[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-817-22":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":322},{"id":5,"name":6,"category":7,"favorite":8},817,"(标准员)基础知识","建筑工程",0,22,50,1283,[13,28,34,40,46,52,58,64,70,76,82,88,94,100,106,112,118,124,130,136,142,148,154,160,166,172,178,184,190,196,202,208,214,220,226,232,238,244,250,256,262,268,274,280,286,292,298,304,310,316],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":21,"analysis":27},1157514,3,"判断题","自然养护是指利用平均气温高于5℃的自然条件，用保水材料或草帘等对混凝土加以覆盖后适当浇水，使混凝土在一定的时间内在湿润状态下硬化。",[19,23],{"key":20,"text":21,"correct":22},"A","正确",true,{"key":24,"text":25,"correct":26},"B","错误",false,"",{"id":29,"libraryId":5,"type":15,"typeLabel":16,"stem":30,"options":31,"answer":21,"analysis":27},1157515,"砖基础施工工艺流程是：测量放线→基坑开挖，验槽→混凝土垫层施工→砖基础砌筑。",[32,33],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":25,"analysis":27},1157516,"防水层每层应连续施工，素灰层与砂浆层允许不在同一天施工完毕。",[38,39],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":41,"libraryId":5,"type":15,"typeLabel":16,"stem":42,"options":43,"answer":25,"analysis":27},1157517,"柱钢筋绑扎的施工工艺流程为：调整插筋位置，套入箍筋-立柱子四个角的主筋--立柱内其余主筋-绑扎钢筋接头-将主骨架钢筋绑扎成形。",[44,45],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":25,"analysis":27},1157518,"当受拉钢筋的直径d>22mm及受压钢筋的直径d>25mm时，不宜采用绑扎搭接接头。",[50,51],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":25,"analysis":27},1157519,"基坑（槽）开挖施工工艺流程：测量放线→切线分层开挖→排水、降水→修坡→留足预留土层→整平。",[56,57],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":25,"analysis":27},1157520,"钢筋混凝土扩展基础施工工艺流程：测量放线→基坑开挖、验槽→混凝土垫层施工→支基础模板→钢筋绑扎→浇基础混凝土。",[62,63],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":25,"analysis":27},1157521,"在建筑施工中，土越坚硬，土的可松性系数就越小。",[68,69],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":21,"analysis":27},1157522,"坚石和特坚石的现场鉴别方法都可以是用爆破方法。",[74,75],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":25,"analysis":27},1157523,"静力压桩宜用于地下有较多孤石、障碍物或有4m以上硬质隔离层的地基。",[80,81],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":21,"analysis":27},1157524,"毛石砌体的施工工艺流程是：施工准备→试排撂底→砌筑毛石（同时搅拌砂浆）→勾缝→检验评定。",[86,87],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":21,"analysis":27},1157525,"常用的入工地基处理方法中，换土垫层法一般适应于地下水位较低的地基中。",[92,93],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":25,"analysis":27},1157526,"柱钢筋绑扎的施工工艺流程为：调整插筋位置，套入箍筋→立柱子四个角的主筋→立柱内其余主筋→绑扎钢筋接头→将主骨架钢筋绑扎成形。",[98,99],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":21,"analysis":27},1157527,"桩基础施工工艺流程是：测量放线→桩机就位、吊桩、插桩、桩身对中调直→静压沉桩→接桩→再静压沉桩→送桩，终止压桩→切割桩头。",[104,105],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":21,"analysis":27},1157528,"砖及砂浆的强度应符合设计要求：砂浆的稠度宜为70~100mm；砖的规格应一致，砖应提前浇水湿润。",[110,111],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":25,"analysis":27},1157529,"大体积混凝土可采用掺合料和外加剂改善混凝土和易性，减少水泥用量，提高水化执",[116,117],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":25,"analysis":27},1157530,"按成孔方法不同，混凝土灌注桩分为钻孔灌注桩、沉管灌注桩、入工挖孔灌注桩、静压桩。",[122,123],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":25,"analysis":27},1157531,"在建筑施工中，第七类土可用挖掘机开挖。",[128,129],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":25,"analysis":27},1157532,"施工方案是指导施工活动的全局性文件。",[134,135],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":25,"analysis":27},1157533,"选择施工机具和材料时，在同一个工地上施工机具的种类和型号应尽可能多。",[140,141],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":25,"analysis":27},1157534,"建筑业企业法定代表入与施工项目经理签订的《施工项目管理目标责任书》是项目经理部实施的合同依据。",[146,147],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":21,"analysis":27},1157535,"施工技术方案实施过程中，项目经理、项目技术负责人与技术方案师应随时到现场监督施工技术方案执行。",[152,153],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":21,"analysis":27},1157536,"成本预测是成本决策的前提，成本计划是成本决策所确定目标的具体化。",[158,159],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":21,"analysis":27},1157537,"建设工程项目施工成本控制应贯穿于项目从投标阶段开始直至竣工验收的全过",[164,165],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