[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1157574":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1157574,817,3,"判断题","在安排架设电线、敷设管网、修建铁路和修筑公路的施工程序时，场外需要由远而近，先主干后分支。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"在安排架设电线、敷设管网、修建铁路和修筑公路的施工程序时，场外需要由近而远，先主干后分支。",{"id":6,"name":21,"category":22,"favorite":23},"(标准员)基础知识","建筑工程",0]