[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1158158":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1158158,818,1,"单选题","落地式钢管脚手架工程搭设高度超过（ ）m时，应当编制专项施工方案。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","20",false,{"key":16,"text":17,"correct":18},"B","24",true,{"key":20,"text":21,"correct":14},"C","30",{"key":23,"text":24,"correct":14},"D","50","落地式钢管脚手架工程搭设高度超过24m时，应当编制专项施工方案。",{"id":6,"name":27,"category":28,"favorite":29},"(标准员)专业管理实务 岗位知识","建筑工程",0]