[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-817-4":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":587},{"id":5,"name":6,"category":7,"favorite":8},817,"(标准员)基础知识","建筑工程",0,4,50,1283,[13,34,46,58,70,82,94,106,118,128,136,144,156,164,176,188,200,212,224,236,248,260,272,284,296,308,320,332,344,356,368,380,389,401,413,425,437,445,453,465,474,483,495,507,519,531,543,551,563,575],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1156609,1,"单选题","附加圈梁与圈梁的搭接长度不应小于（ ）",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","0.5m",false,{"key":24,"text":25,"correct":26},"B","1m",true,{"key":28,"text":29,"correct":22},"C","1.5m",{"key":31,"text":32,"correct":22},"D","2m","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1156610,"下列选项中，不属于按照构造方式划分的基础形式有（ ）",[38,40,42,44],{"key":20,"text":39,"correct":26},"无筋扩展基础",{"key":24,"text":41,"correct":22},"独立基础",{"key":28,"text":43,"correct":22},"条形基础",{"key":31,"text":45,"correct":22},"筏形基础",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1156611,"下列选项中，不属于墙的构造要求的是（ ）",[50,52,54,56],{"key":20,"text":51,"correct":22},"足够的承载力",{"key":24,"text":53,"correct":22},"稳定性",{"key":28,"text":55,"correct":22},"保温",{"key":31,"text":57,"correct":26},"防潮",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1156612,"适合于比较小型的楼梯或对抗震设防要求较高的建筑中的是（ ）",[62,64,66,68],{"key":20,"text":63,"correct":26},"现浇钢筋混凝土楼梯",{"key":24,"text":65,"correct":22},"钢楼梯",{"key":28,"text":67,"correct":22},"木楼梯",{"key":31,"text":69,"correct":22},"单跑楼梯",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},1156613,"当房间平面形状近似正方形，跨度在10m以内时，常采用（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"板式楼板",{"key":24,"text":77,"correct":22},"梁板式楼板",{"key":28,"text":79,"correct":26},"井字形密肋楼板",{"key":31,"text":81,"correct":22},"无梁楼板",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},1156614,"设计使用年限不少于50年时，非腐蚀环境中预制桩的混凝土强度等级不应低于（ ）",[86,88,90,92],{"key":20,"text":87,"correct":22},"C20",{"key":24,"text":89,"correct":22},"C25",{"key":28,"text":91,"correct":26},"C30",{"key":31,"text":93,"correct":22},"C35",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1156615,"一般情况下，市政排水管道采用（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":26},"混凝土管",{"key":24,"text":101,"correct":22},"陶土管",{"key":28,"text":103,"correct":22},"金属管",{"key":31,"text":105,"correct":22},"新型管材",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1156616,"（ ）是当前普遍采用的一种基础形式，它具有施工速度快，土方量小、适应性强等优点。",[110,112,114,116],{"key":20,"text":111,"correct":26},"桩基础",{"key":24,"text":113,"correct":22},"三合土基础",{"key":28,"text":115,"correct":22},"灰土基础",{"key":31,"text":117,"correct":22},"混凝土基础",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1156617,"下列选项中，不属于无筋扩展基础的是（ ）。",[122,124,125,126],{"key":20,"text":123,"correct":22},"砖基础",{"key":24,"text":111,"correct":26},{"key":28,"text":115,"correct":22},{"key":31,"text":127,"correct":22},"毛石基础",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":24,"analysis":33},1156618,"灌注桩的混凝土强度等级不应低于（ ）",[132,133,134,135],{"key":20,"text":87,"correct":22},{"key":24,"text":89,"correct":26},{"key":28,"text":91,"correct":22},{"key":31,"text":93,"correct":22},{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":28,"analysis":33},1156619,"当房间平面形状近似正方形，跨度在10m以内时，常采用（ ）",[140,141,142,143],{"key":20,"text":75,"correct":22},{"key":24,"text":77,"correct":22},{"key":28,"text":79,"correct":26},{"key":31,"text":81,"correct":22},{"id":145,"libraryId":5,"type":15,"typeLabel":16,"stem":146,"options":147,"answer":28,"analysis":33},1156620,"为杜绝地下潮气对墙身的影响，砌体墙应该在（ ）处设置防潮层。",[148,150,152,154],{"key":20,"text":149,"correct":22},"室内地坪",{"key":24,"text":151,"correct":22},"室外地面",{"key":28,"text":153,"correct":26},"勒脚",{"key":31,"text":155,"correct":22},"散水",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":20,"analysis":33},1156621,"下列无筋基础中，抗压强度高而抗拉、抗剪强度低的是（ ）。",[160,161,162,163],{"key":20,"text":123,"correct":26},{"key":24,"text":113,"correct":22},{"key":28,"text":115,"correct":22},{"key":31,"text":117,"correct":22},{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":24,"analysis":33},1156622,"砌体墙防潮层主要的构造做法不包括（ ）",[168,170,172,174],{"key":20,"text":169,"correct":22},"卷材防潮层",{"key":24,"text":171,"correct":26},"石膏防潮层",{"key":28,"text":173,"correct":22},"砂浆防潮层",{"key":31,"text":175,"correct":22},"细石混凝土防潮层",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":28,"analysis":33},1156623,"砌块及料石砌体结构房屋，檐口标高为（ ）m时，应在檐口标高处设置圈梁一道。",[180,182,184,186],{"key":20,"text":181,"correct":22},"2～3",{"key":24,"text":183,"correct":22},"3～4",{"key":28,"text":185,"correct":26},"4～5",{"key":31,"text":187,"correct":22},"5～8",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":24,"analysis":33},1156624,"水泥砂浆面层的厚度应符合设计要求，且不应小于（ ）",[192,194,196,198],{"key":20,"text":193,"correct":22},"10mm",{"key":24,"text":195,"correct":26},"20mm",{"key":28,"text":197,"correct":22},"30mm",{"key":31,"text":199,"correct":22},"40mm",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":31,"analysis":33},1156625,"下列关于桩和桩基的构造的说法中错误的是（ ）。",[204,206,208,210],{"key":20,"text":205,"correct":22},"扩底灌注桩的中心距不宜小于扩底直径的1.5倍",{"key":24,"text":207,"correct":22},"扩底灌注桩的扩底直径，不应大于桩身直径的3倍",{"key":28,"text":209,"correct":22},"在确定桩底进入持力层深度时用考虑特殊土的影响",{"key":31,"text":211,"correct":26},"水下灌注混凝土的桩身混凝土强度等级不宜高于C30",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":20,"analysis":33},1156626,"某工程位于地震区，抗震设防烈度为8度，I类场地土，是丙类建筑。该工程为框架结构，采用预应力混凝土平板楼盖，其余采用普通混凝土。设计使用年限为50年，为三类环境。 