[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1156181":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1156181,808,2,"多选题","在以投资回收期判断项目是否可行的过程中，采用的标准通常有()。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","投资回收期越短越好",true,{"key":16,"text":17,"correct":14},"B","投资回收期短于项目的寿命期即可接受",{"key":19,"text":20,"correct":21},"C","投资回收期短于项目的开发经营期即可接受",false,{"key":23,"text":24,"correct":21},"D","投资回收期越长越好",{"key":26,"text":27,"correct":14},"E","投资回收期短于基准投资回收期即可接受","ABE","C项，只要在项目的寿命期内将投入的总开发成本收回，即认为项目是可接受的，也就是说项目的投资回收期只要是短于项目的寿命期就是可接受的，D项，投资回收期越长意味着该投资项目收益率越低，投资风险也越大，所以投资回收期是越短越好，表示该投资项目能够在尽可能短的时间内收回投资。",{"id":6,"name":31,"category":32,"favorite":33},"物业经营管理","建筑工程",0]