[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-817-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":595},{"id":5,"name":6,"category":7,"favorite":8},817,"(标准员)基础知识","建筑工程",0,5,50,1283,[13,34,46,56,68,80,92,104,116,128,140,150,162,171,179,187,199,211,223,235,247,259,271,283,295,307,319,331,343,355,367,379,391,403,414,425,437,449,461,472,484,496,508,520,530,542,551,563,571,583],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1156659,1,"单选题","根据预制桩入土受力方式分为打入式和（ ）两种。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","动力压桩式",false,{"key":24,"text":25,"correct":26},"B","静力压桩式",true,{"key":28,"text":29,"correct":22},"C","弹力压桩式",{"key":31,"text":32,"correct":22},"D","阻力压桩式","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1156660,"（ ）适用于处理碎石、砂土、低饱和度的黏性土、粉土、湿陷性黄土及填土地基等的深层加固。",[38,40,42,44],{"key":20,"text":39,"correct":22},"换土垫层法",{"key":24,"text":41,"correct":26},"强夯法",{"key":28,"text":43,"correct":22},"灰土挤密桩",{"key":31,"text":45,"correct":22},"深层密实法",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1156661,"（ ）适用于地下水位较低，基槽经常处于较干燥状态下的一般黏性土地基的加固。",[50,51,53,55],{"key":20,"text":39,"correct":26},{"key":24,"text":52,"correct":22},"夯实地基法",{"key":28,"text":54,"correct":22},"挤密桩施工法",{"key":31,"text":45,"correct":22},{"id":57,"libraryId":5,"type":15,"typeLabel":16,"stem":58,"options":59,"answer":28,"analysis":33},1156662,"下列各项中，关于常见模板的种类、特性的基本规定不正确的说法是（ ）。",[60,62,64,66],{"key":20,"text":61,"correct":22},"常见模板的种类有组合式模板、工具式模板两大类",{"key":24,"text":63,"correct":22},"爬升模板适用于现浇钢筋混凝土竖向（或倾斜）结构",{"key":28,"text":65,"correct":26},"飞模适用于小开间、小柱网、小进深的钢筋混凝土楼盖施工",{"key":31,"text":67,"correct":22},"组合式模板可事先按设计要求组拼成梁、柱、墙、楼板的大型模板，整体吊装就位，也可采用散支散拆方法",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":28,"analysis":33},1156663,"砖砌体的施工工艺过程正确是的（ ）。",[72,74,76,78],{"key":20,"text":73,"correct":22},"找平、放线、摆砖样、盘角、立皮数杆、砌筑、勾缝、清理、楼层标高控制、楼层轴线标引等",{"key":24,"text":75,"correct":22},"找平、放线、摆砖样、立皮数杆、盘角、砌筑、清理、勾缝、楼层轴线标引、楼层标高控制等",{"key":28,"text":77,"correct":26},"找平、放线、摆砖样、立皮数杆、盘角、砌筑、勾缝、清理、楼层轴线标引、楼层标高控制等",{"key":31,"text":79,"correct":22},"找平、放线、立皮数杆、摆砖样、盘角、挂线、砌筑、勾缝、清理、楼层标高控制、楼层轴线标引等",{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":24,"analysis":33},1156664,"下列关于涂料防水中防水层施工的说法中，正确的是（ ）。",[84,86,88,90],{"key":20,"text":85,"correct":22},"湿铺法是在铺第三遍涂料涂刷时，边倒料、边涂刷、边铺贴的操作方法",{"key":24,"text":87,"correct":26},"对于流动性差的涂料，为便于抹压，加快施工进度，可以采用分条间隔施工的方法，条带宽800~1000mm",{"key":28,"text":89,"correct":22},"胎体增强材料混合使用时，一般下层采用玻璃纤维布，上层采用聚酯纤维布",{"key":31,"text":91,"correct":22},"所有收头均应用密封材料压边，压扁宽度不得小于20mm",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":20,"analysis":33},1156665,"在建筑施工中，按（ ）将土分为一类土、二类土.