[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1157827":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1157827,818,1,"单选题","在项目验收阶段，对于涉及质量验收和检验、鉴定、评价的工程建设标准或内容不进行（ ）评价。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","经济效果",true,{"key":16,"text":17,"correct":18},"B","社会效果",false,{"key":20,"text":21,"correct":18},"C","执行标准状况",{"key":23,"text":24,"correct":18},"D","标准先进性","对于涉及质量验收和检验、鉴定、评价的工程建设标准或内容不评价经济效果，主要考虑到这两类标准实施过程中不能产生经济效果或产生的经济效果较小。",{"id":6,"name":27,"category":28,"favorite":29},"(标准员)专业管理实务 岗位知识","建筑工程",0]