全检查标准》JGJ59-2011，宿舍内住宿人员人均面积不应小于2.5㎡，且不得超过20人。",[116,117],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":25,"analysis":27},1158622,"根据《建筑施工安全检查标准》JGJ59-2011，施工现场可用施工道路代替消防通道，但必须设置专用消防水源，并应符合规范要求。",[122,123],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":25,"analysis":27},1158623,"《混凝土强度检验评定标准》主要内容包括评定方法中标准差未知方案中的标准差计算公式。",[128,129],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":25,"analysis":27},1158624,"根据《砌体结构工程施工质量验收规范》GB50203-2011，砖砌体施工时，砌筑混凝土多孔砖、混凝土实心砖时，砖应提前1~2天浇水湿润。",[134,135],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":21,"analysis":27},1158625,"《建筑制图标准》，本标准规定建筑及室内设计专业制图标准化，包括建筑和装修图线、图例、图样画法等。",[140,141],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":25,"analysis":27},1158626,"根据《混凝土质量控制标准》GB50164-2011，当冬期施工时，混凝土拌合物入模温度不应低于10℃，并应有保温措施。",[146,147],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":21,"analysis":27},1158627,"根据《通风与空调工程施工质量验收规范》GB50243-2002，输送含有易燃、易爆环境的风管系统应有良好的接地，通过生活区或其他辅助生产房间时必须严密，并不得设置接口。",[152,153],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":21,"analysis":27},1158628,"《混凝土强度检验评定标准》主要内容包括试样取样频率的规定。",[158,159],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":21,"analysis":27},1158629,"根据《建筑施工工具式脚手架安全技术规范》JGJ202-2010，严禁将高处作业吊篮悬挂机构前支架架设在女儿墙上、女儿墙外或建筑物挑檐边缘。",[164,165],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":25,"analysis":27},1158630,"根据《混凝土质量控制标准》GB50164-2011，混凝土施工养护时间，对于采用眭酸盐水泥、普通硅酸盐水泥或矿渣硅酸盐水泥配制的混凝土，采用浇水和潮湿覆盖的养沪时间不得少于14d。",[170,171],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":21,"analysis":27},1158631,"根据《建筑施工工具式脚手架安全技术规范》JGJ202-2010，物料平台不得与附着式升降脚手架各部位和各结构构件相连，其荷载应独立的直接传递给建筑工程结构。",[176,177],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":21,"analysis":27},1158632,"根据《建筑基桩检测技术规范》JGJ106-2014，进行桩基础设计时，必须确定单匪承载能力，为设计提供依据的单桩竖向抗压静载试验应采用慢速维持荷载法。",[182,183],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":25,"analysis":27},1158633,"根据《建筑施工安全检查标准》JGJ59-2011，工程项目分包单位不应配备专职安全员，因为总包单位已经按相关规定配备了专职安全员。",[188,189],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":21,"analysis":27},1158634,"根据《混凝土质量控制标准》GB50164-2011，对于采用粉煤灰硅酸盐水泥、火山灰质硅酸盐水泥、复合硅酸盐水泥配制的混凝土，或掺加缓凝剂的混凝土以及大掺量矿勿掺合料混凝土，采用浇水和潮湿覆盖的养护时间不得少于14d。",[194,195],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":25,"analysis":27},1158635,"根据《建筑施工塔式起重机安装、使用、拆卸安全技术规程》JGJ196-2010，塔式起重机的连接件及其防松防脱件可以用其他代用品代用。",[200,201],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":21,"analysis":27},1158636,"根据《建筑装饰装修工程质量验收规范》GB50210-2001，主体结构与幕墙连接的各种预埋件，其数量、规格、位置和防腐处理必须符合设计要求。",[206,207],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":21,"analysis":27},1158637,"根据《施工现场临时用电安全技术规范》JGJ46-2005规定，各类用电人员对暂时停用设备的开关箱，必须分断电源隔离开关，并应关门上锁。",[212,213],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":21,"analysis":27},1158638,"施工技术规范的构成复杂，它既可以是一项专门的技术标准，也可以是施工过程中某专项的标准。",[218,219],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":25,"analysis":27},1158639,"根据《建筑装饰装修工程质量验收规范》GB50210-2001，建筑装饰装修工程施工中，严禁违反设计文件擅自改动建筑主体、承重结构或主要使用功能；可以未经设计确认和有关部门批准擅自拆改水、暖、电、燃气、通讯等配套设施。",[224,225],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":21,"analysis":27},1158640,"混凝土结构工程施工规范》GB50666-2011，当需要进行钢筋代换时，必须由设计部门变更，施工单位不能自行变更。",[230,231],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":21,"analysis":27},1158641,"根据《施工现场临时用电安全技术规范》JGJ46-2005，施工现场与外电线路共用同一供电系统时，电气设备的接地、接零保护应与原系统保持一致。