[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1158673":3},{"question":4,"library":19},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":9},1158673,818,3,"判断题","根据《建筑施工组织设计规范》GB\u002FT50502-2009，施工组织总设计应对项目进度目标、质量目标、安全目标、环境目标和成本目标等总体施工目标做出宏观部署。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,{"id":6,"name":20,"category":21,"favorite":22},"(标准员)专业管理实务 岗位知识","建筑工程",0]