[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1154877":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1154877,806,1,"单选题","“掌握验收情况，收集工程质量，功能配套”是物业管理早期介入的()的方法和要点。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","建设阶段",false,{"key":16,"text":17,"correct":14},"B","销售阶段",{"key":19,"text":20,"correct":14},"C","规划设计阶段",{"key":22,"text":23,"correct":24},"D","竣工验收阶段",true,"物业服务企业参与竣工验收，主要是为了掌握验收情况，收集工程质量、功能配套以及其他方面存在的遗留问题，为物业的承接查验做准备。在参与验收时，应随同相关验收组观看验收过程，了解验收人员、专家给施工或建设单位的意见、建议和验收结论。",{"id":6,"name":27,"category":28,"favorite":29},"物业管理实务","建筑工程",0]