[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-817-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":608},{"id":5,"name":6,"category":7,"favorite":8},817,"(标准员)基础知识","建筑工程",0,6,50,1283,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,307,319,331,341,353,361,373,385,397,409,421,433,445,457,469,481,493,505,517,529,541,552,564,574,584,596],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1156710,1,"单选题","某建设工程项目的管理按照职能组织结构模式运行，这个组织系统的特点是（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","没有相互矛盾的指令源",false,{"key":24,"text":25,"correct":22},"B","有纵向和横向的指令源",{"key":27,"text":28,"correct":29},"C","可能有多个矛盾的指令源",true,{"key":31,"text":32,"correct":22},"D","指令源唯一","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1156711,"根据建设单位的要求和施工单位的承诺开展施工质量控制体现了（ ）原则。",[38,40,42,44],{"key":20,"text":39,"correct":22},"依法施工",{"key":24,"text":41,"correct":29},"践约施工",{"key":27,"text":43,"correct":22},"按图施工",{"key":31,"text":45,"correct":22},"惯例施工",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1156712,"当一个施工段上所需完成的劳动量（工日数）或机械台班量（台班数）和每天的工作班数固定不变，增加班组的入数或机械台班数，流水节拍（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"变大",{"key":24,"text":53,"correct":29},"不变",{"key":27,"text":55,"correct":22},"不能确定",{"key":31,"text":57,"correct":22},"变小",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1156713,"下列性质中，不属于项目经理部的性质的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":29},"法律强制性",{"key":24,"text":65,"correct":22},"相对独立性",{"key":27,"text":67,"correct":22},"综合性",{"key":31,"text":69,"correct":22},"临时性",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},1156714,"对进入施工现场的钢筋取样后进行力学性能检测，属于施工质量控制方法中的",[74,76,78,80],{"key":20,"text":75,"correct":22},"目测法",{"key":24,"text":77,"correct":22},"实测法",{"key":27,"text":79,"correct":29},"试验法",{"key":31,"text":81,"correct":22},"无损检验法",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},1156715,"对施工项目管理目标、组织、内容、方法、步骤、重点进行预测和决策，做出具体安排的文件是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"项目承包合同文件",{"key":24,"text":89,"correct":22},"项目监理规划",{"key":27,"text":91,"correct":29},"施工项目管理规划",{"key":31,"text":93,"correct":22},"施工项目目标责任书",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},1156716,"下列措施中，不属于施工准备阶段的安全技术措施的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"技术准备",{"key":24,"text":101,"correct":22},"物资准备",{"key":27,"text":103,"correct":29},"资金准备",{"key":31,"text":105,"correct":22},"施工队伍准备",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},1156717,"下列各项措施中，不属于施工项目质量控制的措施的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"提高管理、施工及操作人员自身素质",{"key":24,"text":113,"correct":22},"提高施工的质量管理水平",{"key":27,"text":115,"correct":29},"尽可能采用先进的施工技术、方法和新材料、新工艺、新技术，保证进度目标实现",{"key":31,"text":117,"correct":22},"加强施工项目的过程控制",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1156718,"下列施工质量控制措施中，属于事前控制的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":29},"设计交底",{"key":24,"text":125,"correct":22},"重要结构实体检测",{"key":27,"text":127,"correct":22},"隐蔽工程验收",{"key":31,"text":129,"correct":22},"施工质量检查验收",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},1156719,"建设项目的管理从（ ）开始。",[134,136,138,140],{"key":20,"text":135,"correct":22},"施工招投标",{"key":24,"text":137,"correct":22},"编制初步设计文件",{"key":27,"text":139,"correct":22},"施工图设计审查",{"key":31,"text":141,"correct":29},"项目建议书编制",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},1156720,"项目目标动态控制的核心是在项目实施的过程中定期地进行（ ）的比较。",[146,148,150,152],{"key":20,"text":147,"correct":22},"项目目标计划值和偏差值",{"key":24,"text":149,"correct":22},"项目目标实际值和偏差值",{"key":27,"text":151,"correct":29},"项目目标计划值和实际值",{"key":31,"text":153,"correct":22},"项目目标当期值和上-期值",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":27,"analysis":33},1156721,"下列各项管理权力中，属于施工项目经理管理权力的是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"自行决定是否分包及选择分包企业",{"key":24,"text":161,"correct":22},"编制和确定需政府监管的招标方案，评选和确定投标、中标单位",{"key":27,"text":163,"correct":29},"指挥建设工程项目建设的生产经营活动，调配并管理进入工程项目的生产要素",{"key":31,"text":165,"correct":22},"代表企业法入参加民事活动，行使企业法入的一切权力",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},1156722,"下列项目目标动态控制的工作中，属于项目目标动态控制准备工作的是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":29},"将项目的目标进行分解",{"key":24,"text":173,"correct":22},"收集项目目标的实际值",{"key":27,"text":175,"correct":22},"对项目目标进行动态跟踪",{"key":31,"text":177,"correct":22},"找出实际值与计划值的偏差",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},1156723,"施工项目控制的任务是进行以项目进度控制、质量控制、成本控制和安全控制为主要内容的四大目标控制。其中下列不属于与施工项目成果相关的是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"进度控制",{"key":24,"text":185,"correct":29},"安全控制",{"key":27,"text":187,"correct":22},"质量控制",{"key":31,"text":189,"correct":22},"成本控制",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},1156724,"施工企业项目经理是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":29},"项目的全权负责人",{"key":24,"text":197,"correct":22},"项目法定代表入",{"key":27,"text":199,"correct":22},"施工合同当事入",{"key":31,"text":201,"correct":22},"项目管理班子的负责人",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":27,"analysis":33},1156725,"建设工程施工管理中的组织结构图反映的是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"一个项目管理班子中各组成部门之间的逻辑关系",{"key":24,"text":209,"correct":22},"一个项目中各组成部分之间的组织关系",{"key":27,"text":211,"correct":29},"一个项目管理班子中各组成部门之间的组织关系",{"key":31,"text":213,"correct":22},"一个项目中各组成部分之间的逻辑关系",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":27,"analysis":33},1156726,"下列选项中，施工机具和材料的选择主要考虑的因素不包括（ ）",[218,220,222,224],{"key":20,"text":219,"correct":22},"应尽量选用施工单位现有机具",{"key":24,"text":221,"correct":22},"机具类型应符合施工现场的条件",{"key":27,"text":223,"correct":29},"在同一个工地上施工机具的种类和型号应尽可能多",{"key":31,"text":225,"correct":22},"考虑所选机械的运行成本是否经济",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":31,"analysis":33},1156727,"施工项目实施的过程是指，建筑业企业自工程施工投标开始到（ ）为止的全过程。",[230,232,234,236],{"key":20,"text":231,"correct":22},"竣工验收合格",{"key":24,"text":233,"correct":22},"提交竣工验收报告之日",{"key":27,"text":235,"correct":22},"签发接收证书之日",{"key":31,"text":237,"correct":29},"保修期满",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":20,"analysis":33},1156728,"施工项目过程控制中，加强专项检查，包括自检、（ ）、互检。",[242,244,246,248],{"key":20,"text":243,"correct":29},"专检",{"key":24,"text":245,"correct":22},"全检",{"key":27,"text":247,"correct":22},"交接检",{"key":31,"text":249,"correct":22},"质检",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},1156729,"施工组织总设计包括如下工作：①计算主要工种工程的工程量；②编制施工总进度计划；③编制资源需求量计划；④拟订施工方案。