[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1156088":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1156088,808,1,"单选题","以下成本中，属于指令性的成本是()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","目标成本",false,{"key":16,"text":17,"correct":14},"B","定额成本",{"key":19,"text":20,"correct":21},"C","计划成本",true,{"key":23,"text":24,"correct":14},"D","实际成本","计划成本，是指计划期经过预测而预算出来，并要求执行的物业经营管理成本。计划成本是指令性成本。",{"id":6,"name":27,"category":28,"favorite":29},"物业经营管理","建筑工程",0]