[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1158569":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1158569,818,3,"判断题","标准实施交底工作一般不宜与施工组织设计交底相结合，标准作为一项制度落实明确各岗位工作中执行标准的要求，而施工组织设计明确落实施工方案对操作工艺的要求。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"标准实施交底工作可与施工组织设计交底相结合，结合施工方案落实明确各岗位工作中执行标准的要求。",{"id":6,"name":21,"category":22,"favorite":23},"(标准员)专业管理实务 岗位知识","建筑工程",0]