[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1158259":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1158259,818,2,"多选题","在工程项目标准体系结构图中，每一个模块如何细分需要根据（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","企业规章制度",false,{"key":16,"text":17,"correct":18},"B","项目的规模",true,{"key":20,"text":21,"correct":18},"C","项目管理岗位人员设置的情况",{"key":23,"text":24,"correct":14},"D","企业经营策略",{"key":26,"text":27,"correct":18},"E","更好地服务于工程建设","BCE","结构图中，每一个模块还可以再进一步分解，如何细分要根据项目的规模、项目管理岗位人员设置的情况，以方便使用，更好地服务于工程建设为出发点。",{"id":6,"name":31,"category":32,"favorite":33},"(标准员)专业管理实务 岗位知识","建筑工程",0]