[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1155244":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1155244,806,2,"多选题","物业服务企业早期介入参与的竣工验收包括()。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","单项工程竣工验收",true,{"key":16,"text":17,"correct":14},"B","分期工程竣工验收",{"key":19,"text":20,"correct":14},"C","综合竣工验收",{"key":22,"text":23,"correct":24},"D","大型市政工程竣工验收",false,{"key":26,"text":27,"correct":24},"E","家庭装修工程竣工验收","ABC","早期介入参与竣工验收阶段的介入内容主要是参与竣工验收。在各单项工程完工后，参与单项工程竣工验收；在分期建设的工程完工后，参与分期竣工验收；在工程全面竣工后，参与综合竣工验收。",{"id":6,"name":31,"category":32,"favorite":33},"物业管理实务","建筑工程",0]