[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1157895":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1157895,818,1,"单选题","根据《建筑施工工具式脚手架安全技术规范》JGJ202-2010，附着式升降脚手架架体全高与支承跨度的乘积不应大于（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","80㎡",false,{"key":16,"text":17,"correct":14},"B","90㎡",{"key":19,"text":20,"correct":14},"C","100㎡",{"key":22,"text":23,"correct":24},"D","110㎡",true,"根据《建筑施工工具式脚手架安全技术规范》JGJ202-2010，附着式升降脚手架架体全高与支承跨度的乘积不应大于110m^2。",{"id":6,"name":27,"category":28,"favorite":29},"(标准员)专业管理实务 岗位知识","建筑工程",0]