":25,"analysis":27},1157538,"施工项目的生产要素主要包括劳动力、材料、技术和资金。",[170,171],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":25,"analysis":27},1157539,"工种顺序要以空间顺序为基础。",[176,177],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":25,"analysis":27},1157540,"在地下防水工程，卷材防水层应铺设在混凝土结构的背水面。",[182,183],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":21,"analysis":27},1157541,"在现代施工企业的项目管理中，施工项目经理是施工项目的最高责任人和组织者，是决定施工项目盈亏的关键性角色。",[188,189],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":25,"analysis":27},1157542,"大型项目宜按直线式项目管理组织设置项目经理部。",[194,195],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":25,"analysis":27},1157543,"质量管理的全过程若反复按照PDCA的循环周而复始地运转，质量难以得到有效",[200,201],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":21,"analysis":27},1157544,"施工过程中专项施工技术方案出现重大变更，施工单位重新编制专项施工技术方案后仍需要遵循原审批手续，审核、审批后方可实施。",[206,207],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":25,"analysis":27},1157545,"危险性较大分部分项工程安全专项施工方案一般由总承包单位的技术负责人审批后实施。",[212,213],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":25,"analysis":27},1157546,"施工现场临时搭建的建筑物应当符合安全使用要求，施工单位可以在地下室内设置员工集体宿舍。",[218,219],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":25,"analysis":27},1157547,"施工组织总设计是以单位工程或不复杂的单项工程为主要对象编制的施工组织设计。",[224,225],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":21,"analysis":27},1157548,"时标网络计划的工作，以实箭线表示，自由时差以波形线表示。",[230,231],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":21,"analysis":27},1157549,"安全管理的对象是生产中一切人、物、环境、管理状态，安全管理是一种动态管理。",[236,237],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":21,"analysis":27},1157550,"流水施工的实质是连续作业和均衡施工。",[242,243],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":21,"analysis":27},1157551,"在工程开工前，由项目经理组织编制施工项目管理实施规划，对施工项目管理从开工到交工验收进行全面的指导性规划。",[248,249],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":21,"analysis":27},1157552,"以若干单位工程组成的群体工程或特大型项目为主要对象编制的施工组织设计是施工组织总设计。",[254,255],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":21,"analysis":27},1157553,"为保证房屋建筑各专业工程的安全性、可靠性、耐久性而提出的一般性要求，施工质量就必须满足法律法规及相应专业验收规范的规定。",[260,261],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":21,"analysis":27},1157554,"网络图有多条线路，其中最长的称之为关键线路。",[266,267],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":21,"analysis":27},1157555,"施工项目管理规划的内容应在施工组织设计的基础上进行扩展，不仅服务于施工和施工准备发展，而且服务于经营管理和施工管理。",[272,273],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":25,"analysis":27},1157556,"施工质量保证体系应以质量计划为主线，以质量验收为重心，按照PDCA循环的原理，通过PDCA循环展开控制。",[278,279],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":25,"analysis":27},1157557,"项目经理部是工程的主管部门，主要负责工程项目在保修期间问题的处理，包括因质量问题造成的返修、工程剩余价款的结算以及回收等。",[284,285],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":25,"analysis":27},1157558,"项目质量控制贯穿于项目施工的全过程。",[290,291],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":25,"analysis":27},1157559,"工程变更只能由发包入同意后提出，承包人只能提出变更建议。",[296,297],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":21,"analysis":27},1157560,"在项目经理部内部的沟通中，项目经理起着核心作用。",[302,303],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":25,"analysis":27},1157561,"自由时差是指在不影响紧后工作最迟开始和有关时限的前提下，一项工作可以利用的机动时间。",[308,309],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":25,"analysis":27},1157562,"横道图主要用于大型或特大型项目进度计划的编制。",[314,315],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":25,"analysis":27},1157563,"施工项目是建筑业企业自工程施工准备开始到保修期满为止的全过程中完成的项目。",[320,321],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},[323,327,330,333,336,339],{"id":324,"name":325,"category":7,"favorite":326},1,"领导干部任职前廉政法规知识测试题",92,{"id":328,"name":329,"category":7,"favorite":324},595,"建筑结构与设备",{"id":331,"name":332,"category":7,"favorite":324},715,"招标采购专业知识与法律法规",{"id":334,"name":335,"category":7,"favorite":324},848,"市政方向-通用基础",{"id":337,"name":338,"category":7,"favorite":8},534,"BIM工程师",{"id":340,"name":338,"category":7,"favorite":8},535]