[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-817-7":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":571},{"id":5,"name":6,"category":7,"favorite":8},817,"(标准员)基础知识","建筑工程",0,7,50,1283,[13,34,46,58,70,82,94,106,114,124,136,148,160,172,184,196,208,220,232,241,253,265,277,289,301,313,325,337,347,357,369,381,393,401,413,421,433,441,453,461,469,481,489,500,508,516,526,538,547,559],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1156760,1,"单选题","运用动态控制原理控制施工质量时，质量目标不仅包括各分部分项工程的施工质量，还包括（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","设计图纸的质量",false,{"key":24,"text":25,"correct":26},"B","采购的建筑材料的质量",true,{"key":28,"text":29,"correct":22},"C","签订施工合同时决策质量",{"key":31,"text":32,"correct":22},"D","编制监理规划的质量","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1156761,"编制工程项目施工组织设计时，一般将施工段的划分、施工顺序的安排列入施工组织设计的（ ）部分。",[38,40,42,44],{"key":20,"text":39,"correct":22},"施工进度计划",{"key":24,"text":41,"correct":22},"施工总平面图",{"key":28,"text":43,"correct":26},"施工部署和施工方案",{"key":31,"text":45,"correct":22},"工程概况",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1156762,"项目施工过程中，为对项目目标进行动态跟踪和控制，在确定目标控制的计划值之后，首先要做的工作是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"调整项目目标",{"key":24,"text":53,"correct":22},"比较项目目标的实际值与计划值",{"key":28,"text":55,"correct":26},"收集项目目标的实际值",{"key":31,"text":57,"correct":22},"采取纠偏措施进行纠错",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1156763,"企业传统的组织管理模式一般选（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"线性组织结构",{"key":24,"text":65,"correct":22},"混合组织结构",{"key":28,"text":67,"correct":22},"矩阵组织结构",{"key":31,"text":69,"correct":26},"职能组织结构",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},1156764,"下列选项中，不属于施工组织总设计按编制对象划分的是（ ）",[74,76,78,80],{"key":20,"text":75,"correct":22},"施工组织总设计",{"key":24,"text":77,"correct":22},"单位工程施工组织设计",{"key":28,"text":79,"correct":26},"单项工程施工组织设计",{"key":31,"text":81,"correct":22},"施工方案",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1156765,"施工项目目标控制包括：施工项目进度控制、施工项目质量控制、（ ）、施工项目安全控制四个方面。",[86,88,90,92],{"key":20,"text":87,"correct":22},"施工项目管理控制",{"key":24,"text":89,"correct":26},"施工项目成本控制",{"key":28,"text":91,"correct":22},"施工项目人力控制",{"key":31,"text":93,"correct":22},"施工项目物资控制",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1156766,"项目经理部解体一般是在（ ）阶段。",[98,100,102,104],{"key":20,"text":99,"correct":22},"投标及签订合同",{"key":24,"text":101,"correct":22},"施工准备",{"key":28,"text":103,"correct":22},"施工阶段",{"key":31,"text":105,"correct":26},"竣工验收",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1156767,"某建设工程项目的规模不大，参与单位不多，为提高管理效率，避免出现矛盾指令，宜采用（ ）模式。",[110,111,112,113],{"key":20,"text":63,"correct":26},{"key":24,"text":65,"correct":22},{"key":28,"text":67,"correct":22},{"key":31,"text":69,"correct":22},{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":28,"analysis":33},1156768,"某公司承接了某工厂新建厂区的建设任务，公司针对该厂区建设所编制的施工组织设计应属于（ ）。",[118,120,121,122],{"key":20,"text":119,"correct":22},"施工规划",{"key":24,"text":77,"correct":22},{"key":28,"text":75,"correct":26},{"key":31,"text":123,"correct":22},"分部分项工程施工组织设计",{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":24,"analysis":33},1156769,"施工现场混凝土坍落度检测属于现场质量检查方法中的（ ）。",[128,130,132,134],{"key":20,"text":129,"correct":22},"目测法",{"key":24,"text":131,"correct":26},"实测法",{"key":28,"text":133,"correct":22},"现货试验法",{"key":31,"text":135,"correct":22},"无损检测法",{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":24,"analysis":33},1156770,"同一施工过程在不同施工段上的流水节拍相等，但是不同施工过程在同一施工段上的流水节拍不全相等，而成倍数关系，叫做（ ）。",[140,142,144,146],{"key":20,"text":141,"correct":22},"等节拍流水",{"key":24,"text":143,"correct":26},"成倍节拍专业流水",{"key":28,"text":145,"correct":22},"加快成倍节拍专业流水",{"key":31,"text":147,"correct":22},"无节奏专业流水",{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":28,"analysis":33},1156771,"某工程双代号网络计划如图所示（时间单位：d），则该计划的关键线路是（ ）。",[152,154,156,158],{"key":20,"text":153,"correct":22},"①②③④⑤⑥",{"key":24,"text":155,"correct":22},"①②③④⑥",{"key":28,"text":157,"correct":26},"①③④⑥",{"key":31,"text":159,"correct":22},"①③⑤⑥",{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":20,"analysis":33},1156772,"在施工成本动态控制过程中，当对工程合同价与实际施工成本、工程款支付进行比较时，成本的计划值是（ ）。",[164,166,168,170],{"key":20,"text":165,"correct":26},"工程合同价",{"key":24,"text":167,"correct":22},"实际施工成本",{"key":28,"text":169,"correct":22},"工程款支付额",{"key":31,"text":171,"correct":22},"施工图预算",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":24,"analysis":33},1156773,"某建设项目管理公司的组织系统采用了矩阵组织结构模式，其纵向管理部门有合同管理部、计划管理部、技术管理部、财务部和入事管理部等，其横向的工作部门在以下选项中通常是（ ）。",[176,178,180,182],{"key":20,"text":177,"correct":22},"质量管理部",{"key":24,"text":179,"correct":26},"项目部",{"key":28,"text":181,"correct":22},"经理办公室",{"key":31,"text":183,"correct":22},"物资供应部",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":31,"analysis":33},1156774,"施工过程中对影响施工质量的各种因素进行全面的动态控制，关键是（ ）。",[188,190,192,194],{"key":20,"text":189,"correct":22},"设置质量控制点",{"key":24,"text":191,"correct":22},"明确质量目标",{"key":28,"text":193,"correct":22},"制定施工方案",{"key":31,"text":195,"correct":26},"坚持质量标准",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":24,"analysis":33},1156775,"施工准备阶段主要工作目标是（ ）。",[200,202,204,206],{"key":20,"text":201,"correct":22},"依法签订工程承包合同",{"key":24,"text":203,"correct":26},"组建项目经理部",{"key":28,"text":205,"correct":22},"加工钢筋",{"key":31,"text":207,"correct":22},"开挖土方",{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":31,"analysis":33},1156776,"下列分部（分项）工程中，需要编制分部（分项）工程施工组织设计的是（ ）。",[212,214,216,218],{"key":20,"text":213,"correct":22},"零星土石方工程",{"key":24,"text":215,"correct":22},"场地平整",{"key":28,"text":217,"correct":22},"混凝土垫层工程",{"key":31,"text":219,"correct":26},"定向爆破工程",{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":24,"analysis":33},1156777,"下列选项中，不属于施工项目管理组织的主要形式的是（ ）。",[224,226,228,230],{"key":20,"text":225,"correct":22},"工作队式",{"key":24,"text":227,"correct":26},"线性结构式",{"key":28,"text":229,"correct":22},"矩阵制式",{"key":31,"text":231,"correct":22},"事业部制式",{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":31,"analysis":33},1156778,"施工项目管理的最后阶段是指（ ）。",[236,237,238,239],{"key":20,"text":101,"correct":22},{"key":24,"text":103,"correct":22},{"key":28,"text":105,"correct":22},{"key":31,"text":240,"correct":26},"用后服务",{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":28,"analysis":33},1156779,"施工项目管理的依据是（ ）。",[245,247,249,251],{"key":20,"text":246,"correct":22},"初步设计文件",{"key":24,"text":248,"correct":22},"可行性研究报告",{"key":28,"text":250,"correct":26},"施工承包合同",{"key":31,"text":252,"correct":22},"监理委托合同",{"id":254,"libraryId":5,"type":15,"typeLabel":16,"stem":255,"options":256,"answer":20,"analysis":33},1156780,"建筑施工企业项目经理在承担工程项目施工管理工作中，行使的管理权利有（ ）。",[257,259,261,263],{"key":20,"text":258,"correct":26},"调配并管理进入工程项目的各种生产要素",{"key":24,"text":260,"correct":22},"负责组建项目经理部",{"key":28,"text":262,"correct":22},"执行项目承包合同约定的应由项目经理负责履行的各项条款",{"key":31,"text":264,"correct":22},"负责选择并使用具有相应资质的分包入",{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":28,"analysis":33},1156781,"由于质量事故，造成人员死亡或重伤3入以上的属于（ ）。",[269,271,273,275],{"key":20,"text":270,"correct":22},"一般质量事故",{"key":24,"text":272,"correct":22},"严重质量事故",{"key":28,"text":274,"correct":26},"重大质量事故",{"key":31,"text":276,"correct":22},"特别重大事故",{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":31,"analysis":33},1156782,"下列哪项不是当施工引起的质量问题在萌芽状态的措施（ ）。",[281,283,285,287],{"key":20,"text":282,"correct":22},"及时制止，",{"key":24,"text":284,"correct":22},"要求施工单位立即更换不合格材料、设备、不称职人员",{"key":28,"text":286,"correct":22},"立即改变不正确的施工方法和操作工艺",{"key":31,"text":288,"correct":26},"报告项目监理机构",{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":28,"analysis":33},1156784,"（ ）是实现建设工程项目目标的有力保障。",[293,295,297,299],{"key":20,"text":294,"correct":22},"施工单位的质量保证",{"key":24,"text":296,"correct":22},"项目决策阶段的质量控制",{"key":28,"text":298,"correct":26},"工程勘察设计质量管理",{"key":31,"text":300,"correct":22},"工程施工阶段的质量控制",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":24,"analysis":33},1156785,"如果一个总体是由质量明显差异的几个部分组成，则宜采用（ ）。",[305,307,309,311],{"key":20,"text":306,"correct":22},"整群抽样",{"key":24,"text":308,"correct":26},"分层随机抽样",{"key":28,"text":310,"correct":22},"系统抽样",{"key":31,"text":312,"correct":22},"简单随机抽样",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":28,"analysis":33},1156786,"下列属于PDCA中处置的活动是（ ）。",[317,319,321,323],{"key":20,"text":318,"correct":22},"确定质量控制的组织制度",{"key":24,"text":320,"correct":22},"按计划开展技术交底",{"key":28,"text":322,"correct":26},"对检查发现的质量问题采取措施",{"key":31,"text":324,"correct":22},"检查工程是否按计划执行",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":20,"analysis":33},1156787,"下列说法正确的是（ ）。",[329,331,333,335],{"key":20,"text":330,"correct":26},"施工单位负责施工现场检测工作的组织管理和实施",{"key":24,"text":332,"correct":22},"总包单位负责其合同范围内施工现场检测工作的实施",{"key":28,"text":334,"correct":22},"分包单位负责施工现场检测工作的整体组织管理和实施",{"key":31,"text":336,"correct":22},"施工单位不可自行进行检测，只能委托检测机构进行检测",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":31,"analysis":33},1156789,"当样品总体很大时，可以采用整群抽样和分层抽样相结合，这种方法又称为（ ）。",[341,342,344,345],{"key":20,"text":306,"correct":22},{"key":24,"text":343,"correct":22},"分层抽样",{"key":28,"text":310,"correct":22},{"key":31,"text":346,"correct":26},"多阶段抽样",{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":31,"analysis":33},1156790,"下列不属于施工现场质量检查方法的是（ ）。",[351,352,353,355],{"key":20,"text":129,"correct":22},{"key":24,"text":131,"correct":22},{"key":28,"text":354,"correct":22},"试验法",{"key":31,"text":356,"correct":26},"物理法",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":28,"analysis":33},1156791,"下列哪项不属于可用性中的建筑物理功能（ ）。",[361,363,365,367],{"key":20,"text":362,"correct":22},"采光",{"key":24,"text":364,"correct":22},"通风",{"key":28,"text":366,"correct":26},"采热",{"key":31,"text":368,"correct":22},"隔声",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":28,"analysis":33},1156792,"（ ）适用于处理地下水位以上、天然含水量12%-25%、厚度5-15mm的素填土、杂填土、湿陷性黄土以及含水率较大的软弱地基等。",[373,375,377,379],{"key":20,"text":374,"correct":22},"换土垫层法",{"key":24,"text":376,"correct":22},"重锤夯实法",{"key":28,"text":378,"correct":26},"灰土挤密桩",{"key":31,"text":380,"correct":22},"深层密实法",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":31,"analysis":33},1156793,"第一次抽样检查的该批钢筋不允许超过（ ）t。",[385,387,389,391],{"key":20,"text":386,"correct":22},"10",{"key":24,"text":388,"correct":22},"20",{"key":28,"text":390,"correct":22},"40",{"key":31,"text":392,"correct":26},"60",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":24,"analysis":33},1156794,"直接经济损失在5万元以上，不满10万元的属于（ ）。",[397,398,399,400],{"key":20,"text":270,"correct":22},{"key":24,"text":272,"correct":26},{"key":28,"text":274,"correct":22},{"key":31,"text":276,"correct":22},{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":31,"analysis":33},1156795,"某多层钢筋混凝土现浇框架结构施工，抗震等级为三级，主要结构钢材品种为HPB300、HRB400 E，柱筋接长采用电渣压力焊施工。根据本项目情况标准员编制了执行工程建设标准强制性条文落实计划表，见表1。请根据上述背景资料完成以下选项。 工地对热轧钢筋进行重量偏差检验，按规定每批应抽取（ ）个试件。",[405,407,409,411],{"key":20,"text":406,"correct":22},"2",{"key":24,"text":408,"correct":22},"3",{"key":28,"text":410,"correct":22},"4",{"key":31,"text":412,"correct":26},"5",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":31,"analysis":33},1156796,"直接经济损失达500万元及其以上的属于（ ）。",[417,418,419,420],{"key":20,"text":270,"correct":22},{"key":24,"text":272,"correct":22},{"key":28,"text":274,"correct":22},{"key":31,"text":276,"correct":26},{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":31,"analysis":33},1156797,"下列不属于影响工程施工质量的环境条件的是（ ）。",[425,427,429,431],{"key":20,"text":426,"correct":22},"现场施工环境",{"key":24,"text":428,"correct":22},"自然环境条件",{"key":28,"text":430,"correct":22},"工程技术条件",{"key":31,"text":432,"correct":26},"施工组织设计",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":28,"analysis":33},1156798,"直接经济损失10万元以上的属于（ ）。",[437,438,439,440],{"key":20,"text":270,"correct":22},{"key":24,"text":272,"correct":22},{"key":28,"text":274,"correct":26},{"key":31,"text":276,"correct":22},{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":28,"analysis":33},1156799,"目标控制的基本方法中，C表示（ ）。",[445,447,449,451],{"key":20,"text":446,"correct":22},"计划",{"key":24,"text":448,"correct":22},"实施",{"key":28,"text":450,"correct":26},"检查",{"key":31,"text":452,"correct":22},"处置",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":28,"analysis":33},1156801,"由于质量事故，造成人员死亡或重伤3人以上的属于（ ）。",[457,458,459,460],{"key":20,"text":270,"correct":22},{"key":24,"text":272,"correct":22},{"key":28,"text":274,"correct":26},{"key":31,"text":276,"correct":22},{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":28,"analysis":33},1156802,"工程倒塌或报废属于（ ）。",[465,466,467,468],{"key":20,"text":270,"correct":22},{"key":24,"text":272,"correct":22},{"key":28,"text":274,"correct":26},{"key":31,"text":276,"correct":22},{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":24,"analysis":33},1156803,"下列不属于工程项目质量协调性的内容是（ ）。",[473,475,477,479],{"key":20,"text":474,"correct":22},"造型与美感",{"key":24,"text":476,"correct":26},"空间布置合理性",{"key":28,"text":478,"correct":22},"与生态环境的协调",{"key":31,"text":480,"correct":22},"与社区环境的协调",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":31,"analysis":33},1156804,"目标控制的基本方法中，A表示（ ）。",[485,486,487,488],{"key":20,"text":446,"correct":22},{"key":24,"text":448,"correct":22},{"key":28,"text":450,"correct":22},{"key":31,"text":452,"correct":26},{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":31,"analysis":33},1156805,"下列哪项不能体现工程项目质量的可用性（ ）。",[493,495,496,498],{"key":20,"text":494,"correct":22},"平面布置合理性",{"key":24,"text":476,"correct":22},{"key":28,"text":497,"correct":22},"建筑物理功能",{"key":31,"text":499,"correct":26},"造型与美观",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":20,"analysis":33},1156806,"目标控制的基本方法中，P表示（ ）。",[504,505,506,507],{"key":20,"text":446,"correct":26},{"key":24,"text":448,"correct":22},{"key":28,"text":450,"correct":22},{"key":31,"text":452,"correct":22},{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":24,"analysis":33},1156807,"目标控制的基本方法中，D表示（ ）。",[512,513,514,515],{"key":20,"text":446,"correct":22},{"key":24,"text":448,"correct":26},{"key":28,"text":450,"correct":22},{"key":31,"text":452,"correct":22},{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":20,"analysis":33},1156808,"下列不属于影响工程质量的方法工艺的是（ ）。",[520,522,523,524],{"key":20,"text":521,"correct":26},"施工机械设备",{"key":24,"text":432,"correct":22},{"key":28,"text":81,"correct":22},{"key":31,"text":525,"correct":22},"工艺技术",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":31,"analysis":33},1156809,"（ ）是工程实体最终形成的阶段。",[530,532,534,536],{"key":20,"text":531,"correct":22},"工程预算阶段",{"key":24,"text":533,"correct":22},"项目决策阶段",{"key":28,"text":535,"correct":22},"工程勘察设计阶段",{"key":31,"text":537,"correct":26},"工程施工阶段",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":24,"analysis":33},1156810,"某多层钢筋混凝土现浇框架结构施工，抗震等级为三级，主要结构钢材品种为HPB300、HRB400 E，柱筋接长采用电渣压力焊施工。根据本项目情况标准员编制了执行工程建设标准强制性条文落实计划表，见表1。请根据上述背景资料完成以下选项。 本工程一次进场HRB400E钢筋65t，则按规定至少需取样（ ）组试件。",[542,544,545,546],{"key":20,"text":543,"correct":22},"1",{"key":24,"text":406,"correct":26},{"key":28,"text":408,"correct":22},{"key":31,"text":410,"correct":22},{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":24,"analysis":33},1156811,"下列哪项不属于工程质量的主要特点（ ）。",[551,553,555,557],{"key":20,"text":552,"correct":22},"影响因素多",{"key":24,"text":554,"correct":26},"协调性好",{"key":28,"text":556,"correct":22},"波动大",{"key":31,"text":558,"correct":22},"隐蔽性强",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":24,"analysis":33},1156812,"组成总体的基本元素称为（ ）。",[563,565,567,569],{"key":20,"text":564,"correct":22},"样本",{"key":24,"text":566,"correct":26},"个体",{"key":28,"text":568,"correct":22},"单位产品",{"key":31,"text":570,"correct":22},"子样",[572,575,578,581,584,587],{"id":15,"name":573,"category":7,"favorite":574},"领导干部任职前廉政法规知识测试题",92,{"id":576,"name":577,"category":7,"favorite":15},595,"建筑结构与设备",{"id":579,"name":580,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":582,"name":583,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":585,"name":586,"category":7,"favorite":8},534,"BIM工程师",{"id":588,"name":586,"category":7,"favorite":8},535]