[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1156960":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1156960,817,1,"单选题","《建设工程质量管理条例》中要求，施工单位向建设单位提交《工程质量保修书》时间是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","工程竣工验收合格后",false,{"key":16,"text":17,"correct":14},"B","工程竣工同时",{"key":19,"text":20,"correct":21},"C","提交工程竣工验收报告时",true,{"key":23,"text":24,"correct":14},"D","工程竣工结算后","《建设工程质量管理条例》中要求，施工单位应在提交工程竣工验收报告时向建设单位提交《工程质量保修书》。",{"id":6,"name":27,"category":28,"favorite":29},"(标准员)基础知识","建筑工程",0]