[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1156839":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1156839,817,1,"单选题","按照《建设工程施工合同文本》通用条款规定，隐蔽工程经验收达到工程质量符合标准规范和设计图纸等要求，但监理工程师验收后不在验收记录上签字，在以下（况下，施工单位可以继续进行隐蔽。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","经建设单位书面确认",false,{"key":16,"text":17,"correct":14},"B","经监理口头通知",{"key":19,"text":20,"correct":14},"C","经施工项目负责人确认",{"key":22,"text":23,"correct":24},"D","经过24小时",true,"监理工程师验收后不在验收记录上签字，在经过24小时，施工单位可以继续进行隐蔽。",{"id":6,"name":27,"category":28,"favorite":29},"(标准员)基础知识","建筑工程",0]