[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-817-23":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":322},{"id":5,"name":6,"category":7,"favorite":8},817,"(标准员)基础知识","建筑工程",0,23,50,1283,[13,28,34,40,46,52,58,64,70,76,82,88,94,100,106,112,118,124,130,136,142,148,154,160,166,172,178,184,190,196,202,208,214,220,226,232,238,244,250,256,262,268,274,280,286,292,298,304,310,316],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":21,"analysis":27},1157564,3,"判断题","在处理地下工程与地上工程时，应遵循先地下后地上先深后浅的原则。",[19,23],{"key":20,"text":21,"correct":22},"A","正确",true,{"key":24,"text":25,"correct":26},"B","错误",false,"",{"id":29,"libraryId":5,"type":15,"typeLabel":16,"stem":30,"options":31,"answer":25,"analysis":27},1157565,"施工组织设计应申报项目总监理工程师签字确认后方可实施。",[32,33],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":25,"analysis":27},1157566,"施工组织设计均由施工总承包单位项目经理主持编制。",[38,39],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":41,"libraryId":5,"type":15,"typeLabel":16,"stem":42,"options":43,"answer":25,"analysis":27},1157567,"施工方案中不包括施工进度计划。",[44,45],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":21,"analysis":27},1157568,"远离企业管理层的大中型项目宜按直线式项目管理组织设置项目经理部。",[50,51],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":25,"analysis":27},1157569,"施工现场包括红线以内占用的建筑用地和施工用地以及临时施工用地。",[56,57],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":25,"analysis":27},1157570,"某施工项目为8000㎡的公共建筑工程施工，按照要求，须实行施工项目管理。",[62,63],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":25,"analysis":27},1157571,"单项工程施工组织设计是以分部分项工程或专项工程为主要对象编制的施工技术与组织方案。",[68,69],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":21,"analysis":27},1157572,"安全生产管理计划和实施的目标是最大限度地减少施工过程中事故损失。",[74,75],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":25,"analysis":27},1157573,"网络计划中，只有-条自始至终全部由关键工作组成的线路叫作关键线路。",[80,81],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":25,"analysis":27},1157574,"在安排架设电线、敷设管网、修建铁路和修筑公路的施工程序时，场外需要由远而近，先主干后分支。",[86,87],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":21,"analysis":27},1157575,"施工组织总设计应由总承包单位技术负责人审批。",[92,93],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":21,"analysis":27},1157576,"施工单位应当将施工现场的办公、生活区与作业区分开设置，并保持安全距离。",[98,99],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":21,"analysis":27},1157577,"中小型项目宜按职能式项目管理组织设置项目经理部。",[104,105],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":25,"analysis":27},1157578,"危险性较大的分部分项工程专项施工方案应由施工单位项目经理审核签字。",[110,111],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":21,"analysis":27},1157579,"施工前，工程施工组织设计必须召开专项技术交底会，并形成书面交底资料。",[116,117],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":21,"analysis":27},1157580,"成本考核是实现成本目标责任制的保证和实现决策目标的重要手段。",[122,123],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":21,"analysis":27},1157581,"施工企业在其经营生产的活动中必须对本企业的安全生产负全面责任。企业的代表入是安全生产的第一负责人，项目经理是施工项目生产的主要负责人。",[128,129],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":25,"analysis":27},1157582,"运用最广泛的传统的进度计划编制方法是双代号网路计划法。",[134,135],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":25,"analysis":27},1157583,"流水步距是指两相邻的作业队进入流水作业的最大时间间隔。",[140,141],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":21,"analysis":27},1157584,"一般情况下，主体结构工程施工在前，装饰工程施工在后。",[146,147],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":21,"analysis":27},1157585,"冬季施工混凝土受冻临界强度等技术参数是质量控制的重要指标。",[152,153],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":25,"analysis":27},1157586,"IS09000标准在结合施工行业管理特点的基础上又提出进一步要求。",[158,159],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":21,"analysis":27},1157587,"影响工程质量的因素归纳起来为：人、材料、机械、方法和环境。",[164,165],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