[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1157543":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1157543,817,3,"判断题","质量管理的全过程若反复按照PDCA的循环周而复始地运转，质量难以得到有效",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"质量管理的全过程是反复按照PDCA的循环周而复始地运转，每运转一次，工程质量就提高一步。",{"id":6,"name":21,"category":22,"favorite":23},"(标准员)基础知识","建筑工程",0]