[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1158032":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1158032,818,1,"单选题","《生产安全事故报告和调查处理条例》规定，事故报告后出现新情况的，应当及时补报。施工项目“及时”的时间是指自事故发生之日起（ ）天内。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","7",false,{"key":16,"text":17,"correct":14},"B","15",{"key":19,"text":20,"correct":14},"C","28",{"key":22,"text":23,"correct":24},"D","30",true,"《生产安全事故报告和调查处理条例》规定，事故报告后出现新情况的，应当及时补报。施工项目“及时”的时间是指自事故发生之日起30天内。",{"id":6,"name":27,"category":28,"favorite":29},"(标准员)专业管理实务 岗位知识","建筑工程",0]