[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1155252":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1155252,806,2,"多选题","在整个物业项目实施过程中，前期管理主要包括()。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","物业承接查验阶段",true,{"key":16,"text":17,"correct":14},"B","物业人住阶段",{"key":19,"text":20,"correct":14},"C","业主大会选聘物业服务企业阶段",{"key":22,"text":23,"correct":24},"D","建设阶段",false,{"key":26,"text":27,"correct":24},"E","竣工验收阶段","ABC","早期介入与前期物业管理的阶段划分如图4-1所示。图4&mdash;1早期介入与前期物业管理的阶段划分",{"id":6,"name":31,"category":32,"favorite":33},"物业管理实务","建筑工程",0]