[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1158027":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1158027,818,1,"单选题","质量控制活动主要任务是使影响质量的（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","多数因素处于受控状态",false,{"key":16,"text":17,"correct":14},"B","少数因素处于受控状态",{"key":19,"text":20,"correct":21},"C","各种因素处于受控状态",true,{"key":23,"text":24,"correct":14},"D","少数因素处于不可控状态","质量控制活动主要任务是使影响质量的各种因素处于受控状态。",{"id":6,"name":27,"category":28,"favorite":29},"(标准员)专业管理实务 岗位知识","建筑工程",0]