[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1155255":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1155255,806,2,"多选题","物业管理项目前期运作的内容包括()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","工程质量保修",false,{"key":16,"text":17,"correct":18},"B","管理资源的完善与优化",true,{"key":20,"text":21,"correct":18},"C","管理制度和服务规范的完善",{"key":23,"text":24,"correct":18},"D","确定物业管理单项服务的分包",{"key":26,"text":27,"correct":14},"E","前期沟通协调","BCD","物业管理项目前期运作的内容包括：①管理资源的完善与优化。具体内容包括管理用房到位、物资配备到位、物业管理人员到位。②管理制度和服务规范的完善。③确定物业管理单项服务的分包。",{"id":6,"name":31,"category":32,"favorite":33},"物业管理实务","建筑工程",0]