[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1157250":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1157250,817,2,"多选题","编制项目管理目标责任书依据是（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","项目合同文件",true,{"key":16,"text":17,"correct":14},"B","组织管理制度",{"key":19,"text":20,"correct":14},"C","项目管理规划大纲",{"key":22,"text":23,"correct":14},"D","组织的经营方针和目标",{"key":25,"text":26,"correct":27},"E","施工组织设计",false,"ABCD","编制项目管理目标责任书依据是项目合同文件、组织管理制度、项目管理规划大纲、组织的经营方针和目标。",{"id":6,"name":31,"category":32,"favorite":33},"(标准员)基础知识","建筑工程",0]