[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1156776":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1156776,817,1,"单选题","下列分部（分项）工程中，需要编制分部（分项）工程施工组织设计的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","零星土石方工程",false,{"key":16,"text":17,"correct":14},"B","场地平整",{"key":19,"text":20,"correct":14},"C","混凝土垫层工程",{"key":22,"text":23,"correct":24},"D","定向爆破工程",true,"定向爆破工程需要编制分部（分项）工程施工组织设计。",{"id":6,"name":27,"category":28,"favorite":29},"(标准员)基础知识","建筑工程",0]