":21,"analysis":27},1157588,"统一管理”是指国务院标准化行政主管部门统一管理全国的标准化工作。",[170,171],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":25,"analysis":27},1157589,"自控主体是指对他人质量能力和效果的监控者。",[176,177],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":25,"analysis":27},1157590,"混凝土强度试样应在混凝土搅拌站、运输过程或浇筑地点随机抽取。",[182,183],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":21,"analysis":27},1157591,"工程质量控制的内容是“采取的作业技术和活动”。",[188,189],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":25,"analysis":27},1157592,"ISO9000标准在结合施工行业管理特点的基础上又提出进一步要求。",[194,195],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":21,"analysis":27},1157593,"随机抽样是抽样中最基本也是最简单的组织形式。",[200,201],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":25,"analysis":27},1157594,"施工中的薄弱环节不能作为质量控制点。",[206,207],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":25,"analysis":27},1157595,"工程质量事故分为一般质量事故、严重质量事故和重大质量事故。",[212,213],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":21,"analysis":27},1157596,"直接经济损失在5000元及以上的称为工程质量事故。",[218,219],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":25,"analysis":27},1157597,"工程施工前，施工单位应编制检测计划，经建设单位审批后组织实施。",[224,225],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":25,"analysis":27},1157598,"隐蔽工程在隐蔽前应由施工单位通知监理工程师或建设单位专业技术负责人进行验收即可。",[230,231],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":25,"analysis":27},1157599,"抹灰工程中，有排水要求的部位应做滴水线（槽），滴水线（槽）应整齐顺直，滴水线应内低外高。",[236,237],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":25,"analysis":27},1157600,"组成总体的基本元素，称为样本。",[242,243],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":25,"analysis":27},1157601,"单位工程是分部工程的组成部分。",[248,249],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":21,"analysis":27},1157602,"分项工程是分部工程的组成部分，由一个或若干个检验批组成。",[254,255],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":21,"analysis":27},1157603,"IS09000质量管理标准的基本思想主要有：控制的思想和预防的思想。",[260,261],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":25,"analysis":27},1157604,"在屋面热粘法铺贴卷材施工，粘贴卷材的热熔型改性沥青胶结料厚度宜为2.0mm～3.0mm。",[266,267],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":21,"analysis":27},1157605,"普通抹灰一般由底层、中间层和面层组成的。",[272,273],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":21,"analysis":27},1157606,"冬期施工混凝土受冻临界强度等技术参数是质量控制的重要指标。",[278,279],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":21,"analysis":27},1157607,"施工单位负责施工现场检测工作的组织管理和实施。",[284,285],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":25,"analysis":27},1157608,"施工单位不可自行进行检测，只能委托检测机构进行检测。",[290,291],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":21,"analysis":27},1157609,"和易性好的砂浆不仅在运输和施工过程中不易产生分层、离析、泌水，而且能在粗糙的砖、石基面上铺成均匀的薄层，与基层保持良好的粘结，便于施工操作。",[296,297],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":21,"analysis":27},1157610,"胶凝材料也称为胶结材料，是用来把块状、颗粒状或纤维状材料粘结为整体的材料。",[302,303],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":21,"analysis":27},1157611,"装饰砂浆常用的工艺作法包括水刷石、水磨石、斩假石、拉毛等。",[308,309],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":21,"analysis":27},1157612,"M5及以下强度等级的砌筑砂浆宜选用32.5级通用硅酸盐水泥或砌筑水泥。",[314,315],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":25,"analysis":27},1157613,"石灰陈伏是为了充分释放石灰熟化时的放热量。",[320,321],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},[323,327,330,333,336,339],{"id":324,"name":325,"category":7,"favorite":326},1,"领导干部任职前廉政法规知识测试题",92,{"id":328,"name":329,"category":7,"favorite":324},595,"建筑结构与设备",{"id":331,"name":332,"category":7,"favorite":324},715,"招标采购专业知识与法律法规",{"id":334,"name":335,"category":7,"favorite":324},848,"市政方向-通用基础",{"id":337,"name":338,"category":7,"favorite":8},534,"BIM工程师",{"id":340,"name":338,"category":7,"favorite":8},535]