[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1157559":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1157559,817,3,"判断题","工程变更只能由发包入同意后提出，承包人只能提出变更建议。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"工程变更（含设计变更、发包人提出的工程变更、监理工程师提出的工程变更，以及承包人提出并经监理工程师批准的变更）。",{"id":6,"name":21,"category":22,"favorite":23},"(标准员)基础知识","建筑工程",0]