[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1158658":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1158658,818,3,"判断题","模板拆除时，可采取先支的先拆、后支的后拆，先拆非承重模板，后拆承重模板的顺序，并应从上而下进行拆除。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"模板拆除时，可采取先支的后拆、后支的先拆，先拆非承重模板，后拆承重模板的顺序，并应从上而下进行拆除。",{"id":6,"name":21,"category":22,"favorite":23},"(标准员)专业管理实务 岗位知识","建筑工程",0]