[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1156666":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1156666,817,1,"单选题","根据《建筑地基处理技术规范》JGJ79-2012，不适用水泥土搅拌桩复合地基处理的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","正常固结的淤泥素填土",false,{"key":16,"text":17,"correct":14},"B","素填土",{"key":19,"text":20,"correct":14},"C","可塑黏性土",{"key":22,"text":23,"correct":24},"D","密实的砂类土",true,"根据《建筑地基处理技术规范》JGJ79-2012，不适用水泥土搅拌桩复合地基处理的是密实的砂类土。",{"id":6,"name":27,"category":28,"favorite":29},"(标准员)基础知识","建筑工程",0]