[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1156766":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1156766,817,1,"单选题","项目经理部解体一般是在（ ）阶段。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","投标及签订合同",false,{"key":16,"text":17,"correct":14},"B","施工准备",{"key":19,"text":20,"correct":14},"C","施工阶段",{"key":22,"text":23,"correct":24},"D","竣工验收",true,"项目经理部解体一般是在竣工验收阶段。",{"id":6,"name":27,"category":28,"favorite":29},"(标准员)基础知识","建筑工程",0]