不得-部分设备做保护接零，另-部分设备做保护接地。",[236,237],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":25,"analysis":27},1158642,"混凝土浇筑并达到规定强度后，通过张拉预应力筋并在结构上锚固而建立预加应力的混凝土结构，称为先张法预应力混凝土构件。",[242,243],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":25,"analysis":27},1158643,"根据《建筑装饰装修工程质量验收规范》GB50210-2001，建筑装饰装修工程所用的主要材料应符合国家有关建筑装饰装修材料有害物质限量标准的规定。",[248,249],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":21,"analysis":27},1158644,"根据《屋面工程技术规范》GB50345-2012，屋面工程施工时，屋面工程施工时，屋面周边和预留孔洞部位，必须按临边、洞口防护规定设置安全护栏和安全网。",[254,255],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":21,"analysis":27},1158645,"根据《建筑机械使用安全技术规程》JGJ33-2012，建筑机械在清洁保养维修动力与电气装置前，必须先切断动力，等停稳后方可进行。",[260,261],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":25,"analysis":27},1158646,"根据《砌体结构工程施工质量验收规范》GB50203-2011，砖砌体施工时，砖砌体的转角处和交接处应同时砌筑，严禁无可靠措施的内外墙分砌施工。在抗震设防烈度为8度及8度以上地区，对不能同时砌筑而又必须留置的临时间断处可以留成直槎，但必须加拉接筋。",[266,267],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":25,"analysis":27},1158647,"根据《混凝土质量控制标准》GB50164-2011，混凝土原材料进场时，供方应按定批次向需方提供质量证明文件。质量证明文件应包括型式检验报告、出厂检验报告与检报告等，外加剂产品还应提供使用说明书。",[272,273],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":25,"analysis":27},1158648,"根据《建筑装饰装修工程质量验收规范》GB50210-2001，半隐框幕墙所采用的结构粘结材料必须碱性硅酮结构密封胶，其性能必须符合《建筑用硅酮结构密封胶》GB16776的规定；硅酮结构密封胶必须在有效期内使用。",[278,279],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":25,"analysis":27},1158649,"根据《建筑施工安全检查标准》JGJ59-2011，起重机作业应设专职信号指挥和司索人员，但信号指挥可以同时兼顾司索作业。",[284,285],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":25,"analysis":27},1158650,"《房屋建筑制图统一标准》，规定房屋建筑制图的基本和统一标准，包括图线、字体、字号、比例、符号、定位轴线、材料图例、画法等。",[290,291],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":25,"analysis":27},1158651,"根据《施工现场临时用电安全技术规范》JGJ46-2005，在建工程的周边与架空线路的边线之间应留出最小安全操作距离，此最小安全操作距离是指在建工程（不含脚手架）的周边与架空线路的边线之间的距离。",[296,297],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":25,"analysis":27},1158652,"钢筋混凝土结构中，柱及其它受压构件中的周边箍筋应做成敞开式。",[302,303],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":25,"analysis":27},1158653,"根据《大体积混凝土施工规范》GB50496-2009，超长大体积混凝土施工，应选用留置变形缝、后浇带施工、留置施工缝等方法控制结构不出现有害裂缝。",[308,309],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":21,"analysis":27},1158654,"根据《建筑节能工程施工质量验收规范》GB50411-2007，热桥是指围护结构两侧在温差作用下，形成热流密集的传热部位。",[314,315],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":21,"analysis":27},1158655,"根据《通风与空调工程施工质量验收规范》GB50243-2002，防爆风阀的制作材料必须符合设计规定，征得设计同意可以更换。",[320,321],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},[323,327,330,333,336,339],{"id":324,"name":325,"category":7,"favorite":326},1,"领导干部任职前廉政法规知识测试题",92,{"id":328,"name":329,"category":7,"favorite":324},595,"建筑结构与设备",{"id":331,"name":332,"category":7,"favorite":324},715,"招标采购专业知识与法律法规",{"id":334,"name":335,"category":7,"favorite":324},848,"市政方向-通用基础",{"id":337,"name":338,"category":7,"favorite":8},534,"BIM工程师",{"id":340,"name":338,"category":7,"favorite":8},535]