[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1157334":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1157334,817,2,"多选题","建筑节能分部工程的质量验收，应在检验批、分项工程全部合格的基础上，进行（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","建筑围护结构的外墙承载实体检验",false,{"key":16,"text":17,"correct":18},"B","夏热冬冷地区的外窗气密性现场检测",true,{"key":20,"text":21,"correct":18},"C","系统节能性能检测",{"key":23,"text":24,"correct":14},"D","节能工艺检验",{"key":26,"text":27,"correct":18},"E","系统联合试运转与调试","BCE","建筑节能分部工程的质量验收，应在检验批、分项工程全部合格的基础上，进行夏热冬冷地区的外窗气密性现场检测、系统节能性能检测、系统联合试运转与调试。",{"id":6,"name":31,"category":32,"favorite":33},"(标准员)基础知识","建筑工程",0]