[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1156928":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1156928,817,1,"单选题","关于施工图报审和审核合格的时间，应为（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","基础及结构部分在开工前报审及完成审核",false,{"key":16,"text":17,"correct":14},"B","建筑部分开始施工前完成报审",{"key":19,"text":20,"correct":14},"C","根据工程进度可以边报审边施工",{"key":22,"text":23,"correct":24},"D","设计文件应在开工前完成报审和审核",true,"设计文件应在开工前完成报审和审核，未经审查批准的，不得使用。",{"id":6,"name":27,"category":28,"favorite":29},"(标准员)基础知识","建筑工程",0]