[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1156737":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1156737,817,1,"单选题","施工项目实施的过程是指，建筑业企业自（ ）开始到保修期满为止的全过程。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","工程施工投标",true,{"key":16,"text":17,"correct":18},"B","工程施工招标",false,{"key":20,"text":21,"correct":18},"C","签订施工承包合同",{"key":23,"text":24,"correct":18},"D","施工开工报告被批准日期","施工项目实施的过程是指，建筑业企业自工程施工投标开始到保修期满为止的全过程。",{"id":6,"name":27,"category":28,"favorite":29},"(标准员)基础知识","建筑工程",0]