[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1158520":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1158520,818,3,"判断题","在工程项目标准体系结构图中，多数模块还可以再进一步分解。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"结构图中，每一个模块还可以再进一步分解，如何细分要根据项目的规模、项目管理岗位人员设置的情况，以方便使用，更好地服务于工程建设为出发点。",{"id":6,"name":21,"category":22,"favorite":23},"(标准员)专业管理实务 岗位知识","建筑工程",0]