[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1155798":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1155798,807,2,"多选题","下列选项中，属于竣工图编制的依据文件的是()。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","施工图纸会审记录",true,{"key":16,"text":17,"correct":14},"B","设计变更通知单",{"key":19,"text":20,"correct":21},"C","总体工程图",false,{"key":23,"text":24,"correct":14},"D","隐蔽工程验收记录",{"key":26,"text":27,"correct":21},"E","给排水工程竣工图","ABD","竣工图编制的依据文件主要包括：设计施工图、施工图纸会审记录、设计变更通知单、技术联系核定单、隐蔽工程验收记录、质量事故报告及处理记录、建（构）筑物定位测量资料、其他涉及设计变更的文件材料。",{"id":6,"name":31,"category":32,"favorite":33},"物业管理综合能力","建筑工程",0]