[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1157696":3},{"question":4,"library":19},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":9},1157696,817,3,"判断题","初凝过早，施工时没有足够的时间完成混凝土或砂浆的搅拌、运输、浇捣和砌筑等操作；水泥的终凝过迟，则会拖延施工工期。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,{"id":6,"name":20,"category":21,"favorite":22},"(标准员)基础知识","建筑工程",0]