其抗震构造措施应按（ ）要求处理。",[216,218,220,222],{"key":20,"text":217,"correct":26},"8度",{"key":24,"text":219,"correct":22},"7度",{"key":28,"text":221,"correct":22},"6度",{"key":31,"text":223,"correct":22},"5度",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":20,"analysis":33},1156627,"下列关于防水砂浆防水层施工的说法中，正确的是（ ）。",[228,230,232,234],{"key":20,"text":229,"correct":26},"砂浆防水工程是利用一定配合比的水泥浆和水泥砂浆（称防水砂浆）分层分次施工，相互交替抹压密实的封闭防水整体",{"key":24,"text":231,"correct":22},"防水砂浆防水层的背水面基层的防水层采用五层做法，迎水面基层的防水层采用四层做法",{"key":28,"text":233,"correct":22},"防水层每层应连续施工，素灰层与砂浆层可不在同一天施工完毕",{"key":31,"text":235,"correct":22},"揉浆是使水泥砂浆素灰相互渗透结合牢固，既保护素灰层又起到防水作用，当揉浆难时，允许加水稀释",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":28,"analysis":33},1156628,"基坑（槽）采用井点降水，水位应降至基坑（槽）底以下（ ）mm，以利于土方开挖。",[240,242,244,246],{"key":20,"text":241,"correct":22},"100",{"key":24,"text":243,"correct":22},"300",{"key":28,"text":245,"correct":26},"500",{"key":31,"text":247,"correct":22},"700",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":31,"analysis":33},1156629,"下列各项中，关于混凝土拌合料运输过程中一般要求，错误的说法是（ ）。",[252,254,256,258],{"key":20,"text":253,"correct":22},"保持其均匀性，不离析、不漏浆",{"key":24,"text":255,"correct":22},"保证混凝土能连续浇筑",{"key":28,"text":257,"correct":22},"运到浇筑地点时应具有设计配合比所规定的坍落度",{"key":31,"text":259,"correct":26},"应在混凝土终凝前浇入模板并捣实完毕",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":20,"analysis":33},1156630,"在灰土垫层的入工地基处理方法中，灰土是指（ ）与素土按一定比例组合而成。",[264,266,268,270],{"key":20,"text":265,"correct":26},"消石灰",{"key":24,"text":267,"correct":22},"熟石灰",{"key":28,"text":269,"correct":22},"石膏",{"key":31,"text":271,"correct":22},"粉煤灰",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":24,"analysis":33},1156631,"下列关于钢筋混凝土扩展基础混凝土浇筑的基本规定，错误的是（ ）。",[276,278,280,282],{"key":20,"text":277,"correct":22},"混凝土宜分段分层浇筑，每层厚度不超过500mm",{"key":24,"text":279,"correct":26},"混凝土自高处倾落时，自由倾落高度不宜超过2m，如高度超过2m，应设料斗、漏斗、串筒、斜槽、溜管，以防止混凝土产生分层离析",{"key":28,"text":281,"correct":22},"各层各段间应相互衔接，每段长2~3m，使逐段逐层呈阶梯形推进",{"key":31,"text":283,"correct":22},"混凝土应连续浇筑，以保证结构良好的整体性",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":31,"analysis":33},1156632,"施工过程标准实施中包括负责跟踪。、验证施工过程标准执行情况，纠正执行标准中的偏差，重大提交（ ）。",[288,290,292,294],{"key":20,"text":289,"correct":22},"国务院",{"key":24,"text":291,"correct":22},"国家标准化委员会",{"key":28,"text":293,"correct":22},"省（市）标准化委员会",{"key":31,"text":295,"correct":26},"企业标准化委员会",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":31,"analysis":33},1156633,"下列关于卷材防水施工的说法中，有误的是（ ）。",[300,302,304,306],{"key":20,"text":301,"correct":22},"铺设防水卷材前应涂刷基层处理剂，基层处理剂应采用与卷材性能配套（相容）的材料，或采用同类涂料的底子油",{"key":24,"text":303,"correct":22},"铺贴高分子防水卷材时，切忌拉伸过紧，以免使卷材长期处在受拉应力状态，易加速卷材老化",{"key":28,"text":305,"correct":22},"施工工艺流程为：找平层施工→防水层施工→保护层施工→质量检查",{"key":31,"text":307,"correct":26},"卷材搭接接缝口应采用宽度不小于20mm的密封材料封严，以确保防水层的整体防水性能",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":28,"analysis":33},1156634,"（ ）适用于处理地下水位以上、天然含水量12％~25％、厚度5~15mm的素填土、杂填土、湿陷性黄土以及含水率较大的软弱地基等。",[312,314,316,318],{"key":20,"text":313,"correct":22},"换土垫层法",{"key":24,"text":315,"correct":22},"重锤夯实法",{"key":28,"text":317,"correct":26},"灰土挤密桩",{"key":31,"text":319,"correct":22},"深层密实法",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":31,"analysis":33},1156635,"浇筑竖向结构混凝土前，应先在底部浇筑一层水泥砂浆，对砂浆的要求是（ ）。",[324,326,328,330],{"key":20,"text":325,"correct":22},"与混凝土内砂浆成分相同且强度高一级",{"key":24,"text":327,"correct":22},"与混冱土内砂浆成分不同且强度高一级",{"key":28,"text":329,"correct":22},"与混凝土内砂浆成分不同",{"key":31,"text":331,"correct":26},"与混凝土内砂浆成分相同",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":28,"analysis":33},1156636,"土方开挖至设计要求标高后，应立即进行垫层混凝土浇筑，以保护（ ）。",[336,338,340,342],{"key":20,"text":337,"correct":22},"基础",{"key":24,"text":339,"correct":22},"桩",{"key":28,"text":341,"correct":26},"地基",{"key":31,"text":343,"correct":22},"地下水",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":31,"analysis":33},1156637,"下列各项中，关于钢筋安装的基本规定，正确的说法是（ ）。",[348,350,352,354],{"key":20,"text":349,"correct":22},"钢筋绑扎用的22号钢丝只用于绑扎直径14mm以下的钢筋",{"key":24,"text":351,"correct":22},"基础底板采用双层钢筋网时，在上层钢筋网下面每隔1.5m放置一个钢筋撑教",{"key":28,"text":353,"correct":22},"基础钢筋绑扎的施工工艺流程为：清理垫层、画线→摆放下层钢筋，并固定绑扎→摆放钢筋撑脚（双层钢筋时）→绑扎柱墙预留钢筋→绑扎上层钢筋",{"key":31,"text":355,"correct":26},"控制混凝土保护层用的水泥砂浆垫块或塑料卡的厚度，应等于保护层厚度",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":31,"analysis":33},1156638,"下列各项中，关于钢筋连接的基本规定，错误的说法是（ ）。",[360,362,364,366],{"key":20,"text":361,"correct":22},"钢筋的连接可分为绑扎连接、焊接和机械连接三种",{"key":24,"text":363,"correct":22},"在任何情况下，纵向受拉钢筋绑扎搭接接头的搭设长度不应小于300mm，纵向受压钢筋的搭接长度不应小于200mm",{"key":28,"text":365,"correct":22},"钢筋机械连接有钢筋套筒挤压连接、钢筋锥螺纹套筒连接、钢筋镦粗直螺纹套筒连接、钢筋滚压直螺纹套筒连接",{"key":31,"text":367,"correct":26},"当受拉钢筋的直径d≥22mm及受压钢筋的直径d>25mm时，不宜采用绑扎搭接接头",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":28,"analysis":33},1156639,"下列关于钢结构安装施工要点的说法中，正确的是（ ）。",[372,374,376,378],{"key":20,"text":373,"correct":22},"钢构件拼装前应检查清除飞边、毛刺、焊接飞溅物，摩擦面应保持干燥、整洁，采取相应防护措施后，可在雨中作业",{"key":24,"text":375,"correct":22},"螺栓应能自由穿入孔内，不能自由穿入时，可采用气割扩孔",{"key":28,"text":377,"correct":26},"起吊事先将钢构件吊离地面50Cm左右，使钢构件中心对准安装位置中心",{"key":31,"text":379,"correct":22},"高强度螺栓可兼作安装螺栓",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":24,"analysis":33},1156640,"（ ）适用于处理较厚软土和冲填土地基，多用于处理机场跑道、水工结构、道路、路堤、码头、岸坡等工程地基，对于泥炭等有机质沉积地基则不适用。",[384,385,387,388],{"key":20,"text":313,"correct":22},{"key":24,"text":386,"correct":26},"预压法",{"key":28,"text":317,"correct":22},{"key":31,"text":319,"correct":22},{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":31,"analysis":33},1156641,"下列关于基坑支护的表述中，有误的是（ ）。",[393,395,397,399],{"key":20,"text":394,"correct":22},"钢板桩支护具有施工速度快，可重复使用的特点",{"key":24,"text":396,"correct":22},"工程开挖土方时，地下连续墙可用作支护结构，既挡土又挡水，地下连续墙还可同时用作建筑物的承重结构",{"key":28,"text":398,"correct":22},"深层搅拌水泥土桩墙，采用水泥作为固化剂",{"key":31,"text":400,"correct":26},"常用的钢板桩施工机械有自由落锤、气动锤、柴油锤、振动锤，使用较多的是柴油锤",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":24,"analysis":33},1156642,"施工缝一般应留在构件（ ）部位。",[405,407,409,411],{"key":20,"text":406,"correct":22},"受压最小",{"key":24,"text":408,"correct":26},"受剪最小",{"key":28,"text":410,"correct":22},"受弯最小",{"key":31,"text":412,"correct":22},"受扭最小",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":20,"analysis":33},1156643,"涂料防水施工中，下列保护层不适于在立面使用的是（ ）",[417,419,421,423],{"key":20,"text":418,"correct":26},"细石混凝土保护层",{"key":24,"text":420,"correct":22},"水泥砂浆保护层",{"key":28,"text":422,"correct":22},"泡沫塑料保护层",{"key":31,"text":424,"correct":22},"砖墙保护层",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":20,"analysis":33},1156644,"根据《建筑桩基技术规范》JGJ94-2008，预制桩混凝土设计强度达到（ ）及以上方可起吊。",[429,431,433,435],{"key":20,"text":430,"correct":26},"70％",{"key":24,"text":432,"correct":22},"80%",{"key":28,"text":434,"correct":22},"90%",{"key":31,"text":436,"correct":22},"100％",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":20,"analysis":33},1156645,"涂料防水施工中，下列保护层不适于在立面使用的是（ ）。",[441,442,443,444],{"key":20,"text":418,"correct":26},{"key":24,"text":420,"correct":22},{"key":28,"text":422,"correct":22},{"key":31,"text":424,"correct":22},{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":31,"analysis":33},1156646,"下列关于基坑支护的表述中，错误的是（ ）。",[449,450,451,452],{"key":20,"text":394,"correct":22},{"key":24,"text":396,"correct":22},{"key":28,"text":398,"correct":22},{"key":31,"text":400,"correct":26},{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":24,"analysis":33},1156647,"下列关于设备施工图的说法中，错误的是（ ）。",[457,459,461,463],{"key":20,"text":458,"correct":22},"建筑给水排水施工图应包含设计说明及主要材料设备表、给水排水平面图、给水排水系统图、给水排水系统原理图、详图",{"key":24,"text":460,"correct":26},"电气施工图应包括设计说明、主要材料设备表、电气系统图、电气平面图、电气立面示意图、详图",{"key":28,"text":462,"correct":22},"给水排水平面图中应突出管线和设备，即用粗线表示管线，’其余为细线",{"key":31,"text":464,"correct":22},"室内给水排水系统轴测图一般按正面斜等测的方式绘制",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":24,"analysis":33},1156648,"（ ）适用于处理高于地下水位0.8m以上稍湿的黏性土、砂土、湿陷性黄土、杂填土和分层填土地基的加固处理。",[469,470,471,473],{"key":20,"text":313,"correct":22},{"key":24,"text":315,"correct":26},{"key":28,"text":472,"correct":22},"挤密桩施工法",{"key":31,"text":319,"correct":22},{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":31,"analysis":33},1156649,"下列各项中，关于钢筋安装的基本规定正确的说法是（ ）。",[478,479,481,482],{"key":20,"text":349,"correct":22},{"key":24,"text":480,"correct":22},"基础底板采用双层钢筋网时，在上层钢筋网下面每隔1.5m放置一个钢筋撑脚",{"key":28,"text":353,"correct":22},{"key":31,"text":355,"correct":26},{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":24,"analysis":33},1156650,"根据《砌体结构工程施工质量验收规范》，砌筑毛石基础的第一皮石块应坐浆，并将大面（ ）。",[487,489,491,493],{"key":20,"text":488,"correct":22},"向上",{"key":24,"text":490,"correct":26},"向下",{"key":28,"text":492,"correct":22},"向内",{"key":31,"text":494,"correct":22},"向外",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":28,"analysis":33},1156651,"高强度螺栓的拧紧问题说法错误的是（ ）。",[499,501,503,505],{"key":20,"text":500,"correct":22},"高强度螺栓连接的拧紧应分为初拧、终拧",{"key":24,"text":502,"correct":22},"对于大型节点应分为初拧、复拧、终拧",{"key":28,"text":504,"correct":26},"复拧扭矩应当大于初拧扭矩",{"key":31,"text":506,"correct":22},"扭剪型高强度螺栓拧紧时对螺母施加顺时针力矩",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":24,"analysis":33},1156652,"砖砌体的施工工艺过程正确的是（ ）。",[511,513,515,517],{"key":20,"text":512,"correct":22},"找平、放线、摆砖样、盘角、立皮数杆、砌筑、勾缝、清理、楼层标高控制、楼层轴线标引等",{"key":24,"text":514,"correct":26},"找平、放线、摆砖样、立皮数杆、盘角、砌筑、勾缝、清理、楼层轴线标引、楼层标高控制等",{"key":28,"text":516,"correct":22},"找平、放线、摆砖样、立皮数杆、砌筑、盘角、勾缝、清理、楼层轴线标引、楼层标高控制等",{"key":31,"text":518,"correct":22},"找平、放线、立皮数杆、摆砖样、盘角、挂线、砌筑、勾缝、清理、楼层标高控制、楼层轴线标引等",{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":24,"analysis":33},1156653,"下列关于基坑（槽）开挖施工工艺的说法中，正确的是（ ）。",[523,525,527,529],{"key":20,"text":524,"correct":22},"采用机械开挖基坑时，为避免破坏基底土，应在标高以上预留15~50Cm的土层由入工挖掘修整",{"key":24,"text":526,"correct":26},"在基坑（槽）四侧或两侧挖好临时排水沟和集水井，或采用井点降水，将水位降低至坑、槽底以下500mm，以利于土方开挖",{"key":28,"text":528,"correct":22},"雨期施工时，基坑（槽）需全段开挖，尽快完成",{"key":31,"text":530,"correct":22},"当基坑挖好后不能立即进行下道工序时，应预留30Cm的土不挖，待下道工序开始再挖至设计标高",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":28,"analysis":33},1156654,"某工地新进一批自粘聚酯胎改性沥青防水卷材，在进入建设工程被使用前必须进行检验验收。 防水卷材的验收主要分资料验收和（ ）两部分？",[535,537,539,541],{"key":20,"text":536,"correct":22},"重量验收",{"key":24,"text":538,"correct":22},"数量验收",{"key":28,"text":540,"correct":26},"实物质量验收",{"key":31,"text":542,"correct":22},"品种验收",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":31,"analysis":33},1156655,"下列各项中，关于混凝土拌合料运输过程中一般要求不正确的说法是（ ）。",[547,548,549,550],{"key":20,"text":253,"correct":22},{"key":24,"text":255,"correct":22},{"key":28,"text":257,"correct":22},{"key":31,"text":259,"correct":26},{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":24,"analysis":33},1156656,"砖基础施工工艺流程有①基坑开挖验槽、②测量放线、③砖基础砌筑、④混凝土垫层施工，其正确的流程是（ ）。",[555,557,559,561],{"key":20,"text":556,"correct":22},"①②④③",{"key":24,"text":558,"correct":26},"②①④③",{"key":28,"text":560,"correct":22},"②①③④",{"key":31,"text":562,"correct":22},"①②③④",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":28,"analysis":33},1156657,"下列各项中，关于常见模板的种类、特性的基本规定，错误的说法是（ ）。",[567,569,571,573],{"key":20,"text":568,"correct":22},"常见模板的种类有组合式模板、工具式模板两大类",{"key":24,"text":570,"correct":22},"爬升模板适用于现浇钢筋混凝土竖向（或倾斜）结构",{"key":28,"text":572,"correct":26},"飞模适用于小开间、小柱网、小进深的钢筋混凝土楼盖施工",{"key":31,"text":574,"correct":22},"组合式模板可事先按设计要求组拼成梁、柱、墙、楼板的大型模板。整体吊装就位，也可采用散支散拆方法",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":20,"analysis":33},1156658,"钢结构的连接方法不包括（ ）。",[579,581,583,585],{"key":20,"text":580,"correct":26},"绑扎连接",{"key":24,"text":582,"correct":22},"焊接",{"key":28,"text":584,"correct":22},"螺栓连接",{"key":31,"text":586,"correct":22},"铆钉连接",[588,591,594,597,600,603],{"id":15,"name":589,"category":7,"favorite":590},"领导干部任职前廉政法规知识测试题",92,{"id":592,"name":593,"category":7,"favorite":15},595,"建筑结构与设备",{"id":595,"name":596,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":598,"name":599,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":601,"name":602,"category":7,"favorite":8},534,"BIM工程师",{"id":604,"name":602,"category":7,"favorite":8},535]