[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1157233":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1157233,817,2,"多选题","施工项目管理程序中需要经历（ ）阶段。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","投标及签订合同",true,{"key":16,"text":17,"correct":14},"B","施工准备",{"key":19,"text":20,"correct":14},"C","施工",{"key":22,"text":23,"correct":14},"D","竣工验收",{"key":25,"text":26,"correct":27},"E","使用中改造",false,"ABCD","施工项目管理程序中需要经历投标及签订合同、施工准备、施工、竣工验收阶段。",{"id":6,"name":31,"category":32,"favorite":33},"(标准员)基础知识","建筑工程",0]