[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1156640":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1156640,817,1,"单选题","（ ）适用于处理较厚软土和冲填土地基，多用于处理机场跑道、水工结构、道路、路堤、码头、岸坡等工程地基，对于泥炭等有机质沉积地基则不适用。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","换土垫层法",false,{"key":16,"text":17,"correct":18},"B","预压法",true,{"key":20,"text":21,"correct":14},"C","灰土挤密桩",{"key":23,"text":24,"correct":14},"D","深层密实法","预压法指的是为提高软弱地基的承载力和减少构造物建成后的沉降量，预先在拟建构造物的地基上施加一定静荷载，使地基土压密后再将荷载卸除的压实方法。预压法适用于淤泥质结土、淤泥与人工冲填土等软弱地基。",{"id":6,"name":27,"category":28,"favorite":29},"(标准员)基础知识","建筑工程",0]