[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1157920":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1157920,818,1,"单选题","根据《建筑施工组织设计规范》GB\u002FT50502-2009，针对分部工程编制的施工方案应由（ ）审批。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","技术员",false,{"key":16,"text":17,"correct":14},"B","业主单位技术负责人",{"key":19,"text":20,"correct":14},"C","施工单位技术负责人",{"key":22,"text":23,"correct":24},"D","项目技术负责人",true,"根据《建筑施工组织设计规范》GB\u002FT50502-2009，针对分部工程编制的施工方案应由项目技术负责人审批。",{"id":6,"name":27,"category":28,"favorite":29},"(标准员)专业管理实务 岗位知识","建筑工程",0]