其正确的工作排序是（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"①②③④",{"key":24,"text":257,"correct":29},"①④②③",{"key":27,"text":259,"correct":22},"①③②④",{"key":31,"text":261,"correct":22},"④①②③",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":31,"analysis":33},1156730,"某建设工程项目经理部根据目标动态控制原理，将项目目标进行了分解，那么在项目目标实施过程中，首先应进行的工作是（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":22},"确定目标控制的计划值",{"key":24,"text":269,"correct":22},"定期比较目标计划值与实际值",{"key":27,"text":271,"correct":22},"分析比较结果，采取纠偏措施",{"key":31,"text":273,"correct":29},"收集目标的实际完成值",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":24,"analysis":33},1156731,"危险性较大的分部分项工程专项施工方案应由（ ）审核签字。",[278,280,282,284],{"key":20,"text":279,"correct":22},"项目经理",{"key":24,"text":281,"correct":29},"施工单位技术负责人",{"key":27,"text":283,"correct":22},"企业技术负责人",{"key":31,"text":285,"correct":22},"总监理工程师",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},1156732,"某施工项目部决定将原来的横道图进度计划改为网络进度计划进行进度控制，以避免工作之间出现不协调情况。该项进度控制措施属于（ ）。",[290,292,294,296],{"key":20,"text":291,"correct":22},"组织措施",{"key":24,"text":293,"correct":29},"管理措施",{"key":27,"text":295,"correct":22},"经济措施",{"key":31,"text":297,"correct":22},"技术措施",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":20,"analysis":33},1156733,"某施工项目进行成本管理，采取了多项措施，其中实行项目经理责任制、编制工作流程图等措施属于施工成本管理的（ ）。",[302,303,304,305],{"key":20,"text":291,"correct":29},{"key":24,"text":297,"correct":22},{"key":27,"text":295,"correct":22},{"key":31,"text":306,"correct":22},"合同措施",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":27,"analysis":33},1156734,"下列关于施工项目管理组织的形式的说法中，错误的是（ ）。",[311,313,315,317],{"key":20,"text":312,"correct":22},"工作队式项目组织适用于大型项目，工期要求紧，要求多工种、多部门配合的项目",{"key":24,"text":314,"correct":22},"事业部式适用于大型经营型企业的工程承包",{"key":27,"text":316,"correct":29},"部门控制式项目组织一般适用于专业性强的大中型项目",{"key":31,"text":318,"correct":22},"矩阵制项目组织适用于同时承担多个需要进行项目管理工程的企业",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":27,"analysis":33},1156735,"下列质量管理的职能活动中，属于PDCA循环中的”D”职能的活动是（ ）。",[323,325,327,329],{"key":20,"text":324,"correct":22},"明确项目质量目标",{"key":24,"text":326,"correct":22},"专职质检员检查产品质量",{"key":27,"text":328,"correct":29},"行动方案的部署和交底",{"key":31,"text":330,"correct":22},"制定实现质量目标的行动方案",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":20,"analysis":33},1156736,"施工组织总设计应由（ ）审批。",[335,337,338,339],{"key":20,"text":336,"correct":29},"总承包单位技术负责人",{"key":24,"text":279,"correct":22},{"key":27,"text":281,"correct":22},{"key":31,"text":340,"correct":22},"项目部技术负责人",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":20,"analysis":33},1156737,"施工项目实施的过程是指，建筑业企业自（ ）开始到保修期满为止的全过程。",[345,347,349,351],{"key":20,"text":346,"correct":29},"工程施工投标",{"key":24,"text":348,"correct":22},"工程施工招标",{"key":27,"text":350,"correct":22},"签订施工承包合同",{"key":31,"text":352,"correct":22},"施工开工报告被批准日期",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":31,"analysis":33},1156738,"为了取得施工成本管理的理想效果，必须从多方面采取有效措施实施管理，这些措施不包括（ ）。",[357,358,359,360],{"key":20,"text":291,"correct":22},{"key":24,"text":297,"correct":22},{"key":27,"text":295,"correct":22},{"key":31,"text":293,"correct":29},{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":31,"analysis":33},1156739,"进行有效的成本偏差控制，成本分析是（ ）。",[365,367,369,371],{"key":20,"text":366,"correct":22},"中心",{"key":24,"text":368,"correct":22},"目的",{"key":27,"text":370,"correct":22},"目标",{"key":31,"text":372,"correct":29},"关键",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":27,"analysis":33},1156740,"施工项目经理在承担工程项目施工的管理过程中，是以（ ）身份处理与所承担的工程项目有关的外部关系的。",[377,379,381,383],{"key":20,"text":378,"correct":22},"施工企业决策者",{"key":24,"text":380,"correct":22},"施工企业法定代表入",{"key":27,"text":382,"correct":29},"施工企业法定代表入的代表",{"key":31,"text":384,"correct":22},"建设单位项目管理者",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":24,"analysis":33},1156741,"下列选项中关于施工项目管理的特点说法有误的是（ ）。",[389,391,393,395],{"key":20,"text":390,"correct":22},"对象是施工项目",{"key":24,"text":392,"correct":29},"主体是建设单位",{"key":27,"text":394,"correct":22},"内容是按阶段变化的",{"key":31,"text":396,"correct":22},"要求强化组织协调工作",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":27,"analysis":33},1156742,"建筑施工企业项目经理是指受企业（ ）委托对工程项目施工过程全面负责的项目管理者",[401,403,405,407],{"key":20,"text":402,"correct":22},"董事会",{"key":24,"text":404,"correct":22},"总工程师",{"key":27,"text":406,"correct":29},"法定代表入",{"key":31,"text":408,"correct":22},"股东代表大会",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":20,"analysis":33},1156743,"下列专业工程实行分包的，其专项方案不能由专业承包单位组织编制的是（ ）",[413,415,417,419],{"key":20,"text":414,"correct":29},"高支架模板工程",{"key":24,"text":416,"correct":22},"起重机械安装拆卸工程",{"key":27,"text":418,"correct":22},"深基坑工程",{"key":31,"text":420,"correct":22},"附着式升降脚手架工程",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":31,"analysis":33},1156744,"建设的管理主体是（ ）。",[425,427,429,431],{"key":20,"text":426,"correct":22},"设计单位",{"key":24,"text":428,"correct":22},"监理单位",{"key":27,"text":430,"correct":22},"施工单位",{"key":31,"text":432,"correct":29},"项目业主",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":24,"analysis":33},1156745,"在工程网络计划中，关键工作是指网络计划中（ ）。",[437,439,441,443],{"key":20,"text":438,"correct":22},"总时差为零的工作",{"key":24,"text":440,"correct":29},"总时差最小的工作",{"key":27,"text":442,"correct":22},"自由时差为零的工作",{"key":31,"text":444,"correct":22},"自由时差最小的工作",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":31,"analysis":33},1156746,"施工成本预测是在工程的施工以前，运用一定的方法（ ）。",[449,451,453,455],{"key":20,"text":450,"correct":22},"对成本因素进行分析",{"key":24,"text":452,"correct":22},"分析可能的影响程度",{"key":27,"text":454,"correct":22},"估算计划与实际成本之间的可能差异",{"key":31,"text":456,"correct":29},"对成本进行估算",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":31,"analysis":33},1156747,"有时由于各施工段的工程量不等，各施工班组的施工入数又不同，使同一施工过程在各施工段上或各施工过程在同一施工段上的流水节拍无规律性，这是需要组织（ ）。",[461,463,465,467],{"key":20,"text":462,"correct":22},"等节拍流水",{"key":24,"text":464,"correct":22},"成倍节拍专业流水",{"key":27,"text":466,"correct":22},"加快成倍节拍专业流水",{"key":31,"text":468,"correct":29},"无节奏专业流水",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":27,"analysis":33},1156748,"下列选项中，不属于建立施工项目经理部的基本原则的是（ ）。",[473,475,477,479],{"key":20,"text":474,"correct":22},"根据所设计的项目组织形式设置",{"key":24,"text":476,"correct":22},"适应现场施工的需要",{"key":27,"text":478,"correct":29},"满足建设单位关于施工项目目标控制的要求",{"key":31,"text":480,"correct":22},"根据施工工程任务需要调整",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":27,"analysis":33},1156749,"运用动态控制原理控制施工成本的步骤中，第一步应做的工作是（ ）。",[485,487,489,491],{"key":20,"text":486,"correct":22},"按照成本控制得要求收集施工成本的实际值",{"key":24,"text":488,"correct":22},"找出偏差，采取纠偏措施",{"key":27,"text":490,"correct":29},"施工成本目标得逐层分解",{"key":31,"text":492,"correct":22},"定期对施工成本的计划值和实际值进行比较",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":24,"analysis":33},1156750,"双代号时标网络计划中，波形线表示工作的（ ）。",[497,499,501,503],{"key":20,"text":498,"correct":22},"总时差",{"key":24,"text":500,"correct":29},"自由时差",{"key":27,"text":502,"correct":22},"相干时差",{"key":31,"text":504,"correct":22},"工作时间",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":20,"analysis":33},1156751,"下列项目目标动态控制措施中，属于管理措施的是（ ）。",[509,511,513,515],{"key":20,"text":510,"correct":29},"强化合同管理",{"key":24,"text":512,"correct":22},"调整职能分工",{"key":27,"text":514,"correct":22},"优化组织结构",{"key":31,"text":516,"correct":22},"改进施工工艺",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":27,"analysis":33},1156752,"某建设工程施工进度计划如下图所示（时间单位：天），则该计划的计算工期是（ ）天。",[521,523,525,527],{"key":20,"text":522,"correct":22},"20",{"key":24,"text":524,"correct":22},"21",{"key":27,"text":526,"correct":29},"23",{"key":31,"text":528,"correct":22},"25",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":20,"analysis":33},1156753,"某住宅小区工程施工前，施工项目管理机构绘制了如下框图。该图是（ ）。",[533,535,537,539],{"key":20,"text":534,"correct":29},"项目结构图",{"key":24,"text":536,"correct":22},"组织结构图",{"key":27,"text":538,"correct":22},"工作流程图",{"key":31,"text":540,"correct":22},"合同结构图",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":20,"analysis":33},1156754,"某建设工程项目的总承包商在该项目组织结构采用了线性组织结构模式，这种组织结构的特点是（ ）。",[545,547,548,550],{"key":20,"text":546,"correct":29},"每个工作部门只接受-八上级的直接领导",{"key":24,"text":28,"correct":22},{"key":27,"text":549,"correct":22},"有横向和纵向两个指令源",{"key":31,"text":551,"correct":22},"促进了管理专业化分工",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":27,"analysis":33},1156755,"施工项目经理部即根据（ ）对管理目标进行分解、细化，使目标落实到岗、到入。",[556,558,560,562],{"key":20,"text":557,"correct":22},"施工承包合同",{"key":24,"text":559,"correct":22},"施工组织设计",{"key":27,"text":561,"correct":29},"施工项目管理目标责任书",{"key":31,"text":563,"correct":22},"业主要求",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":24,"analysis":33},1156756,"在不影响紧后工作最早开始时间的条件下，允许延误的最长时间是（ ）。",[568,569,570,572],{"key":20,"text":498,"correct":22},{"key":24,"text":500,"correct":29},{"key":27,"text":571,"correct":22},"最晚开始时间",{"key":31,"text":573,"correct":22},"最晚结束时间",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":27,"analysis":33},1156757,"施工准备阶段编写开工报告的主体是（ ）。",[578,580,581,582],{"key":20,"text":579,"correct":22},"建设业主",{"key":24,"text":428,"correct":22},{"key":27,"text":430,"correct":29},{"key":31,"text":583,"correct":22},"分包单位",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":27,"analysis":33},1156758,"施工成本计划的编制以成本预测为基础，关键是（ ）。",[588,590,592,594],{"key":20,"text":589,"correct":22},"动员全体施工管理人员",{"key":24,"text":591,"correct":22},"挖掘降低成本潜力",{"key":27,"text":593,"correct":29},"确定目标成本",{"key":31,"text":595,"correct":22},"广泛收集相关资料",{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":24,"analysis":33},1156759,"施工项目技术负责人每天在施工日志上对当天的施工质量和进度情况进行详细记载，属于目标动态控制过程中（ ）的工作。",[600,602,604,606],{"key":20,"text":601,"correct":22},"准备阶段",{"key":24,"text":603,"correct":29},"收集项目实际值",{"key":27,"text":605,"correct":22},"进行目标计划值和实际值比较",{"key":31,"text":607,"correct":22},"纠偏环节",[609,612,615,618,621,624],{"id":15,"name":610,"category":7,"favorite":611},"领导干部任职前廉政法规知识测试题",92,{"id":613,"name":614,"category":7,"favorite":15},595,"建筑结构与设备",{"id":616,"name":617,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":619,"name":620,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":622,"name":623,"category":7,"favorite":8},534,"BIM工程师",{"id":625,"name":623,"category":7,"favorite":8},535]