等八类。",[96,98,100,102],{"key":20,"text":97,"correct":26},"施工开挖难易程度",{"key":24,"text":99,"correct":22},"土的颜色",{"key":28,"text":101,"correct":22},"土的组成",{"key":31,"text":103,"correct":22},"土的含水量",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":31,"analysis":33},1156666,"根据《建筑地基处理技术规范》JGJ79-2012，不适用水泥土搅拌桩复合地基处理的是（ ）。",[108,110,112,114],{"key":20,"text":109,"correct":22},"正常固结的淤泥素填土",{"key":24,"text":111,"correct":22},"素填土",{"key":28,"text":113,"correct":22},"可塑黏性土",{"key":31,"text":115,"correct":26},"密实的砂类土",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":24,"analysis":33},1156667,"某工地新进一批自粘聚酯胎改性沥青防水卷材，在进入建设工程被使用前必须进行检验验收。 若工程的屋面防水等级为II级，则该防水卷材的厚度不应小于（ ）mm。",[120,122,124,126],{"key":20,"text":121,"correct":22},"1",{"key":24,"text":123,"correct":26},"2",{"key":28,"text":125,"correct":22},"3",{"key":31,"text":127,"correct":22},"4",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":24,"analysis":33},1156668,"下列关于砌块砌体施工工艺的基本规定中，错误的是（ ）。",[132,134,136,138],{"key":20,"text":133,"correct":22},"灰缝厚度宜为15mm",{"key":24,"text":135,"correct":26},"灰缝要求横平竖直，水平灰缝应饱满，竖缝采用挤浆和加浆方法，允许用水冲洗清理灌缝",{"key":28,"text":137,"correct":22},"在墙体底部，在砌第一皮加气砖前，应用实心砖砌筑，其高度宜不小于200mm",{"key":31,"text":139,"correct":22},"与梁的接触处待加气砖砌完7d后采用灰砂砖斜砌顶紧",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":20,"analysis":33},1156669,"（ ）适用于挤密松散砂土、素填土和杂填土等地基，起到挤密周围土层、增加地基承载力的作用。",[144,146,148,149],{"key":20,"text":145,"correct":26},"砂石桩",{"key":24,"text":147,"correct":22},"重锤夯实法",{"key":28,"text":43,"correct":22},{"key":31,"text":45,"correct":22},{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":28,"analysis":33},1156670,"下列关于涂料防水施工工艺的说法中，错误的是（ ）。",[154,156,158,160],{"key":20,"text":155,"correct":22},"防水涂料防水层属于柔性防水层",{"key":24,"text":157,"correct":22},"一般采用外防外涂和外防内涂施工方法",{"key":28,"text":159,"correct":26},"其施工工艺流程为：找平层施工→保护层施工→防水层施工→质量检查",{"key":31,"text":161,"correct":22},"找平层有水泥砂浆找平层、沥青砂浆找平层、细石混凝土找平层三种",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":31,"analysis":33},1156671,"（ ）适用于加固较深、较厚的淤泥、淤泥土质、粉土和承载力不大于0.12MPa的饱和黏土和软黏土、沼泽地带的泥炭土等地基。",[166,167,168,169],{"key":20,"text":39,"correct":22},{"key":24,"text":147,"correct":22},{"key":28,"text":43,"correct":22},{"key":31,"text":170,"correct":26},"深层搅拌法",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":28,"analysis":33},1156672,"（ ）适用于处理地下水位以上、天然含水量12%～25%、厚度5～15mm的素填土、杂填土、湿陷性黄土以及含水率较大的软弱地基等。",[175,176,177,178],{"key":20,"text":39,"correct":22},{"key":24,"text":147,"correct":22},{"key":28,"text":43,"correct":26},{"key":31,"text":45,"correct":22},{"id":180,"libraryId":5,"type":15,"typeLabel":16,"stem":181,"options":182,"answer":24,"analysis":33},1156674,"下列关于砌块砌体施工工艺的基本规定中，不正确的是（ ）。",[183,184,185,186],{"key":20,"text":133,"correct":22},{"key":24,"text":135,"correct":26},{"key":28,"text":137,"correct":22},{"key":31,"text":139,"correct":22},{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":28,"analysis":33},1156675,"下列各项中，不属于混凝土工程施工内容的是（ ）。",[191,193,195,197],{"key":20,"text":192,"correct":22},"混凝土拌合料的制备",{"key":24,"text":194,"correct":22},"混凝土拌合料的养护",{"key":28,"text":196,"correct":26},"混凝土拌合料的强度测定",{"key":31,"text":198,"correct":22},"混凝土拌合料的振捣",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":31,"analysis":33},1156676,"下列各项中，关于钢筋连接的基本规定不正确的说法是（ ）。",[203,205,207,209],{"key":20,"text":204,"correct":22},"钢筋的连接可分为绑扎连接、焊接和机械连接三种",{"key":24,"text":206,"correct":22},"在任何情况下，纵向受拉钢筋绑扎搭接接头的搭设长度不应小于300mm，纵向受压钢筋的搭接长度不应小于200mm",{"key":28,"text":208,"correct":22},"钢筋机械连接有钢筋套筒挤压连接、钢筋锥螺纹套筒连接、钢筋镦粗直螺纹套筒连接、钢筋滚压直螺纹套筒连接",{"key":31,"text":210,"correct":26},"当受拉钢筋的直径d>22mm及受压钢筋的直径d>25mm时，不宜采用绑扎搭接接头",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":20,"analysis":33},1156677,"混凝土浇水养护的时间：对采用硅酸盐水泥、普通硅酸盐水泥或矿渣硅酸盐水泥拌制的混凝土，不得少于（ ）。",[215,217,219,221],{"key":20,"text":216,"correct":26},"7d",{"key":24,"text":218,"correct":22},"10d",{"key":28,"text":220,"correct":22},"5d",{"key":31,"text":222,"correct":22},"14d",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":24,"analysis":33},1156678,"下列焊接方法中，不属于钢结构工程常用的是（ ）。",[227,229,231,233],{"key":20,"text":228,"correct":22},"自动（半自动）埋弧焊",{"key":24,"text":230,"correct":26},"闪光对焊",{"key":28,"text":232,"correct":22},"药皮焊条手工电弧焊",{"key":31,"text":234,"correct":22},"气体保护焊",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":24,"analysis":33},1156679,"下列土的工程分类，除（ ）之外，均为岩石。",[239,241,243,245],{"key":20,"text":240,"correct":22},"软石",{"key":24,"text":242,"correct":26},"砂砾坚土",{"key":28,"text":244,"correct":22},"坚石",{"key":31,"text":246,"correct":22},"次坚石",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":31,"analysis":33},1156680,"下列关于卷材防水施工的说法中，错误的是（ ）。",[251,253,255,257],{"key":20,"text":252,"correct":22},"铺设防水卷材前应涂刷基层处理剂，基层处理剂应采用与卷材性能配套（相容）的材料，或采用同类涂料的底子油",{"key":24,"text":254,"correct":22},"铺贴高分子防水卷材时，切忌拉伸过紧，以免使卷材长期处在受拉应力状态，易加速卷材老化",{"key":28,"text":256,"correct":22},"施工工艺流程为：找平层施工—防水层施工—保护层施工—质量检查",{"key":31,"text":258,"correct":26},"卷材搭接接缝口应采用宽度不小于20mm的密封材料封严，以确保防水层的整体防水性能",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":20,"analysis":33},1156681,"下列施工项目管理程序的排序正确的是（ ）。",[263,265,267,269],{"key":20,"text":264,"correct":26},"投标、签订合同→施工准备→施工→验收交工与结算→用后服务",{"key":24,"text":266,"correct":22},"施工准备→投标、签订合同→施工→验收交工与结算→用后服务",{"key":28,"text":268,"correct":22},"投标、签订合同→施工→施工准备→验收交工与结算→用后服务",{"key":31,"text":270,"correct":22},"投标、签订合同→施工准备→施工→验收交工→用后服务与结算",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":24,"analysis":33},1156682,"某施工企业项目经理，在组织项目施工中，施工质量控制不严，造成工程返工，直接经济损失达30万元，则施工企业主要追究其（ ）。",[275,277,279,281],{"key":20,"text":276,"correct":22},"法律责任",{"key":24,"text":278,"correct":26},"经济责任",{"key":28,"text":280,"correct":22},"行政责任",{"key":31,"text":282,"correct":22},"领导责任",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":31,"analysis":33},1156683,"组建项目经理部应该以（ ）为主。",[287,289,291,293],{"key":20,"text":288,"correct":22},"企业法定代表入",{"key":24,"text":290,"correct":22},"生产副经理",{"key":28,"text":292,"correct":22},"工程部经理",{"key":31,"text":294,"correct":26},"项目经理",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":31,"analysis":33},1156684,"施工项目的劳动组织不包括下列的（ ）。",[299,301,303,305],{"key":20,"text":300,"correct":22},"劳务输入",{"key":24,"text":302,"correct":22},"劳动力组织",{"key":28,"text":304,"correct":22},"项目经理部对劳务队伍的管理",{"key":31,"text":306,"correct":26},"劳务输出",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":31,"analysis":33},1156685,"施工项目的任务范围受限于（ ）。",[311,313,315,317],{"key":20,"text":312,"correct":22},"项目立项批准文件",{"key":24,"text":314,"correct":22},"设计图纸文件",{"key":28,"text":316,"correct":22},"招标文件规定",{"key":31,"text":318,"correct":26},"项目业主和承包施工的建筑业企业所签订的施工合同",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":28,"analysis":33},1156686,"项目目标动态控制准备工作是将项目目标进行分解，以确定用于目标控制的（ ）。",[323,325,327,329],{"key":20,"text":324,"correct":22},"偏差值",{"key":24,"text":326,"correct":22},"调整值",{"key":28,"text":328,"correct":26},"计划值",{"key":31,"text":330,"correct":22},"实际值",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":31,"analysis":33},1156687,"运用动态控制原理控制建设工程项目进度时，第一步工作是（ ）。",[335,337,339,341],{"key":20,"text":336,"correct":22},"收集工程进度实际值",{"key":24,"text":338,"correct":22},"进行进度目标的调整",{"key":28,"text":340,"correct":22},"进行工程进度的计划值和实际值的比较",{"key":31,"text":342,"correct":26},"进行项目目标分解，确定目标控制的计划值",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":20,"analysis":33},1156688,"在工程项目施工质量管理中，起决定性作用的影响因素是（ ）。",[347,349,351,353],{"key":20,"text":348,"correct":26},"入",{"key":24,"text":350,"correct":22},"材料",{"key":28,"text":352,"correct":22},"机械",{"key":31,"text":354,"correct":22},"方法",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":24,"analysis":33},1156689,"影响施工质量的环境因素中，施工作业环境因素包括（ ）。",[359,361,363,365],{"key":20,"text":360,"correct":22},"地下障碍物的影响",{"key":24,"text":362,"correct":26},"施工现场交通运输条件",{"key":28,"text":364,"correct":22},"质量管理制度",{"key":31,"text":366,"correct":22},"施工工艺与工法",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":28,"analysis":33},1156690,"施工项目管理的主体是（ ）。",[371,373,375,377],{"key":20,"text":372,"correct":22},"建设单位",{"key":24,"text":374,"correct":22},"监理单位",{"key":28,"text":376,"correct":26},"施工单位",{"key":31,"text":378,"correct":22},"招标代理企业",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":28,"analysis":33},1156691,"下列说法错误的是（ ）。",[383,385,387,389],{"key":20,"text":384,"correct":22},"在正式施工时，应该首先进行全场性工程的施工",{"key":24,"text":386,"correct":22},"在安排架设电线、敷设管网和修筑公路的施工程序时，场外需要由远而近，先主干后分支",{"key":28,"text":388,"correct":26},"在安排架设电线、敷设管网和修筑公路的施工程序时，应先场内后场外",{"key":31,"text":390,"correct":22},"排水工程要先下游后上游",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":20,"analysis":33},1156692,"在国际上，建设项目管理组织系统的一种常用模式是（ ）。",[395,397,399,401],{"key":20,"text":396,"correct":26},"线性组织结构",{"key":24,"text":398,"correct":22},"混合组织结构",{"key":28,"text":400,"correct":22},"矩阵组织结构",{"key":31,"text":402,"correct":22},"职能组织结构",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":31,"analysis":33},1156693,"专项施工技术方案和危险性较大分部分项工程安全专项施工方案应由（ ）组织专项交底会。",[407,408,410,412],{"key":20,"text":294,"correct":22},{"key":24,"text":409,"correct":22},"总监理工程师",{"key":28,"text":411,"correct":22},"建设单位项目负责人",{"key":31,"text":413,"correct":26},"项目技术负责人",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":24,"analysis":33},1156694,"项目管理目标责任书应在项目实施之前，由（ ）或其授权入与项目经理协商制定。",[418,420,421,423],{"key":20,"text":419,"correct":22},"企业董事长",{"key":24,"text":288,"correct":26},{"key":28,"text":422,"correct":22},"企业总经理",{"key":31,"text":424,"correct":22},"主管生产经营的副经理",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":20,"analysis":33},1156695,"项目管理最基本的方法论是在项目实施过程中必须随着情况的变化项目目标的（ ）。",[429,431,433,435],{"key":20,"text":430,"correct":26},"动态控制",{"key":24,"text":432,"correct":22},"风险预测",{"key":28,"text":434,"correct":22},"分解落实",{"key":31,"text":436,"correct":22},"系统分析",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":28,"analysis":33},1156696,"下列措施中，不属于施工项目安全控制的措施的是（ ）。",[441,443,445,447],{"key":20,"text":442,"correct":22},"组织措施",{"key":24,"text":444,"correct":22},"技术措施",{"key":28,"text":446,"correct":26},"管理措施",{"key":31,"text":448,"correct":22},"制度措施",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":28,"analysis":33},1156697,"在对施工成本目标进行动态跟踪和控制时，成本的控制周期应视项目的规模和特点而定，一般工程项目成本控制的周期为（ ）。",[453,455,457,459],{"key":20,"text":454,"correct":22},"周",{"key":24,"text":456,"correct":22},"旬",{"key":28,"text":458,"correct":26},"月",{"key":31,"text":460,"correct":22},"季度",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":31,"analysis":33},1156698,"施工方案应由（ ）审批。",[465,467,468,470],{"key":20,"text":466,"correct":22},"总承包单位技术负责人",{"key":24,"text":294,"correct":22},{"key":28,"text":469,"correct":22},"施工单位技术负责人",{"key":31,"text":471,"correct":26},"项目部技术负责人",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":20,"analysis":33},1156699,"在施工过程中对施工进度目标进行动态跟踪和控制的工作包括：①收集施工进度实际值：②定期对施工进度的计划值和实际值进行比较：③如有偏差，采取措施进行纠偏。正确的工作流程是（ ）。",[476,478,480,482],{"key":20,"text":477,"correct":26},"①②③",{"key":24,"text":479,"correct":22},"②①③",{"key":28,"text":481,"correct":22},"②③①",{"key":31,"text":483,"correct":22},"③①②",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":20,"analysis":33},1156700,"下列各项中，不属于安全生产监督检查人员义务的是（ ）。",[488,490,492,494],{"key":20,"text":489,"correct":26},"对检查中发现的安全生产违法行为，当场予以纠正或者要求限期改正",{"key":24,"text":491,"correct":22},"执行监督检查任务时，必须出示有效的监督执法证件",{"key":28,"text":493,"correct":22},"对涉及被检查单位的技术秘密和业务秘密，应当为其保密",{"key":31,"text":495,"correct":22},"应当忠于职守，坚持原则，秉公执法",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":28,"analysis":33},1156701,"施工项目管理目标责任书的核心作用是（ ）。",[500,502,504,506],{"key":20,"text":501,"correct":22},"明确项目经理的职责",{"key":24,"text":503,"correct":22},"组建项目经理部",{"key":28,"text":505,"correct":26},"实现施工项目管理目标",{"key":31,"text":507,"correct":22},"明确项目管理中的奖惩机制",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":24,"analysis":33},1156702,"下列进度控制措施中，属于管理措施的是（ ）。",[512,514,516,518],{"key":20,"text":513,"correct":22},"编制工程资源需求计划",{"key":24,"text":515,"correct":26},"应用互联网进行进度控制",{"key":28,"text":517,"correct":22},"制订进度控制工作流程",{"key":31,"text":519,"correct":22},"选择先进的施工技术",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":31,"analysis":33},1156703,"根据《建设工程项目管理规范》GB\u002FT50326-2006，项目管理实施规划应由（ ）组织编制。",[524,525,527,529],{"key":20,"text":413,"correct":22},{"key":24,"text":526,"correct":22},"企业生产负责人",{"key":28,"text":528,"correct":22},"企业技术负责人",{"key":31,"text":294,"correct":26},{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":31,"analysis":33},1156704,"工程项目施工质量保证体系的质量目标要以（ ）为基本依据。",[534,536,538,540],{"key":20,"text":535,"correct":22},"质量记录",{"key":24,"text":537,"correct":22},"质量计划",{"key":28,"text":539,"correct":22},"招标投标文件",{"key":31,"text":541,"correct":26},"工程承包合同",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":24,"analysis":33},1156705,"某公司承揽了一个大型建设项目的项目管理任务。为了提高该项目组织的运行效率，决定减少项目组织结构层次，那么该项目宜选用的结构模式是（ ）。",[546,547,548,549],{"key":20,"text":396,"correct":22},{"key":24,"text":400,"correct":26},{"key":28,"text":402,"correct":22},{"key":31,"text":550,"correct":22},"项目组织结构",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":20,"analysis":33},1156706,"某高架桥工程，其中有三跨为普通钢筋混凝土连续梁，需现场浇筑，跨径组合为30m+40m+30m，桥宽18m，桥下净高9m。模板支架已经在总承包企业批准的施工组织设计中有详细的专项设计。项目经理为节约成本，就地取材，使用了附近工程的支架材料和结构形式，在浇筑主梁混凝土的过程中，承重杆件产生变形、失稳，导致支架坍塌，造成一入死亡、两入重伤的安全事故。问题： 发生安全事故后，应由（ ）在1h内上报工程所在地建设主管部门。",[555,557,559,561],{"key":20,"text":556,"correct":26},"企业负责人",{"key":24,"text":558,"correct":22},"项目负责人",{"key":28,"text":560,"correct":22},"施工员",{"key":31,"text":562,"correct":22},"安全员",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":28,"analysis":33},1156707,"单位工程施工组织设计应由（ ）审批。",[567,568,569,570],{"key":20,"text":466,"correct":22},{"key":24,"text":294,"correct":22},{"key":28,"text":469,"correct":26},{"key":31,"text":471,"correct":22},{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":20,"analysis":33},1156708,"在不影响总工期的条件下可以延误的最长时间是（ ）。",[575,577,579,581],{"key":20,"text":576,"correct":26},"总时差",{"key":24,"text":578,"correct":22},"自由时差",{"key":28,"text":580,"correct":22},"最晚开始时间",{"key":31,"text":582,"correct":22},"最晚结束时间",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":31,"analysis":33},1156709,"等节拍专业流水是指各个施工过程在各施工段上的流水节拍全部相等，并且等于（ ）的一种流水施工。",[587,589,591,593],{"key":20,"text":588,"correct":22},"流水节拍",{"key":24,"text":590,"correct":22},"持续时间",{"key":28,"text":592,"correct":22},"施工时间",{"key":31,"text":594,"correct":26},"流水步距",[596,599,602,605,608,611],{"id":15,"name":597,"category":7,"favorite":598},"领导干部任职前廉政法规知识测试题",92,{"id":600,"name":601,"category":7,"favorite":15},595,"建筑结构与设备",{"id":603,"name":604,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":606,"name":607,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":609,"name":610,"category":7,"favorite":8},534,"BIM工程师",{"id":612,"name":610,"category":7,"favorite":8},535]