[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1157965":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1157965,818,1,"单选题","根据《大体积混凝土施工规范》GB50496-2009，超长大体积混凝土采用跳仓法施工施工时，跳仓的最大分块尺寸不宜大于（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","45m",false,{"key":16,"text":17,"correct":14},"B","35m",{"key":19,"text":20,"correct":14},"C","30m",{"key":22,"text":23,"correct":24},"D","40m",true,"根据《大体积混凝土施工规范》GB50496-2009，超长大体积混凝土采用跳仓法施工施工时，跳仓的最大分块尺寸不宜大于40m。",{"id":6,"name":27,"category":28,"favorite":29},"(标准员)专业管理实务 岗位知识","建筑工程",0]