[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-817-16":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":726},{"id":5,"name":6,"category":7,"favorite":8},817,"(标准员)基础知识","建筑工程",0,16,50,1283,[13,38,53,68,83,98,113,127,142,156,171,186,200,215,230,245,259,274,288,301,315,330,345,359,373,388,402,416,431,445,459,474,489,503,517,531,541,552,566,580,594,608,622,636,650,660,674,688,698,713],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1157213,2,"多选题","常用的入工地基处理方法有（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","爆破法",false,{"key":24,"text":25,"correct":26},"B","换土垫层法",true,{"key":28,"text":29,"correct":26},"C","砂桩挤密法",{"key":31,"text":32,"correct":26},"D","深层搅拌法",{"key":34,"text":35,"correct":26},"E","化学加固法","BCDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1157214,"下列关于柱钢筋和板钢筋绑扎的施工工艺的规定中正确的是（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"柱钢筋绑扎中箍筋的接头应交错布置在四角纵向钢筋上，箍筋转角与纵向钢筋交叉点均应扎牢",{"key":24,"text":45,"correct":22},"板钢筋绑扎中板、次梁与主梁交叉处，板的钢筋在上，次梁的钢筋居中。主梁的钢筋一直在下侧",{"key":28,"text":47,"correct":26},"板钢筋绑扎的施工工艺流程为：清理垫层、划线→摆放下层钢筋，并固定绑扎→摆放钢筋撑脚（双层钢筋时）→安装管线→绑扎上层钢筋",{"key":31,"text":49,"correct":26},"对于双向受力板，应先铺设平行于短边方向的受力钢筋，后铺设平行于长边方向的受力钢筋",{"key":34,"text":51,"correct":22},"板上部的负筋、主筋与分布钢筋的交叉点应相隔交错扎牢，并垫上保护层垫块","ACD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1157215,"安全警示标志一般由（ ）构成。",[57,59,61,63,65],{"key":20,"text":58,"correct":26},"安全色",{"key":24,"text":60,"correct":26},"几何图形",{"key":28,"text":62,"correct":22},"规章制度",{"key":31,"text":64,"correct":26},"图形符号",{"key":34,"text":66,"correct":22},"灯光","ABD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1157216,"合同实施偏差分析的内容包括（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":26},"产生偏差的原因分析",{"key":24,"text":75,"correct":26},"合同实施偏差的责任分析",{"key":28,"text":77,"correct":26},"合同实施趋势分析",{"key":31,"text":79,"correct":22},"项目承包利润分析",{"key":34,"text":81,"correct":22},"进度偏差分析","ABC",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1157217,"施工组织设计编制的基本原则包括（ ）",[87,89,91,93,95],{"key":20,"text":88,"correct":26},"符合施工合同有关工程进度等方面的要求",{"key":24,"text":90,"correct":22},"应从施工全局出发",{"key":28,"text":92,"correct":26},"结合工程特点推广应用新技术、新工艺、新材料、新设备",{"key":31,"text":94,"correct":26},"推广绿色施工技术，实现节能、节地、节水、节材和环境保护",{"key":34,"text":96,"correct":26},"优化施工方案，达到合理的经济技术指标","ACDE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},1157218,"以下各项中不属于施工资源管理的任务的是（ ）。",[102,104,106,108,110],{"key":20,"text":103,"correct":26},"规划及报批施工用地",{"key":24,"text":105,"correct":22},"确定资源类型及数量",{"key":28,"text":107,"correct":22},"确定资源的分配计划",{"key":31,"text":109,"correct":26},"建立施工现场管理组织",{"key":34,"text":111,"correct":22},"施工资源进度计划的执行和动态调整","AD",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":82,"analysis":37},1157219,"施工成本分析的依据有（ ）。",[117,119,121,123,125],{"key":20,"text":118,"correct":26},"会计核算",{"key":24,"text":120,"correct":26},"业务核算",{"key":28,"text":122,"correct":26},"统计核算",{"key":31,"text":124,"correct":22},"成本核算",{"key":34,"text":126,"correct":22},"单项核算",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":141,"analysis":37},1157220,"属于消防器材的有（ ）。",[131,133,135,137,139],{"key":20,"text":132,"correct":22},"火灾自动报警系统",{"key":24,"text":134,"correct":26},"防烟面罩",{"key":28,"text":136,"correct":22},"消火栓",{"key":31,"text":138,"correct":26},"灭火器",{"key":34,"text":140,"correct":22},"防火门","BD",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":141,"analysis":37},1157221,"下列各项中，不属于施工项目管理的内容的是（ ）。",[146,148,150,152,154],{"key":20,"text":147,"correct":22},"建立施工项目管理组织",{"key":24,"text":149,"correct":26},"编制《施工项目管理目标责任书》",{"key":28,"text":151,"correct":22},"施工项目的生产要素管理",{"key":31,"text":153,"correct":26},"施工项目的施工情况的评估",{"key":34,"text":155,"correct":22},"施工项目的信息管理",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":170,"analysis":37},1157222,"下列各部门中，不属于项目经理部可设置的是（ ）。",[160,162,164,166,168],{"key":20,"text":161,"correct":22},"经营核算部门",{"key":24,"text":163,"correct":22},"物质设备供应部门",{"key":28,"text":165,"correct":26},"设备检查检测部门",{"key":31,"text":167,"correct":22},"测试计量部门",{"key":34,"text":169,"correct":26},"企业工程管理部门","CE",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":185,"analysis":37},1157223,"以下各项中属于施工现场管理的内容的是（ ）。",[175,177,179,181,183],{"key":20,"text":176,"correct":22},"落实资源进度计划",{"key":24,"text":178,"correct":26},"设计施工现场平面图",{"key":28,"text":180,"correct":26},"建立文明施工现场",{"key":31,"text":182,"correct":22},"施工资源进度计划的动态调整",{"key":34,"text":184,"correct":26},"及时清场转移","BCE",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":97,"analysis":37},1157224,"在施工现场入口处设置明显消防安全标志主要有（ ）。",[190,192,194,196,198],{"key":20,"text":191,"correct":26},"灭火设备标志",{"key":24,"text":193,"correct":22},"当心触电警戒标志",{"key":28,"text":195,"correct":26},"疏散途径标志",{"key":31,"text":197,"correct":26},"火灾报警",{"key":34,"text":199,"correct":26},"易燃易爆危险物质标志",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":214,"analysis":37},1157225,"下列各项工程中，需要编制施工组织总设计的有（ ）。",[204,206,208,210,212],{"key":20,"text":205,"correct":26},"某房地产公司开发的别墅小区",{"key":24,"text":207,"correct":26},"某市新建机场工程",{"key":28,"text":209,"correct":22},"一座新建跳水馆钢屋架工程",{"key":31,"text":211,"correct":22},"某定向爆破工程",{"key":34,"text":213,"correct":22},"某事标志性超高层建筑结构工程","AB",{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":229,"analysis":37},1157226,"项目管理部设置的前提和依据是（ ）。",[219,221,223,225,227],{"key":20,"text":220,"correct":26},"确定组织形式",{"key":24,"text":222,"correct":22},"编制施工组织设计",{"key":28,"text":224,"correct":26},"确定项目管理的任务",{"key":31,"text":226,"correct":22},"编制投标文件",{"key":34,"text":228,"correct":22},"确定生产要素计划","AC",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":244,"analysis":37},1157227,"下列施工现场质量检查，属于实测法检查的有（ ）。",[234,236,238,240,242],{"key":20,"text":235,"correct":22},"肉眼观察墙面喷涂的密实度",{"key":24,"text":237,"correct":22},"用敲击工具检查地面砖铺贴的密实度",{"key":28,"text":239,"correct":26},"用直尺检查地面的平整度",{"key":31,"text":241,"correct":26},"用线锤吊线检查墙面的垂直度",{"key":34,"text":243,"correct":22},"现场检测混凝土试件的抗压强度","CD",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":82,"analysis":37},1157228,"工程变更包含（ ）。",[249,251,253,255,257],{"key":20,"text":250,"correct":26},"设计变更",{"key":24,"text":252,"correct":26},"发包入提出的变更",{"key":28,"text":254,"correct":26},"监理工程师提出的变更",{"key":31,"text":256,"correct":22},"承包人提出的变更",{"key":34,"text":258,"correct":22},"政府监督机构要求",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":273,"analysis":37},1157229,"下列选项中，属于项目部设置的最基本的岗位的是（ ）。",[263,265,267,269,271],{"key":20,"text":264,"correct":26},"施工员",{"key":24,"text":266,"correct":26},"安全员",{"key":28,"text":268,"correct":22},"机械员",{"key":31,"text":270,"correct":22},"劳务员",{"key":34,"text":272,"correct":26},"测量员","ABE",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":67,"analysis":37},1157230,"根据施工组织设计编制的广度、深度和作用的不同，可分为（ ）。",[278,280,282,284,286],{"key":20,"text":279,"correct":26},"施工组织总设计",{"key":24,"text":281,"correct":26},"单位工程施工组织设计",{"key":28,"text":283,"correct":22},"标前施工组织设计",{"key":31,"text":285,"correct":26},"分部（分项）工程施工组织设计",{"key":34,"text":287,"correct":22},"标后施工组织设计",{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":300,"analysis":37},1157231,"根据施工组织设计编制的设计阶段的不同，可以将施工组织设计分为（ ）。",[292,293,294,296,298],{"key":20,"text":279,"correct":22},{"key":24,"text":281,"correct":22},{"key":28,"text":295,"correct":22},"单项工程施工组织设计",{"key":31,"text":297,"correct":26},"投标前施工组织设计",{"key":34,"text":299,"correct":26},"中标后施工组织设计","DE",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":185,"analysis":37},1157232,"建设工程施工安全控制的具体目标包括（ ）。",[305,307,309,311,313],{"key":20,"text":306,"correct":22},"提高员工安全生产意识",{"key":24,"text":308,"correct":26},"改善生产环境和保护自然环境",{"key":28,"text":310,"correct":26},"减少或消除入的不安全行为",{"key":31,"text":312,"correct":22},"安全事故整改",{"key":34,"text":314,"correct":26},"减少或消除设备、材料的不安全状态",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":329,"analysis":37},1157233,"施工项目管理程序中需要经历（ ）阶段。",[319,321,323,325,327],{"key":20,"text":320,"correct":26},"投标及签订合同",{"key":24,"text":322,"correct":26},"施工准备",{"key":28,"text":324,"correct":26},"施工",{"key":31,"text":326,"correct":26},"竣工验收",{"key":34,"text":328,"correct":22},"使用中改造","ABCD",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":344,"analysis":37},1157234,"与传统的横道图计划相比，网络计划的优点主要表现在（ ）。",[334,336,338,340,342],{"key":20,"text":335,"correct":26},"网络计划能够表示施工过程中各个环节之间互相依赖、互相制约的关系",{"key":24,"text":337,"correct":26},"可以分辨出对全局具有决定性影响的工作",{"key":28,"text":339,"correct":26},"可以从计划总工期的角度来计算各工序的时间参数",{"key":31,"text":341,"correct":26},"网络计划可以使用计算机进行计算",{"key":34,"text":343,"correct":26},"使得在组织实施计划时，能够分清主次，把有限的入力、物力首先用来保证这些关键工作的完成","ABCDE",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":185,"analysis":37},1157235,"在建设项目的组织系统中，常用的组织结构模式有（ ）。",[349,351,353,355,357],{"key":20,"text":350,"correct":22},"项目结构",{"key":24,"text":352,"correct":26},"矩阵组织结构",{"key":28,"text":354,"correct":26},"线性组织结构",{"key":31,"text":356,"correct":22},"项目合同结构",{"key":34,"text":358,"correct":26},"职能组织结构",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":214,"analysis":37},1157236,"运用动态控制原理控制施工进度时，一般的项目控制的周期为一个月，对于重要的项目，控制周期可定为（ ）。",[363,365,367,369,371],{"key":20,"text":364,"correct":26},"一周",{"key":24,"text":366,"correct":26},"一旬",{"key":28,"text":368,"correct":22},"一季",{"key":31,"text":370,"correct":22},"一年",{"key":34,"text":372,"correct":22},"一个项目期",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":387,"analysis":37},1157237,"某大型建设工程项目的组织系统采用了矩阵组织结构模式，为避免纵向和横向工作部门指令相互矛盾所产生不利的影响，减轻项目经理的协调工作量，该组织系统可以在纵向与横向部门指令发生矛盾时，可以采用的方式有（ ）。",[377,379,381,383,385],{"key":20,"text":378,"correct":26},"以横向指令为主",{"key":24,"text":380,"correct":22},"让两类部门自己解决矛盾",{"key":28,"text":382,"correct":22},"由工作人员自己解决",{"key":31,"text":384,"correct":26},"以纵向指令为主",{"key":34,"text":386,"correct":26},"由最高管理人员亲自管理","ADE",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":329,"analysis":37},1157238,"建筑施工现场管理的任务主要有（ ）。",[392,394,396,398,400],{"key":20,"text":393,"correct":26},"优化生产要素的配置",{"key":24,"text":395,"correct":26},"加强定额管理",{"key":28,"text":397,"correct":26},"加强施工现场的标准化管理",{"key":31,"text":399,"correct":26},"治理施工现场环境",{"key":34,"text":401,"correct":22},"提前竣工交付使用",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":36,"analysis":37},1157239,"签订合同后，在施工准备阶段必须编制详细的施工组织设计，其主要依据有（ ）。",[406,408,410,412,414],{"key":20,"text":407,"correct":22},"招标文件和工程量清单",{"key":24,"text":409,"correct":26},"项目施工质量目标",{"key":28,"text":411,"correct":26},"项目施工质量计划",{"key":31,"text":413,"correct":26},"项目施工程序文件",{"key":34,"text":415,"correct":26},"思想、组织、工作保证体系",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":430,"analysis":37},1157240,"施工项目技术管理的任务有（ ）。",[420,422,424,426,428],{"key":20,"text":421,"correct":26},"正确贯彻国家和行政主管部门的技术政策，贯彻上级对技术工作的指示与决定",{"key":24,"text":423,"correct":26},"研究、认识和利用技术规律，科学地组织各项技术工作，充分发挥技术的作用",{"key":28,"text":425,"correct":22},"加强思想政治工作和利用行为科学，从劳动力个入的需要与行为的关系的观点出发，进行恰当的激励",{"key":31,"text":427,"correct":26},"确立正常的生产技术秩序，进行文明施工，以技术保证工程质量",{"key":34,"text":429,"correct":26},"努力提高技术工作的经济效果，使技术与经济有机地结合","ABDE",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":170,"analysis":37},1157241,"建设工程施工招标种类有（ ）。",[435,437,439,441,443],{"key":20,"text":436,"correct":22},"直接签订合同",{"key":24,"text":438,"correct":22},"询价采购",{"key":28,"text":440,"correct":26},"公开招标",{"key":31,"text":442,"correct":22},"议标",{"key":34,"text":444,"correct":26},"邀请招标",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":52,"analysis":37},1157242,"在全面实施建造师执业资格制度后仍然要坚持落实项目经理岗位责任制，项目经理岗位是保证工程项目建设（ ）的重要岗位。",[449,451,453,455,457],{"key":20,"text":450,"correct":26},"质量",{"key":24,"text":452,"correct":22},"投资",{"key":28,"text":454,"correct":26},"安全",{"key":31,"text":456,"correct":26},"工期",{"key":34,"text":458,"correct":22},"效益",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":473,"analysis":37},1157243,"施工项目管理受到（ ）条件的制约和限制。",[463,465,467,469,471],{"key":20,"text":464,"correct":22},"主管部门领导要求",{"key":24,"text":466,"correct":26},"限定的资源消耗",{"key":28,"text":468,"correct":22},"建设单位法定代表入调整",{"key":31,"text":470,"correct":26},"限定的时间",{"key":34,"text":472,"correct":26},"限定的质量标准","BDE",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":488,"analysis":37},1157244,"施工项目的生产要素主要有（ ）。",[478,480,482,484,486],{"key":20,"text":479,"correct":22},"组织",{"key":24,"text":481,"correct":22},"计划",{"key":28,"text":483,"correct":26},"入材机",{"key":31,"text":485,"correct":26},"资金",{"key":34,"text":487,"correct":26},"技术","CDE",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":82,"analysis":37},1157245,"施工方进度控制的措施主要包括（ ）。",[493,495,497,499,501],{"key":20,"text":494,"correct":26},"组织措施",{"key":24,"text":496,"correct":26},"技术措施",{"key":28,"text":498,"correct":26},"经济措施",{"key":31,"text":500,"correct":22},"法律措施",{"key":34,"text":502,"correct":22},"行政措施",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":430,"analysis":37},1157246,"施工机具和材料的选择主要考虑的因素有（ ）",[507,509,511,513,515],{"key":20,"text":508,"correct":26},"应尽量选用施工单位现有机具",{"key":24,"text":510,"correct":26},"机具类型应符合施工现场的条件",{"key":28,"text":512,"correct":22},"在同一个工地上施工机具的种类和型号应尽可能多",{"key":31,"text":514,"correct":26},"考虑所选机械的运行成本是否经济",{"key":34,"text":516,"correct":26},"施工机具的合理组织",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":52,"analysis":37},1157247,"各种施工合同示范文本一般都由（ ）部分组成。",[521,523,525,527,529],{"key":20,"text":522,"correct":26},"协议书",{"key":24,"text":524,"correct":22},"工程量清单",{"key":28,"text":526,"correct":26},"通用条款",{"key":31,"text":528,"correct":26},"专用条款",{"key":34,"text":530,"correct":22},"工程报价单或预算书",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":540,"analysis":37},1157248,"属于消防设施的有（ ）。",[535,536,537,538,539],{"key":20,"text":132,"correct":26},{"key":24,"text":134,"correct":22},{"key":28,"text":136,"correct":26},{"key":31,"text":138,"correct":22},{"key":34,"text":140,"correct":26},"ACE",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":329,"analysis":37},1157249,"某建设工程项目的承包商为了实现项目目标，制订了一系列控制项目目标的主要措施，这些措施的类型有（ ）。",[545,547,548,549,550],{"key":20,"text":546,"correct":26},"管理措施",{"key":24,"text":496,"correct":26},{"key":28,"text":494,"correct":26},{"key":31,"text":498,"correct":26},{"key":34,"text":551,"correct":22},"结构措施",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":329,"analysis":37},1157250,"编制项目管理目标责任书依据是（ ）。",[556,558,560,562,564],{"key":20,"text":557,"correct":26},"项目合同文件",{"key":24,"text":559,"correct":26},"组织管理制度",{"key":28,"text":561,"correct":26},"项目管理规划大纲",{"key":31,"text":563,"correct":26},"组织的经营方针和目标",{"key":34,"text":565,"correct":22},"施工组织设计",{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":430,"analysis":37},1157251,"单位工程施工组织设计的主要内容有（ ）。",[570,572,574,576,578],{"key":20,"text":571,"correct":26},"工程概况及施工特点分析",{"key":24,"text":573,"correct":26},"施工方案",{"key":28,"text":575,"correct":22},"施工总进度计划",{"key":31,"text":577,"correct":26},"各项资源需求量计划",{"key":34,"text":579,"correct":26},"单位工程施工平面图设计",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":67,"analysis":37},1157252,"下列选项中，专项施工方案内必须编制监测方案的是（ ）",[584,586,588,590,592],{"key":20,"text":585,"correct":26},"基坑支护",{"key":24,"text":587,"correct":26},"承重支架",{"key":28,"text":589,"correct":22},"高支架模板",{"key":31,"text":591,"correct":26},"大型脚手架",{"key":34,"text":593,"correct":22},"顶管施工",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":97,"analysis":37},1157253,"施工安全技术交底要求做好“四口”、“五临边”的防护措施，其中“四口”指（ ）。",[598,600,602,604,606],{"key":20,"text":599,"correct":26},"通道口",{"key":24,"text":601,"correct":22},"工地出入口",{"key":28,"text":603,"correct":26},"楼梯口",{"key":31,"text":605,"correct":26},"电梯井口",{"key":34,"text":607,"correct":26},"预留洞口",{"id":609,"libraryId":5,"type":15,"typeLabel":16,"stem":610,"options":611,"answer":185,"analysis":37},1157254,"施工项目产品具有（ ）的特点。",[612,614,616,618,620],{"key":20,"text":613,"correct":22},"重复性",{"key":24,"text":615,"correct":26},"多样性",{"key":28,"text":617,"correct":26},"固定性",{"key":31,"text":619,"correct":22},"地点不确定性",{"key":34,"text":621,"correct":26},"体积庞大",{"id":623,"libraryId":5,"type":15,"typeLabel":16,"stem":624,"options":625,"answer":82,"analysis":37},1157255,"根据《建设工程项目管理规范》GB\u002FT50326-2006，施工企业项目经理在承担项目施工管理过程中，应具有的权限有（ ）。",[626,628,630,632,634],{"key":20,"text":627,"correct":26},"参与项目招标、投标和合同签订",{"key":24,"text":629,"correct":26},"制定内部计酬办法",{"key":28,"text":631,"correct":26},"参与组建项目经理部",{"key":31,"text":633,"correct":22},"选择建立单位",{"key":34,"text":635,"correct":22},"选择分包入",{"id":637,"libraryId":5,"type":15,"typeLabel":16,"stem":638,"options":639,"answer":170,"analysis":37},1157256,"关于质量控制与质量管理的说法，正确的有（ ）。",[640,642,644,646,648],{"key":20,"text":641,"correct":22},"质量管理就是对施工作业技术活动的管理",{"key":24,"text":643,"correct":22},"质量控制的致力点在于构建完善的质量管理体系",{"key":28,"text":645,"correct":26},"质量控制是质量管理的-部分",{"key":31,"text":647,"correct":22},"建设工程质量控制活动只涉及施工阶段",{"key":34,"text":649,"correct":26},"质量控制活动包含作业技术活动和管理活动",{"id":651,"libraryId":5,"type":15,"typeLabel":16,"stem":652,"options":653,"answer":430,"analysis":37},1157257,"建设工程项目施工质量保证体系的内容有（ ）。",[654,655,656,658,659],{"key":20,"text":409,"correct":26},{"key":24,"text":411,"correct":26},{"key":28,"text":657,"correct":22},"项目施工质量记录",{"key":31,"text":413,"correct":26},{"key":34,"text":415,"correct":26},{"id":661,"libraryId":5,"type":15,"typeLabel":16,"stem":662,"options":663,"answer":141,"analysis":37},1157258,"下列关于施工项目目标控制的措施说法错误的是（ ）。",[664,666,668,670,672],{"key":20,"text":665,"correct":22},"建立完善的工程统计管理体系和统计制度属于信息管理措施",{"key":24,"text":667,"correct":26},"主要有组织措施、技术措施、合同措施、经济措施和管理措施",{"key":28,"text":669,"correct":22},"落实施工方案，在发生问题时，能适时调整工作之间的逻辑关系，加快实施进度属于技术措施",{"key":31,"text":671,"correct":26},"签订并实施关于工期和进度的经济承包责任制属于合同措施",{"key":34,"text":673,"correct":22},"落实各级进度控制的人员及其具体任务和工作责任属于组织措施",{"id":675,"libraryId":5,"type":15,"typeLabel":16,"stem":676,"options":677,"answer":36,"analysis":37},1157259,"分部（分项）工程施工组织设计的主要内容有（ ）。",[678,680,682,684,686],{"key":20,"text":679,"correct":22},"建设项目的工程概况",{"key":24,"text":681,"correct":26},"施工方法的选择",{"key":28,"text":683,"correct":26},"施工机械的选择",{"key":31,"text":685,"correct":26},"劳动力需求量计划",{"key":34,"text":687,"correct":26},"安全施工措施",{"id":689,"libraryId":5,"type":15,"typeLabel":16,"stem":690,"options":691,"answer":273,"analysis":37},1157260,"施工组织设计按编制对象可以分为（ ）",[692,693,694,695,697],{"key":20,"text":279,"correct":26},{"key":24,"text":281,"correct":26},{"key":28,"text":295,"correct":22},{"key":31,"text":696,"correct":22},"分项工程施工组织设计",{"key":34,"text":573,"correct":26},{"id":699,"libraryId":5,"type":15,"typeLabel":16,"stem":700,"options":701,"answer":712,"analysis":37},1157261,"下列工作中，属于施工阶段的有（ ）。",[702,704,706,708,710],{"key":20,"text":703,"correct":22},"组建项目经理部",{"key":24,"text":705,"correct":26},"严格履行合同，协调好与建设单位、监理单位、设计单位等相关单位的关系",{"key":28,"text":707,"correct":22},"项目经理组织编制《施工项目管理实施规划》",{"key":31,"text":709,"correct":22},"项目经理部编写开工报告",{"key":34,"text":711,"correct":26},"管理施工现场，实现文明施工","BE",{"id":714,"libraryId":5,"type":15,"typeLabel":16,"stem":715,"options":716,"answer":329,"analysis":37},1157262,"以下属于施工项目资源管理的内容的是（ ）。",[717,719,721,722,724],{"key":20,"text":718,"correct":26},"劳动力",{"key":24,"text":720,"correct":26},"材料",{"key":28,"text":487,"correct":26},{"key":31,"text":723,"correct":26},"机械设备",{"key":34,"text":725,"correct":22},"施工现场",[727,731,734,737,740,743],{"id":728,"name":729,"category":7,"favorite":730},1,"领导干部任职前廉政法规知识测试题",92,{"id":732,"name":733,"category":7,"favorite":728},595,"建筑结构与设备",{"id":735,"name":736,"category":7,"favorite":728},715,"招标采购专业知识与法律法规",{"id":738,"name":739,"category":7,"favorite":728},848,"市政方向-通用基础",{"id":741,"name":742,"category":7,"favorite":8},534,"BIM工程师",{"id":744,"name":742,"category":7,"favorite":8},535]