[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1157537":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},1157537,817,3,"判断题","建设工程项目施工成本控制应贯穿于项目从投标阶段开始直至竣工验收的全过",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"建设工程项目施工成本控制应贯穿于项目从投标阶段开始直至竣工验收的全过。",{"id":6,"name":21,"category":22,"favorite":23},"(标准员)基础知识","建筑工程",0]