[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1156719":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1156719,817,1,"单选题","建设项目的管理从（ ）开始。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","施工招投标",false,{"key":16,"text":17,"correct":14},"B","编制初步设计文件",{"key":19,"text":20,"correct":14},"C","施工图设计审查",{"key":22,"text":23,"correct":24},"D","项目建议书编制",true,"建设项目的管理从项目建议书编制开始。",{"id":6,"name":27,"category":28,"favorite":29},"(标准员)基础知识","建筑工程",0]